Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos

IBS may be defined as building systems in which structural components are manufactured in a factory, on or of site, transported and assembled into a complete structure with a minimal additional site works. Pre-cast concrete is a part of IBS that emphasizes safety in its practice. Nevertheless, u...

Full description

Bibliographic Details
Main Author: Nordin, Mohd Taufik
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2007
Subjects:
Online Access:http://eprints.usm.my/61189/
http://eprints.usm.my/61189/1/Tahap%20Penggunaan%20sistem%20bangunan%20cut.pdf
_version_ 1848884642574237696
author Nordin, Mohd Taufik
author_facet Nordin, Mohd Taufik
author_sort Nordin, Mohd Taufik
building USM Institutional Repository
collection Online Access
description IBS may be defined as building systems in which structural components are manufactured in a factory, on or of site, transported and assembled into a complete structure with a minimal additional site works. Pre-cast concrete is a part of IBS that emphasizes safety in its practice. Nevertheless, usage of Pre-cast concrete in Penang building industry is still very low if compared to the conventional methods because of easy in getting labour supply and low fees. Therefore, a research had been conducted to study the problems faced when using pre-cast concrete, the analysis of pre-cast concrete in buildings constructions in the aspect of its usage frequency, cost effect and benefits. The research is done in Penang, A set of 50 questionnaires were distributed to contractors and 18 had corresponded positively.
first_indexed 2025-11-15T19:09:57Z
format Monograph
id usm-61189
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T19:09:57Z
publishDate 2007
publisher Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-611892024-09-20T08:22:21Z http://eprints.usm.my/61189/ Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos Nordin, Mohd Taufik TH1-9745 Building construction IBS may be defined as building systems in which structural components are manufactured in a factory, on or of site, transported and assembled into a complete structure with a minimal additional site works. Pre-cast concrete is a part of IBS that emphasizes safety in its practice. Nevertheless, usage of Pre-cast concrete in Penang building industry is still very low if compared to the conventional methods because of easy in getting labour supply and low fees. Therefore, a research had been conducted to study the problems faced when using pre-cast concrete, the analysis of pre-cast concrete in buildings constructions in the aspect of its usage frequency, cost effect and benefits. The research is done in Penang, A set of 50 questionnaires were distributed to contractors and 18 had corresponded positively. Universiti Sains Malaysia 2007-04 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/61189/1/Tahap%20Penggunaan%20sistem%20bangunan%20cut.pdf Nordin, Mohd Taufik (2007) Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos. Project Report. Universiti Sains Malaysia. (Submitted)
spellingShingle TH1-9745 Building construction
Nordin, Mohd Taufik
Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos
title Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos
title_full Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos
title_fullStr Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos
title_full_unstemmed Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos
title_short Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam Industri Binaan Serta Impak Terhadap Kos
title_sort tahap penggunaan sistem bangunan berindustri (ibs); konkrit pratuang dalam industri binaan serta impak terhadap kos
topic TH1-9745 Building construction
url http://eprints.usm.my/61189/
http://eprints.usm.my/61189/1/Tahap%20Penggunaan%20sistem%20bangunan%20cut.pdf