Asmai, S. A., Abdullah, R. W., Hasan Basari, A. S., & Hussin, B. (2011). Application of multi-step time series prediction for industrial equipment prognostic.
Chicago Style (17th ed.) CitationAsmai, Siti Azirah, Rosmiza Wahida Abdullah, Abd Samad Hasan Basari, and Burairah Hussin. Application of Multi-step Time Series Prediction for Industrial Equipment Prognostic. 2011.
MLA (9th ed.) CitationAsmai, Siti Azirah, et al. Application of Multi-step Time Series Prediction for Industrial Equipment Prognostic. 2011.
Warning: These citations may not always be 100% accurate.