Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes

Bibliographic Details
Main Author: Soo, Kuo Yang
Format: Final Year Project / Dissertation / Thesis
Published: 2013
Subjects:
Online Access:http://eprints.utar.edu.my/985/
http://eprints.utar.edu.my/985/1/CSA%2D2013%2D0602020%2D1.pdf
_version_ 1848885360989306880
author Soo, Kuo Yang
author_facet Soo, Kuo Yang
author_sort Soo, Kuo Yang
building UTAR Institutional Repository
collection Online Access
first_indexed 2025-11-15T19:21:22Z
format Final Year Project / Dissertation / Thesis
id utar-985
institution Universiti Tunku Abdul Rahman
institution_category Local University
last_indexed 2025-11-15T19:21:22Z
publishDate 2013
recordtype eprints
repository_type Digital Repository
spelling utar-9852015-10-21T07:43:21Z Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes Soo, Kuo Yang TE Highway engineering. Roads and pavements 2013-07 Final Year Project / Dissertation / Thesis NonPeerReviewed application/pdf http://eprints.utar.edu.my/985/1/CSA%2D2013%2D0602020%2D1.pdf Soo, Kuo Yang (2013) Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes. Master dissertation/thesis, UTAR. http://eprints.utar.edu.my/985/
spellingShingle TE Highway engineering. Roads and pavements
Soo, Kuo Yang
Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
title Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
title_full Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
title_fullStr Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
title_full_unstemmed Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
title_short Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
title_sort solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
topic TE Highway engineering. Roads and pavements
url http://eprints.utar.edu.my/985/
http://eprints.utar.edu.my/985/1/CSA%2D2013%2D0602020%2D1.pdf