Project coordination study of shareBIM on structural skeletal of a reinforced concrete building

Building Information Modelling (BIM) is implemented to improve coordination, planning, and management processes. The coordination and planning of BIM have been proven to reduce the communication and material procurement issues faced in the construction industry. This study aims to model and quantify...

Full description

Bibliographic Details
Main Author: Chong, Weng Khuen
Format: Final Year Project / Dissertation / Thesis
Published: 2022
Subjects:
Online Access:http://eprints.utar.edu.my/4950/
http://eprints.utar.edu.my/4950/1/1702293_FYP_Report_%2D_WENG_KHUEN_CHONG.pdf
_version_ 1848886285215727616
author Chong, Weng Khuen
author_facet Chong, Weng Khuen
author_sort Chong, Weng Khuen
building UTAR Institutional Repository
collection Online Access
description Building Information Modelling (BIM) is implemented to improve coordination, planning, and management processes. The coordination and planning of BIM have been proven to reduce the communication and material procurement issues faced in the construction industry. This study aims to model and quantify a project building's structural model and to describe how important ShareBIM functions as a communication platform during the design phase to complete the study. The objectives of this study are to model the structural framing in the Autodesk Revit model; quantify the beam, column, and slab elements; and perform a statistical analysis of concrete, rebar, and shear link costs and quantities. A set of high-rise reinforced concrete building drawings has been used as a reference to achieve the aim and objectives in this study. A 3D skeleton model is built in Autodesk Revit and exported to ShareBIM to conduct a collaboration check of clash issues between MEP and the architectural model. The finalized model has been conducted structural analysis in Esteem 9, then compute quantity take-off and perform statistical analysis for the cost and quantities of concrete, rebar, and shear links. In short, structural material procurement was computed at a value of RM3.314 million for this building. This study helps to reduce any uncertainties and arguments during actual construction.
first_indexed 2025-11-15T19:36:04Z
format Final Year Project / Dissertation / Thesis
id utar-4950
institution Universiti Tunku Abdul Rahman
institution_category Local University
last_indexed 2025-11-15T19:36:04Z
publishDate 2022
recordtype eprints
repository_type Digital Repository
spelling utar-49502022-12-23T12:53:05Z Project coordination study of shareBIM on structural skeletal of a reinforced concrete building Chong, Weng Khuen TA Engineering (General). Civil engineering (General) Building Information Modelling (BIM) is implemented to improve coordination, planning, and management processes. The coordination and planning of BIM have been proven to reduce the communication and material procurement issues faced in the construction industry. This study aims to model and quantify a project building's structural model and to describe how important ShareBIM functions as a communication platform during the design phase to complete the study. The objectives of this study are to model the structural framing in the Autodesk Revit model; quantify the beam, column, and slab elements; and perform a statistical analysis of concrete, rebar, and shear link costs and quantities. A set of high-rise reinforced concrete building drawings has been used as a reference to achieve the aim and objectives in this study. A 3D skeleton model is built in Autodesk Revit and exported to ShareBIM to conduct a collaboration check of clash issues between MEP and the architectural model. The finalized model has been conducted structural analysis in Esteem 9, then compute quantity take-off and perform statistical analysis for the cost and quantities of concrete, rebar, and shear links. In short, structural material procurement was computed at a value of RM3.314 million for this building. This study helps to reduce any uncertainties and arguments during actual construction. 2022 Final Year Project / Dissertation / Thesis NonPeerReviewed application/pdf http://eprints.utar.edu.my/4950/1/1702293_FYP_Report_%2D_WENG_KHUEN_CHONG.pdf Chong, Weng Khuen (2022) Project coordination study of shareBIM on structural skeletal of a reinforced concrete building. Final Year Project, UTAR. http://eprints.utar.edu.my/4950/
spellingShingle TA Engineering (General). Civil engineering (General)
Chong, Weng Khuen
Project coordination study of shareBIM on structural skeletal of a reinforced concrete building
title Project coordination study of shareBIM on structural skeletal of a reinforced concrete building
title_full Project coordination study of shareBIM on structural skeletal of a reinforced concrete building
title_fullStr Project coordination study of shareBIM on structural skeletal of a reinforced concrete building
title_full_unstemmed Project coordination study of shareBIM on structural skeletal of a reinforced concrete building
title_short Project coordination study of shareBIM on structural skeletal of a reinforced concrete building
title_sort project coordination study of sharebim on structural skeletal of a reinforced concrete building
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utar.edu.my/4950/
http://eprints.utar.edu.my/4950/1/1702293_FYP_Report_%2D_WENG_KHUEN_CHONG.pdf