FICT Final Year Project IDEAS Bank
| Main Author: | Leong, Wai Hang |
|---|---|
| Format: | Final Year Project / Dissertation / Thesis |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.utar.edu.my/1561/ http://eprints.utar.edu.my/1561/1/FICT_Final_Year_Project_IDEAS_Bank.pdf |
Similar Items
Online final year project system for FICT, UTAR using AMP technologies.
by: Lim, Shu Shin
Published: (2013)
by: Lim, Shu Shin
Published: (2013)
Development of final year project portal for engineering program
by: Gunawan, Teddy Surya, et al.
Published: (2011)
by: Gunawan, Teddy Surya, et al.
Published: (2011)
Associating Practising Engineers in Final Year Projects - A Case Study
by: Karuppanan , Saravanan, et al.
Published: (2003)
by: Karuppanan , Saravanan, et al.
Published: (2003)
Enhancing Conclusion Sections in Final Year Project Presentations: An Engineering Perspective
by: Wan Raihan, Wan Shaaidi, et al.
Published: (2024)
by: Wan Raihan, Wan Shaaidi, et al.
Published: (2024)
Interactive e-learning forum web application for FICT UTAR
by: Chai, Wan Xin
Published: (2021)
by: Chai, Wan Xin
Published: (2021)
Engineering technology curriculum development: bridging the gap between academia-industry through undergraduate final year project
by: Nurhidayah, Azmy, et al.
Published: (2018)
by: Nurhidayah, Azmy, et al.
Published: (2018)
An Augmented Reality (AR) indoor navigation mobile application for the Faculty of Information and Communication Technology (FICT)
by: Goh, Brian Joon Jian
Published: (2024)
by: Goh, Brian Joon Jian
Published: (2024)
Final Year Project Guideline
by: Nawanir, Gusman, et al.
Published: (2020)
by: Nawanir, Gusman, et al.
Published: (2020)
Final Year Project Guideline
by: Nawanir, Gusman, et al.
Published: (2019)
by: Nawanir, Gusman, et al.
Published: (2019)
The conclusiveness of final certificates
by: Tan, Ee Leen
Published: (2007)
by: Tan, Ee Leen
Published: (2007)
Poster Presentation for Final Year Project
by: Faculty of Cognitive Science and Human Development, Jabatan Kaunseling
Published: (2016)
by: Faculty of Cognitive Science and Human Development, Jabatan Kaunseling
Published: (2016)
AiNEX UMP pamer penyelidikan idea kreatif berinovasi
by: Nor Salwana, Mohammad Idris
Published: (2017)
by: Nor Salwana, Mohammad Idris
Published: (2017)
Final Year Project Presentation
by: Jamayah, Saili
Published: (2016)
by: Jamayah, Saili
Published: (2016)
Evaluating Safety Impact Factors in Construction Projects through Multi-Entity Collaboration Using AHP
by: Yue, Lan, et al.
Published: (2025)
by: Yue, Lan, et al.
Published: (2025)
University-Industry Collaboration Through
Engineering Final Year Project
by: Alhamrouni, Ibrahim, et al.
Published: (2016)
by: Alhamrouni, Ibrahim, et al.
Published: (2016)
The supervisor factor and undergraduates' confidence in completing their final year project
by: Ting, Su Hie, et al.
Published: (2014)
by: Ting, Su Hie, et al.
Published: (2014)
Final year project logbook portal
by: Murshida, Abdullah Kamil
Published: (2019)
by: Murshida, Abdullah Kamil
Published: (2019)
Powdered activated carbon for removal of phenol and treatment of palm oil mill final effluent
by: Ashraf, Qazi Mamoon, et al.
Published: (2017)
by: Ashraf, Qazi Mamoon, et al.
Published: (2017)
FTKPM Senior Project Showcase presents 146 research projects
by: Nor Salwana, Mohammad Idris
Published: (2023)
by: Nor Salwana, Mohammad Idris
Published: (2023)
Introducing arduino as an effective online distance learning
tool in final year project for chemical engineering student
by: Zainal Alama, Muhd Nazrul Hisham, et al.
Published: (2022)
by: Zainal Alama, Muhd Nazrul Hisham, et al.
Published: (2022)
Fiber Bragg Grating Gap Sensor as An Innovative Idea for Critical Flange Monitoring
by: Mohd Hafizi, Zohari
Published: (2022)
by: Mohd Hafizi, Zohari
Published: (2022)
Final year project (FYP) presentation timetable
by: Nur Asmira, Md Nor
Published: (2018)
by: Nur Asmira, Md Nor
Published: (2018)
Project Management Success For Post-Disaster Reconstruction Projects From The International Non-Governmental Organisations’ Perspectives
by: Ismail, Dzulkarnaen
Published: (2016)
by: Ismail, Dzulkarnaen
Published: (2016)
Simulation of focus-it final year lab queuing system
by: Nur Hazwani, Sapuan
Published: (2005)
by: Nur Hazwani, Sapuan
Published: (2005)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
A study on a simple and all-round GPS-based structure sonitoring system
by: Setan, Halim, et al.
Published: (2006)
by: Setan, Halim, et al.
Published: (2006)
A web data management application for education sector: a KICT online registration systems for final year project
by: Abdullahu, Muhamet, et al.
Published: (2011)
by: Abdullahu, Muhamet, et al.
Published: (2011)
EAA486 – Project Management
Duration : 1 hour
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2022)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2022)
Safety And Health Management At Construction Site Of Building Projects
by: Nurdin, Muhammad Ezam
Published: (2022)
by: Nurdin, Muhammad Ezam
Published: (2022)
Comparative Analyses on Disaggregation Methods for the Rainfall Projection
by: Wan Amirul Syahmi, Wan Mazlan, et al.
Published: (2023)
by: Wan Amirul Syahmi, Wan Mazlan, et al.
Published: (2023)
Multicriteria Decision Model for Road Construction Project
by: SN, Ramlay, et al.
Published: (2023)
by: SN, Ramlay, et al.
Published: (2023)
Representing of Green Building Through the Vital Lens: 10 Years of Diamond Building
by: Ng, Yan Chi
Published: (2020)
by: Ng, Yan Chi
Published: (2020)
The Masar Project: Design and Development
by: Koo, Voon Chet, et al.
Published: (2005)
by: Koo, Voon Chet, et al.
Published: (2005)
Final year project assessment system (FYPAS) / Ahmad Jamilizan Muhamad
by: Muhamad, Ahmad Jamilizan Muhamad
Published: (2014)
by: Muhamad, Ahmad Jamilizan Muhamad
Published: (2014)
Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
by: Syahir Amri, Musa
Published: (2014)
by: Syahir Amri, Musa
Published: (2014)
Critical Success Factors For Malaysian Contractors In International Construction Projects
by: Singh, Amarpreet Kaur Mahinder
Published: (2019)
by: Singh, Amarpreet Kaur Mahinder
Published: (2019)
Challenges in construction readiness for BIM-based building projects
by: Radzi, Afiqah R., et al.
Published: (2024)
by: Radzi, Afiqah R., et al.
Published: (2024)
Measuring safety rating in construction project (case study)
by: Mohamad Hafizuddin, Mohd Bakhri
Published: (2017)
by: Mohamad Hafizuddin, Mohd Bakhri
Published: (2017)
Final presentation schedule 2nd AWAM International Conference on Civil Engineering 2015 (AICCE15)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2015)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2015)
Progress monitoring system for student final year project
by: Siti Nurhidayah, Mohamad Khazali
Published: (2013)
by: Siti Nurhidayah, Mohamad Khazali
Published: (2013)
Similar Items
-
Online final year project system for FICT, UTAR using AMP technologies.
by: Lim, Shu Shin
Published: (2013) -
Development of final year project portal for engineering program
by: Gunawan, Teddy Surya, et al.
Published: (2011) -
Associating Practising Engineers in Final Year Projects - A Case Study
by: Karuppanan , Saravanan, et al.
Published: (2003) -
Enhancing Conclusion Sections in Final Year Project Presentations: An Engineering Perspective
by: Wan Raihan, Wan Shaaidi, et al.
Published: (2024) -
Interactive e-learning forum web application for FICT UTAR
by: Chai, Wan Xin
Published: (2021)