A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
This thesis addresses the job shop scheduling problem (JSSP) with the objective of minimising the makespan value. Tesis ini membincangkan masalah penskedulan kerja kedaian (JSSP) dengan objektif untuk meminimumkan masa operasi.
| Main Author: | Omar, Mahanim |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2008
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/9513/ http://eprints.usm.my/9513/1/A_MODIFIED_MULTI-STEP_CROSSOVER_FUSION_%28MSXF%29_IN_SOLVING_SOME_DETERMINISTIC_JOB_SHOP_SCHEDULING_PROBLEM_%28JSSP%29.pdf |
Similar Items
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
A Proposed Double Moving Average (DMA) Control Chart [TS156.8. W872 2007 f rb].
by: Wong, Voon Hee
Published: (2007)
by: Wong, Voon Hee
Published: (2007)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Effects of two-step post heat-treatment in palm oil on the properties of oil palm trunk particleboard
by: Hua, Lee Seng, et al.
Published: (2018)
by: Hua, Lee Seng, et al.
Published: (2018)
Machining feature-based system for supporting step-compliant milling process
by: Chen, Wong Keong
Published: (2017)
by: Chen, Wong Keong
Published: (2017)
Arcminute microkelvin imager observations of unmatched Planck ERCSC LFI sources at 15.75GHz
by: Perrott, Y., et al.
Published: (2012)
by: Perrott, Y., et al.
Published: (2012)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN - PEPERIKSAAN TAMBAHAN SIDANG 1992-93.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN -APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204-ATW222 - PENGURUSAN PENGELUARAN - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
EMG 240 - TEKNOLOGI PEMBUATAN I SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 340 - TEKNOLOGI PEMBUATAN II SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 470 - PENGURUSAN PENGELUARAN & SISTEM PEMBUATAN SEPT 1997
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 471 - MUTU & KEBOLEHPERCAYAAN APRIL 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1977)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1977)
EBB 513-3 - PENGURUSAN MUTU SEPT 1997.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1997)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1997)
EBB341-3 - QUALITY CONTROL - JUN 2008.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (2008)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (2008)
Similar Items
-
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004) -
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005) -
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007) -
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008) -
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)