The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak

Nowadays, construction industry has been exposed to lots of risks, especially delay. Construction project delay will lead to time overrun and cost overrun. Project budget will be overspent, extra time are needed to repair the damage due to delay, and finally project failure if this issue is not h...

Full description

Bibliographic Details
Main Author: Johnny, Wong Hing Kiong
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2021
Subjects:
Online Access:http://eprints.usm.my/57382/
http://eprints.usm.my/57382/1/The%20Key%20Critical%20Factors%20Towards%20Time%20Delay%20During%20The%20Construction%20Of%20Building%20And%20Infrastructure%20Projects%20In%20Sarawak.pdf
_version_ 1848883607804837888
author Johnny, Wong Hing Kiong
author_facet Johnny, Wong Hing Kiong
author_sort Johnny, Wong Hing Kiong
building USM Institutional Repository
collection Online Access
description Nowadays, construction industry has been exposed to lots of risks, especially delay. Construction project delay will lead to time overrun and cost overrun. Project budget will be overspent, extra time are needed to repair the damage due to delay, and finally project failure if this issue is not handled properly. Therefore, this research aims to identify the major factors as well as the key critical delay factors towards time delay during project construction in Malaysia. By acknowledging key critical delay factors, all parties will have high level of preparedness and better measures can be prepared earlier based on those critical factors. The research will be focusing on the building and infrastructure construction projects in Sarawak, Malaysia. 25 delay factors are collected from literature reviews in which they are categorized under owner, contractor, consultant, material, labor, and external factors. Questionnaire is prepared based on those factors and pilot survey is done to check the validity of questionnaire. After pilot survey, questionnaire interviews are conducted with 10 different contractor respondents. The collected data is then analyzed through Analytical Hierarchy Process (AHP) software, Expert Choice 11 to check for the priority importance of delay factors through pairwise comparisons. Finally, a sequential ranking is generated based on the global score for every compared delay factors. From the ranking, the most critical delay factors are low productivity of labors and unskilled workers which are both categorized under labor-related factor. Based on respondents, labor performance is crucial in delivering a construction project on time. These findings are helpful in providing a better guidance for construction communities to propose better mitigations based on the critical delay factors. Project managers can identify the problems earlier, thus minimizing time and cost overruns.
first_indexed 2025-11-15T18:53:30Z
format Monograph
id usm-57382
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T18:53:30Z
publishDate 2021
publisher Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-573822023-03-16T05:06:19Z http://eprints.usm.my/57382/ The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak Johnny, Wong Hing Kiong T Technology TA1-2040 Engineering (General). Civil engineering (General) Nowadays, construction industry has been exposed to lots of risks, especially delay. Construction project delay will lead to time overrun and cost overrun. Project budget will be overspent, extra time are needed to repair the damage due to delay, and finally project failure if this issue is not handled properly. Therefore, this research aims to identify the major factors as well as the key critical delay factors towards time delay during project construction in Malaysia. By acknowledging key critical delay factors, all parties will have high level of preparedness and better measures can be prepared earlier based on those critical factors. The research will be focusing on the building and infrastructure construction projects in Sarawak, Malaysia. 25 delay factors are collected from literature reviews in which they are categorized under owner, contractor, consultant, material, labor, and external factors. Questionnaire is prepared based on those factors and pilot survey is done to check the validity of questionnaire. After pilot survey, questionnaire interviews are conducted with 10 different contractor respondents. The collected data is then analyzed through Analytical Hierarchy Process (AHP) software, Expert Choice 11 to check for the priority importance of delay factors through pairwise comparisons. Finally, a sequential ranking is generated based on the global score for every compared delay factors. From the ranking, the most critical delay factors are low productivity of labors and unskilled workers which are both categorized under labor-related factor. Based on respondents, labor performance is crucial in delivering a construction project on time. These findings are helpful in providing a better guidance for construction communities to propose better mitigations based on the critical delay factors. Project managers can identify the problems earlier, thus minimizing time and cost overruns. Universiti Sains Malaysia 2021-08-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/57382/1/The%20Key%20Critical%20Factors%20Towards%20Time%20Delay%20During%20The%20Construction%20Of%20Building%20And%20Infrastructure%20Projects%20In%20Sarawak.pdf Johnny, Wong Hing Kiong (2021) The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Awam. (Submitted)
spellingShingle T Technology
TA1-2040 Engineering (General). Civil engineering (General)
Johnny, Wong Hing Kiong
The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
title The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
title_full The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
title_fullStr The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
title_full_unstemmed The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
title_short The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
title_sort key critical factors towards time delay during the construction of building and infrastructure projects in sarawak
topic T Technology
TA1-2040 Engineering (General). Civil engineering (General)
url http://eprints.usm.my/57382/
http://eprints.usm.my/57382/1/The%20Key%20Critical%20Factors%20Towards%20Time%20Delay%20During%20The%20Construction%20Of%20Building%20And%20Infrastructure%20Projects%20In%20Sarawak.pdf