Tan, C. K. (2012). The feasible use of the uk delay and disruption protocol in Malaysian construction industry.
Chicago Style (17th ed.) CitationTan, Chuan Kee. The Feasible Use of the Uk Delay and Disruption Protocol in Malaysian Construction Industry. 2012.
MLA (9th ed.) CitationTan, Chuan Kee. The Feasible Use of the Uk Delay and Disruption Protocol in Malaysian Construction Industry. 2012.
Warning: These citations may not always be 100% accurate.