Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis

Bukit Merah Lake or Bukit Merah Reservoir is the first man-made lake in Malaysia located in the north of Perak which was built in 1906. Since the structure of the dam is aging, it would affect its effective function and some of the problems introduced regarding storage capacity. For this case study,...

Full description

Bibliographic Details
Main Author: Azhani, Aidatul Aznuraini Aidil
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2022
Subjects:
Online Access:http://eprints.usm.my/57503/
http://eprints.usm.my/57503/1/Determination%20Of%20Bukit%20Merah%20Reservoir%20Capacity%20Using%20Sequential%20Peak%20Analysis.pdf
_version_ 1848883640659869696
author Azhani, Aidatul Aznuraini Aidil
author_facet Azhani, Aidatul Aznuraini Aidil
author_sort Azhani, Aidatul Aznuraini Aidil
building USM Institutional Repository
collection Online Access
description Bukit Merah Lake or Bukit Merah Reservoir is the first man-made lake in Malaysia located in the north of Perak which was built in 1906. Since the structure of the dam is aging, it would affect its effective function and some of the problems introduced regarding storage capacity. For this case study, determination of Bukit Merah Reservoir storage capacity is the crucial step for preserving its water storage which influenced all the essential basic things such as irrigation, domestic and flood mitigation. A sequent peak algorithm is a technique designed primarily to estimate the size of active storage by tracking the inflows and outflows over an interval. It is the minimum storage capacity which is required for a reservoir to have been equal to the maximum of the deficit that occurs in a strict during a given period. The Sequent Peak Analysis is chosen because it is easy to program, suits with large data and considers evaporation losses compared to other methods which is Mass Curve Method. The reservoir is assumed to be full during the beginning of dry period. In addition, the issue of illegal encroachment and exploration activities led to reducing of storage capacity as sedimentation accumulated due to excess runoff. High rate of evaporation also contribute to this problem as there was El-Nino phenomenon occur in year 2016. It was concluded that Bukit Merah Reservoir is insufficient to accommodate irrigation and domestic supply as well as flood mitigation. The current water demand is high release compared to its capacity (92.8 MCM). Determining reservoir capacity is an important part of water resources development projects and sustains the needs in such a long-term period.
first_indexed 2025-11-15T18:54:02Z
format Monograph
id usm-57503
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T18:54:02Z
publishDate 2022
publisher Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-575032023-03-23T04:47:13Z http://eprints.usm.my/57503/ Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis Azhani, Aidatul Aznuraini Aidil T Technology TA Engineering (General). Civil engineering (General) Bukit Merah Lake or Bukit Merah Reservoir is the first man-made lake in Malaysia located in the north of Perak which was built in 1906. Since the structure of the dam is aging, it would affect its effective function and some of the problems introduced regarding storage capacity. For this case study, determination of Bukit Merah Reservoir storage capacity is the crucial step for preserving its water storage which influenced all the essential basic things such as irrigation, domestic and flood mitigation. A sequent peak algorithm is a technique designed primarily to estimate the size of active storage by tracking the inflows and outflows over an interval. It is the minimum storage capacity which is required for a reservoir to have been equal to the maximum of the deficit that occurs in a strict during a given period. The Sequent Peak Analysis is chosen because it is easy to program, suits with large data and considers evaporation losses compared to other methods which is Mass Curve Method. The reservoir is assumed to be full during the beginning of dry period. In addition, the issue of illegal encroachment and exploration activities led to reducing of storage capacity as sedimentation accumulated due to excess runoff. High rate of evaporation also contribute to this problem as there was El-Nino phenomenon occur in year 2016. It was concluded that Bukit Merah Reservoir is insufficient to accommodate irrigation and domestic supply as well as flood mitigation. The current water demand is high release compared to its capacity (92.8 MCM). Determining reservoir capacity is an important part of water resources development projects and sustains the needs in such a long-term period. Universiti Sains Malaysia 2022-08-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/57503/1/Determination%20Of%20Bukit%20Merah%20Reservoir%20Capacity%20Using%20Sequential%20Peak%20Analysis.pdf Azhani, Aidatul Aznuraini Aidil (2022) Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Awam. (Submitted)
spellingShingle T Technology
TA Engineering (General). Civil engineering (General)
Azhani, Aidatul Aznuraini Aidil
Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis
title Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis
title_full Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis
title_fullStr Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis
title_full_unstemmed Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis
title_short Determination Of Bukit Merah Reservoir Capacity Using Sequential Peak Analysis
title_sort determination of bukit merah reservoir capacity using sequential peak analysis
topic T Technology
TA Engineering (General). Civil engineering (General)
url http://eprints.usm.my/57503/
http://eprints.usm.my/57503/1/Determination%20Of%20Bukit%20Merah%20Reservoir%20Capacity%20Using%20Sequential%20Peak%20Analysis.pdf