Lam, P. X. (2016). Setup Time Reduction in a CNC Production Facility Through Redesign of Jigs and Fixtures.
Chicago Style (17th ed.) CitationLam, Pei Xian. Setup Time Reduction in a CNC Production Facility Through Redesign of Jigs and Fixtures. 2016.
MLA (9th ed.) CitationLam, Pei Xian. Setup Time Reduction in a CNC Production Facility Through Redesign of Jigs and Fixtures. 2016.
Warning: These citations may not always be 100% accurate.