Public acceptance of smart flood mitigation in Puchong

In the past few years, flooding issue had become a frequent incident happened in the Puchong area. Although the government had allocated a huge budget in constructing the flood mitigation project, flooding issue still occurs frequently at the Damansara-Puchong Highway (LDP) located near the IOI Mall...

Full description

Bibliographic Details
Main Author: Chong, Jia Chen
Format: Final Year Project / Dissertation / Thesis
Published: 2024
Subjects:
Online Access:http://eprints.utar.edu.my/6415/
http://eprints.utar.edu.my/6415/1/1902390_FYP_Report_%2D_JIA_CHEN_CHONG.pdf
_version_ 1848886672378298368
author Chong, Jia Chen
author_facet Chong, Jia Chen
author_sort Chong, Jia Chen
building UTAR Institutional Repository
collection Online Access
description In the past few years, flooding issue had become a frequent incident happened in the Puchong area. Although the government had allocated a huge budget in constructing the flood mitigation project, flooding issue still occurs frequently at the Damansara-Puchong Highway (LDP) located near the IOI Mall in Puchong. Therefore, it is crucial for the authorities to resolve the problem that govern the public immediately. In order to improve the implementation of Smart Flood Mitigation in Puchong, this research study focuses on investigating the public acceptance on Smart Flood Mitigation in Puchong. The first objective established in this research study is to identify the variables affecting the public acceptance on Smart Flood Mitigation in Puchong. In this research study, there are four independent variables that affecting the public acceptance on Smart Flood Mitigation in Puchong which are the Perception, Awareness, Readiness, and Preparedness. In order to measure the relationship and the impact of the independent variables towards the dependent variable, questionnaire survey was designed to collect the opinion of the respondents. A total of 137 samples were collected and undergo analysis by using the SPSS software and SmartPLS 4. This research showed that the public readiness and public preparedness ranked at the top two that caused impacts towards the public acceptance on Smart Flood Mitigation in Puchong. The analyzed results proved that the public readiness is significant affecting the public acceptance on Smart Flood Mitigation in Puchong. This research study helps the government to review in order to effectively implement the Smart Flood Mitigation in the Puchong area to fight against the flooding issues.
first_indexed 2025-11-15T19:42:13Z
format Final Year Project / Dissertation / Thesis
id utar-6415
institution Universiti Tunku Abdul Rahman
institution_category Local University
last_indexed 2025-11-15T19:42:13Z
publishDate 2024
recordtype eprints
repository_type Digital Repository
spelling utar-64152024-06-19T01:52:56Z Public acceptance of smart flood mitigation in Puchong Chong, Jia Chen TA Engineering (General). Civil engineering (General) TD Environmental technology. Sanitary engineering In the past few years, flooding issue had become a frequent incident happened in the Puchong area. Although the government had allocated a huge budget in constructing the flood mitigation project, flooding issue still occurs frequently at the Damansara-Puchong Highway (LDP) located near the IOI Mall in Puchong. Therefore, it is crucial for the authorities to resolve the problem that govern the public immediately. In order to improve the implementation of Smart Flood Mitigation in Puchong, this research study focuses on investigating the public acceptance on Smart Flood Mitigation in Puchong. The first objective established in this research study is to identify the variables affecting the public acceptance on Smart Flood Mitigation in Puchong. In this research study, there are four independent variables that affecting the public acceptance on Smart Flood Mitigation in Puchong which are the Perception, Awareness, Readiness, and Preparedness. In order to measure the relationship and the impact of the independent variables towards the dependent variable, questionnaire survey was designed to collect the opinion of the respondents. A total of 137 samples were collected and undergo analysis by using the SPSS software and SmartPLS 4. This research showed that the public readiness and public preparedness ranked at the top two that caused impacts towards the public acceptance on Smart Flood Mitigation in Puchong. The analyzed results proved that the public readiness is significant affecting the public acceptance on Smart Flood Mitigation in Puchong. This research study helps the government to review in order to effectively implement the Smart Flood Mitigation in the Puchong area to fight against the flooding issues. 2024 Final Year Project / Dissertation / Thesis NonPeerReviewed application/pdf http://eprints.utar.edu.my/6415/1/1902390_FYP_Report_%2D_JIA_CHEN_CHONG.pdf Chong, Jia Chen (2024) Public acceptance of smart flood mitigation in Puchong. Final Year Project, UTAR. http://eprints.utar.edu.my/6415/
spellingShingle TA Engineering (General). Civil engineering (General)
TD Environmental technology. Sanitary engineering
Chong, Jia Chen
Public acceptance of smart flood mitigation in Puchong
title Public acceptance of smart flood mitigation in Puchong
title_full Public acceptance of smart flood mitigation in Puchong
title_fullStr Public acceptance of smart flood mitigation in Puchong
title_full_unstemmed Public acceptance of smart flood mitigation in Puchong
title_short Public acceptance of smart flood mitigation in Puchong
title_sort public acceptance of smart flood mitigation in puchong
topic TA Engineering (General). Civil engineering (General)
TD Environmental technology. Sanitary engineering
url http://eprints.utar.edu.my/6415/
http://eprints.utar.edu.my/6415/1/1902390_FYP_Report_%2D_JIA_CHEN_CHONG.pdf