The feasible use of the uk delay and disruption protocol in Malaysian construction industry
| Main Author: | Tan, Chuan Kee |
|---|---|
| Format: | Final Year Project / Dissertation / Thesis |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://eprints.utar.edu.my/599/ http://eprints.utar.edu.my/599/1/SCA%2D2012%2D1101350%2D1.pdf |
Similar Items
Revisiting U.K. Delay and Disruption Protocol: Distinguished Features for Contract Drafting
by: Chong, Heap Yih, et al.
Published: (2014)
by: Chong, Heap Yih, et al.
Published: (2014)
Delay and Disruption in Complex Projects
by: Ackermann, Fran, et al.
Published: (2011)
by: Ackermann, Fran, et al.
Published: (2011)
Causes and effects of delays in Malaysian construction industry
by: Sambasivan, Murali, et al.
Published: (2007)
by: Sambasivan, Murali, et al.
Published: (2007)
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
Causes and effect of delays in Aceh construction industry
by: Majid, Ibnu Abbas
Published: (2006)
by: Majid, Ibnu Abbas
Published: (2006)
Causality Analysis of Construction Delays and Value Engineering Protocols in Marine Projects
by: Karami, Hamidreza
Published: (2021)
by: Karami, Hamidreza
Published: (2021)
The Influence of k-Constant to Delay Performance of RI-MAC Protocol for Wireless Sensor Networks
by: Yong, Yueh-Tiam, et al.
Published: (2017)
by: Yong, Yueh-Tiam, et al.
Published: (2017)
The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach
by: Adeleke, A. Q., et al.
Published: (2021)
by: Adeleke, A. Q., et al.
Published: (2021)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
by: Btoush, Mohammed, et al.
Published: (2017)
by: Btoush, Mohammed, et al.
Published: (2017)
Effects Of Contractors’ Delay Factors On Building Project Performance Among Kuantan Malaysian Construction Industry
by: N.S.A, Samsudin, et al.
Published: (2020)
by: N.S.A, Samsudin, et al.
Published: (2020)
The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
by: Ghazali, Wardah Musfirah
Published: (2014)
by: Ghazali, Wardah Musfirah
Published: (2014)
Causes and effects of abuses in a feasibility study : a study in malaysian construction industry
by: Fong, Woan Shiuan
Published: (2013)
by: Fong, Woan Shiuan
Published: (2013)
Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
by: Irfanullah, Irfanullah, et al.
Published: (2023)
by: Irfanullah, Irfanullah, et al.
Published: (2023)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Smart contract and blockchain: disruptive or constructive to Islamic financial services in Malaysia
by: Mohd. Zain, Nor Razinah, et al.
Published: (2019)
by: Mohd. Zain, Nor Razinah, et al.
Published: (2019)
A theoretical framework on factors causing delay of construction industries projects
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Causes of delay in the building construction industry in major cities of Iran
by: Kouchaknezhad, Mehran
Published: (2011)
by: Kouchaknezhad, Mehran
Published: (2011)
Construction safety and performance in Malaysian construction industry: a review
by: Albarkani, Mosab Sultan Saeed, et al.
Published: (2021)
by: Albarkani, Mosab Sultan Saeed, et al.
Published: (2021)
Delay in design phase in Malaysia construction : the cause and the factor to reduce the delay
by: Noor Syazwani, Mohd Rizhuan
Published: (2019)
by: Noor Syazwani, Mohd Rizhuan
Published: (2019)
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)
by: Tan, Chin Keng, et al.
Published: (2020)
A special issue on disruptive technologies: shaping the future of the industry
by: Alyaseen, Imad Fakhri Taha
Published: (2019)
by: Alyaseen, Imad Fakhri Taha
Published: (2019)
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010)
by: Soon, Tan Kian
Published: (2010)
Feasibility study on the fabrication of eco-friendly construction material from dye industry wastewater treatment sludge
by: Toh, Wei Hong
Published: (2024)
by: Toh, Wei Hong
Published: (2024)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
Implementation of collateral warranties in Malaysian construction industry
by: Kazilan, Kuzaida
Published: (2007)
by: Kazilan, Kuzaida
Published: (2007)
Adoption of lean tools to control delays in Malaysian construction projects
by: Ansha, Richard Hannis
Published: (2016)
by: Ansha, Richard Hannis
Published: (2016)
Feasibility study on implementation of medium temperature solar thermal energy in industrial processes: a case study in Malaysia / Chin Chuan Kong
by: Chin, Chuan Kong
Published: (2012)
by: Chin, Chuan Kong
Published: (2012)
Delay-based Reliability Analysis on Construction Projects
by: Sorooshian, Shahryar
Published: (2014)
by: Sorooshian, Shahryar
Published: (2014)
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
Crisis Of Manpower Resources In Malaysian Construction Industry
by: Chen, Kok Wai
Published: (2013)
by: Chen, Kok Wai
Published: (2013)
3d Printing Modelling In Malaysian Construction Industry
by: Wong, Yinn Han, et al.
Published: (2016)
by: Wong, Yinn Han, et al.
Published: (2016)
Developing a model to predict time delay in road construction projects using bayesian networks
by: Mohammad, Almohammad
Published: (2020)
by: Mohammad, Almohammad
Published: (2020)
Causes and Solutions of Construction Crane Accidents in Malaysian Construction Industry
by: Kong, Sio Kah, et al.
Published: (2022)
by: Kong, Sio Kah, et al.
Published: (2022)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Disrupting the tobacco industry: exploring the motivations of E-Cigarette usage, using big data analytics
by: Tan, Su-lyn
Published: (2018)
by: Tan, Su-lyn
Published: (2018)
Similar Items
-
Revisiting U.K. Delay and Disruption Protocol: Distinguished Features for Contract Drafting
by: Chong, Heap Yih, et al.
Published: (2014) -
Delay and Disruption in Complex Projects
by: Ackermann, Fran, et al.
Published: (2011) -
Causes and effects of delays in Malaysian construction industry
by: Sambasivan, Murali, et al.
Published: (2007) -
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017) -
Causes and effect of delays in Aceh construction industry
by: Majid, Ibnu Abbas
Published: (2006)