Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects

Performance-based Contract (PBC) was applied in Indonesia national road as new approchment to substitute traditional way as commonly used. There are issues affect to PBC because of overloading, side friction, swampy, emergency and disputes. By this reason, PBC was modified to Long Segment Mainten...

Full description

Bibliographic Details
Main Author: Bulba, Alfa Taras
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.usm.my/62291/
http://eprints.usm.my/62291/1/Contractor%20Performance%20and%20operational%20cut.pdf
_version_ 1848884942488993792
author Bulba, Alfa Taras
author_facet Bulba, Alfa Taras
author_sort Bulba, Alfa Taras
building USM Institutional Repository
collection Online Access
description Performance-based Contract (PBC) was applied in Indonesia national road as new approchment to substitute traditional way as commonly used. There are issues affect to PBC because of overloading, side friction, swampy, emergency and disputes. By this reason, PBC was modified to Long Segment Maintenance Contract (LSMC). Local contractors is force to construct and maintain in the same time at the length of territorial segment by performance measurement. However, due to of cultural changes, contractors are not realizing and optimizing their performance.
first_indexed 2025-11-15T19:14:43Z
format Thesis
id usm-62291
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T19:14:43Z
publishDate 2019
recordtype eprints
repository_type Digital Repository
spelling usm-622912025-05-23T03:48:14Z http://eprints.usm.my/62291/ Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects Bulba, Alfa Taras TE1-450 Highway engineering. Roads and pavements Performance-based Contract (PBC) was applied in Indonesia national road as new approchment to substitute traditional way as commonly used. There are issues affect to PBC because of overloading, side friction, swampy, emergency and disputes. By this reason, PBC was modified to Long Segment Maintenance Contract (LSMC). Local contractors is force to construct and maintain in the same time at the length of territorial segment by performance measurement. However, due to of cultural changes, contractors are not realizing and optimizing their performance. 2019-07 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/62291/1/Contractor%20Performance%20and%20operational%20cut.pdf Bulba, Alfa Taras (2019) Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects. PhD thesis, Universiti Sains Malaysia.
spellingShingle TE1-450 Highway engineering. Roads and pavements
Bulba, Alfa Taras
Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
title Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
title_full Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
title_fullStr Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
title_full_unstemmed Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
title_short Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects
title_sort contractor performance and operational capabilities in long segment maintenance of national road delivery projects
topic TE1-450 Highway engineering. Roads and pavements
url http://eprints.usm.my/62291/
http://eprints.usm.my/62291/1/Contractor%20Performance%20and%20operational%20cut.pdf