Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
Performance-based Contract (PBC) was applied in Indonesia national road as new approchment to substitute traditional way as commonly used. There are issues affect to PBC because of overloading, side friction, swampy, emergency and disputes. By this reason, PBC was modified to Long Segment Mainten...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/62291/ http://eprints.usm.my/62291/1/Contractor%20Performance%20and%20operational%20cut.pdf |
| _version_ | 1848884942488993792 |
|---|---|
| author | Bulba, Alfa Taras |
| author_facet | Bulba, Alfa Taras |
| author_sort | Bulba, Alfa Taras |
| building | USM Institutional Repository |
| collection | Online Access |
| description | Performance-based Contract (PBC) was applied in Indonesia national road as
new approchment to substitute traditional way as commonly used. There are issues
affect to PBC because of overloading, side friction, swampy, emergency and
disputes. By this reason, PBC was modified to Long Segment Maintenance Contract
(LSMC). Local contractors is force to construct and maintain in the same time at the
length of territorial segment by performance measurement. However, due to of
cultural changes, contractors are not realizing and optimizing their performance. |
| first_indexed | 2025-11-15T19:14:43Z |
| format | Thesis |
| id | usm-62291 |
| institution | Universiti Sains Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T19:14:43Z |
| publishDate | 2019 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | usm-622912025-05-23T03:48:14Z http://eprints.usm.my/62291/ Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects Bulba, Alfa Taras TE1-450 Highway engineering. Roads and pavements Performance-based Contract (PBC) was applied in Indonesia national road as new approchment to substitute traditional way as commonly used. There are issues affect to PBC because of overloading, side friction, swampy, emergency and disputes. By this reason, PBC was modified to Long Segment Maintenance Contract (LSMC). Local contractors is force to construct and maintain in the same time at the length of territorial segment by performance measurement. However, due to of cultural changes, contractors are not realizing and optimizing their performance. 2019-07 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/62291/1/Contractor%20Performance%20and%20operational%20cut.pdf Bulba, Alfa Taras (2019) Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects. PhD thesis, Universiti Sains Malaysia. |
| spellingShingle | TE1-450 Highway engineering. Roads and pavements Bulba, Alfa Taras Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects |
| title | Contractor Performance And Operational Capabilities In Long
Segment Maintenance Of National
Road Delivery Projects |
| title_full | Contractor Performance And Operational Capabilities In Long
Segment Maintenance Of National
Road Delivery Projects |
| title_fullStr | Contractor Performance And Operational Capabilities In Long
Segment Maintenance Of National
Road Delivery Projects |
| title_full_unstemmed | Contractor Performance And Operational Capabilities In Long
Segment Maintenance Of National
Road Delivery Projects |
| title_short | Contractor Performance And Operational Capabilities In Long
Segment Maintenance Of National
Road Delivery Projects |
| title_sort | contractor performance and operational capabilities in long
segment maintenance of national
road delivery projects |
| topic | TE1-450 Highway engineering. Roads and pavements |
| url | http://eprints.usm.my/62291/ http://eprints.usm.my/62291/1/Contractor%20Performance%20and%20operational%20cut.pdf |