Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
Mixed Model Assembly Line are widely used to produce different models as per customer's demands. Barisan Penggabungan Model Campuran digunakan secara meluas untuk menghasilkan model-model yang berbeza mengikut kehendak pelanggan.
| Main Author: | Ahmed, Fawad |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2008
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/8948/ http://eprints.usm.my/8948/1/COMPARATIVE_STUDY_BETWEEN_MIXED_MODEL_ASSEMBLY_LINE_AND_FLEXIBLE_ASSEMBLY_LINE_BASED_ON_COST_MINIMIZATION_APPROACH.pdf |
Similar Items
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Efficiency improvement of assembly line: case study of bus seat manufacturer
by: Yeoh, Kim Hao
Published: (2013)
by: Yeoh, Kim Hao
Published: (2013)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Design improvement of toner cartridge using design for assembly method
by: Hehsan, Haffidzudin, et al.
Published: (2020)
by: Hehsan, Haffidzudin, et al.
Published: (2020)
A Proposed Double Moving Average (DMA) Control Chart [TS156.8. W872 2007 f rb].
by: Wong, Voon Hee
Published: (2007)
by: Wong, Voon Hee
Published: (2007)
Line and wall follower hexapod robot
by: Ibrahim, Mohd Tarmizi
Published: (2011)
by: Ibrahim, Mohd Tarmizi
Published: (2011)
A study of micro to nano structure fine solid line printing for graphene ink by micro-flexographic printing method
by: Hassan, Suhaimi, et al.
Published: (2016)
by: Hassan, Suhaimi, et al.
Published: (2016)
EBB341-3 - QUALITY CONTROL - JUN 2008.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (2008)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (2008)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN - PEPERIKSAAN TAMBAHAN SIDANG 1992-93.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN -APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204-ATW222 - PENGURUSAN PENGELUARAN - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
EMG 240 - TEKNOLOGI PEMBUATAN I SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 340 - TEKNOLOGI PEMBUATAN II SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 470 - PENGURUSAN PENGELUARAN & SISTEM PEMBUATAN SEPT 1997
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 471 - MUTU & KEBOLEHPERCAYAAN APRIL 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1977)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1977)
EBB 513-3 - PENGURUSAN MUTU SEPT 1997.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1997)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1997)
EBB402-2 - KAWALAN MUTU - APRIL 1994.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1994)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1994)
EBB402-2 - KAWALAN MUTU - APRIL 1995.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1995)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1995)
EBB402-2 - KAWALAN MUTU - JUN 1992.
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1992)
by: PPKBSM, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral
Published: (1992)
Similar Items
-
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008) -
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008) -
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005) -
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008) -
Efficiency improvement of assembly line: case study of bus seat manufacturer
by: Yeoh, Kim Hao
Published: (2013)