Azhan, A. M. (2022). Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study. Universiti Sains Malaysia.
Chicago Style (17th ed.) CitationAzhan, Anis Masturina. Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study. Universiti Sains Malaysia, 2022.
MLA (9th ed.) CitationAzhan, Anis Masturina. Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study. Universiti Sains Malaysia, 2022.
Warning: These citations may not always be 100% accurate.