Uph Improvement On Production Line A Case Study
In manufacturing industries, Lean Manufacturing is a broadly accepted philosophy. Initially, the Lean Manufacturing concept was started from the Toyota Production System (TPS). Nowadays, most of the manufacturers tend to implement lean manufacturing to improve their production and performance in ord...
| Main Author: | Nasir, Muhammad Amin Zaquan Mohd |
|---|---|
| Format: | Monograph |
| Language: | English |
| Published: |
Universiti Sains Malaysia
2019
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/58543/ http://eprints.usm.my/58543/1/Uph%20Improvement%20On%20Production%20Line%20A%20Case%20Study.pdf |
Similar Items
Improving Production Line Performance:A case study
by: Wan Mahmood, Wan Hasrulnizzam, et al.
Published: (2011)
by: Wan Mahmood, Wan Hasrulnizzam, et al.
Published: (2011)
Productivity Improvement Through Line Balancing at Electronic Company - Case Study
by: A. F. H., Fansuri, et al.
Published: (2018)
by: A. F. H., Fansuri, et al.
Published: (2018)
Improving productivity through line balancing : a case study
by: Lim, Chuan Pei, et al.
Published: (2002)
by: Lim, Chuan Pei, et al.
Published: (2002)
Simulation Study of a Vehicle Production Line for Productivity Improvement
by: M. F. F., Ab Rashid, et al.
Published: (2015)
by: M. F. F., Ab Rashid, et al.
Published: (2015)
Assembly line productivity improvement as re-engineered by MOST
by: Karim, A.N. Mustafizul, et al.
Published: (2016)
by: Karim, A.N. Mustafizul, et al.
Published: (2016)
A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
by: Mohd Suhaimi, Muhammad Farhan, et al.
Published: (2018)
by: Mohd Suhaimi, Muhammad Farhan, et al.
Published: (2018)
Production Layout Efficiency Improvement for Armoured Vehicle Assembly Line
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
Productivity and Efficiency Improvement Using Witness Simulation and Ergonomic Study in Automotive Assembly Line
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
Improving productivity using value stream mapping (VSM) - a case study
by: Ahmad Nasser, Mohd Rose, et al.
Published: (2019)
by: Ahmad Nasser, Mohd Rose, et al.
Published: (2019)
Cycle time improvement by lean Six Sigma for the Cutting Tool Production Line / Muhammad Syahmi Shahar and Noor Azlina Mohd Salleh
by: Shahar,, Muhammad Syahmi, et al.
Published: (2018)
by: Shahar,, Muhammad Syahmi, et al.
Published: (2018)
Assembly Line Efficiency Improvement by Using WITNESS Simulation Software
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2018)
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2018)
Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study
by: Masitah, Jusop, et al.
Published: (2016)
by: Masitah, Jusop, et al.
Published: (2016)
Triple Bottom Line Optimization for Sustainable Product Design
by: Zahari, Taha, et al.
Published: (2015)
by: Zahari, Taha, et al.
Published: (2015)
The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
by: Azizul Qayyum, Basri, et al.
Published: (2019)
by: Azizul Qayyum, Basri, et al.
Published: (2019)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
The study of extended single minute exchange of die (SMED) method in 1200 tonnage tandem press line for operation improvement
by: Azizul Qayyum, Basri, et al.
Published: (2017)
by: Azizul Qayyum, Basri, et al.
Published: (2017)
Improving Quality With Basic Statistical Process Control (SPC) Tools: A Case Study
by: Jafri, Mohd. Rohani, et al.
Published: (2001)
by: Jafri, Mohd. Rohani, et al.
Published: (2001)
Modelling Bottleneck Factors In A Production Line Using Hybrid Approach
by: Desa, Wan Laailatul Hanim Mat
Published: (2016)
by: Desa, Wan Laailatul Hanim Mat
Published: (2016)
Improving The Inventory Management In A Small And Medium Enterprise (SME) - A Case Study In A Printing Firm In Malaysia
by: Eunice, Wong Siaw Chui
Published: (2017)
by: Eunice, Wong Siaw Chui
Published: (2017)
A Development Of Optimal Buffer Allocation Determination
Method For Unbalanced Unpaced Production Line
by: Ismail, Mohd Shihabudin
Published: (2009)
by: Ismail, Mohd Shihabudin
Published: (2009)
Lean Improvement To Reduce Usage Rate Of Production Supplies
by: Ko, Peck Yin
Published: (2017)
by: Ko, Peck Yin
Published: (2017)
Development of framework for armoured vehicle assembly line efficiency improvement by using simulation analysis: Part 1
by: A. S. H. M., Yasir, et al.
Published: (2019)
by: A. S. H. M., Yasir, et al.
Published: (2019)
Product-Service System (PSS) for inventory control: Analysis using Delmia QUEST simulation modelling based on the production line
by: Farah Ameelia, Mohammad, et al.
Published: (2021)
by: Farah Ameelia, Mohammad, et al.
Published: (2021)
Production Layout Improvement for Steel Fabrication Works
by: N. M. Zuki, N. M., et al.
Published: (2014)
by: N. M. Zuki, N. M., et al.
Published: (2014)
Improving production system performance using overall equipment effectiveness
by: Lance, Clarence, et al.
Published: (2020)
by: Lance, Clarence, et al.
Published: (2020)
Line follower balbot
by: Tan, Piow Yon
Published: (2010)
by: Tan, Piow Yon
Published: (2010)
Product quality improvement through Poka Yoke technique
by: Lee, Ing Yi, et al.
Published: (2007)
by: Lee, Ing Yi, et al.
Published: (2007)
Case study method for new product development in engineer to order organisations
by: Abdul Rahim, Abd. Rahman, et al.
Published: (2003)
by: Abdul Rahim, Abd. Rahman, et al.
Published: (2003)
Improvement of boiling process in fish cracker production
by: Mohamad Nafis, Jamaluddin
Published: (2013)
by: Mohamad Nafis, Jamaluddin
Published: (2013)
Final Design Improvement Of Replica Trophy From Prototype To Mass Production
by: Tan, Sher Wen
Published: (2022)
by: Tan, Sher Wen
Published: (2022)
Automatic control and supervision using PC based monitoring and control system (PCMOC system) for 5 stations production line
by: Ghazali, K. H., et al.
Published: (2006)
by: Ghazali, K. H., et al.
Published: (2006)
A Numerical Study Laminar Forced Convection of Air for In-Line Bundle of Cylinders Crossflow
by: Tahseen, Tahseen Ahmad, et al.
Published: (2013)
by: Tahseen, Tahseen Ahmad, et al.
Published: (2013)
RCM Analysis of Process Equipment: A Case Study on Heat Exchanger
by: A Majid, Mohd Amin, et al.
Published: (2010)
by: A Majid, Mohd Amin, et al.
Published: (2010)
Data Mining On Retail Banking Simulation Model To Devise Productivity Improvement Strategies
by: Lai, Pin Siew
Published: (2019)
by: Lai, Pin Siew
Published: (2019)
Simulation and Fabrication of Open-Type Boiler of Fish Cracker Production Line
by: Mohd Zaidi, Sidek, et al.
Published: (2015)
by: Mohd Zaidi, Sidek, et al.
Published: (2015)
Improvement of productivity in low volume production industry layout by using witness simulation software
by: Jaffrey, V., et al.
Published: (2017)
by: Jaffrey, V., et al.
Published: (2017)
A Development Of Optimal Buffer Allocation Determination Method For Μ-Unbalanced Unpaced Production Line
by: Ismail, Mohd Shihabudin
Published: (2009)
by: Ismail, Mohd Shihabudin
Published: (2009)
A Brief Review of the Industrial Manipulators in Product-line
by: Abdolreza, Toudehdehghan, et al.
Published: (2022)
by: Abdolreza, Toudehdehghan, et al.
Published: (2022)
Development of straight line robot movement
by: Ching, Wai Hoong
Published: (2012)
by: Ching, Wai Hoong
Published: (2012)
A Study of Ikaz and Normalized Hilbert transform for solving faulty in pipeline distribution system using transmission line modelling
by: Hanafi, M. Yusop, et al.
Published: (2019)
by: Hanafi, M. Yusop, et al.
Published: (2019)
Similar Items
-
Improving Production Line Performance:A case study
by: Wan Mahmood, Wan Hasrulnizzam, et al.
Published: (2011) -
Productivity Improvement Through Line Balancing at Electronic Company - Case Study
by: A. F. H., Fansuri, et al.
Published: (2018) -
Improving productivity through line balancing : a case study
by: Lim, Chuan Pei, et al.
Published: (2002) -
Simulation Study of a Vehicle Production Line for Productivity Improvement
by: M. F. F., Ab Rashid, et al.
Published: (2015) -
Assembly line productivity improvement as re-engineered by MOST
by: Karim, A.N. Mustafizul, et al.
Published: (2016)