Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section

To stand up in today’s globalization world, manufacturers are searching for alternative to reduce production time and cost to improve operating performance. As set up time is non-value added process to customers, manufacturers want to reduce set up time in their operation as low as near to zero....

Full description

Bibliographic Details
Main Author: Loh, Hong Yi
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/53860/
http://eprints.usm.my/53860/1/Set%20Up%20Reduction%20On%20Sheet%20Metal%20Fabrication%20Company%20C%27s%20CNC%20Punching%20Section_Loh%20Hong%20Yi_M4_2017.pdf
_version_ 1848882644765376512
author Loh, Hong Yi
author_facet Loh, Hong Yi
author_sort Loh, Hong Yi
building USM Institutional Repository
collection Online Access
description To stand up in today’s globalization world, manufacturers are searching for alternative to reduce production time and cost to improve operating performance. As set up time is non-value added process to customers, manufacturers want to reduce set up time in their operation as low as near to zero. Company C, a sheet metal manufacturer want to achieve the same thing. This project is aim to provide positive result or impact on reduction of set up time in Company C’s CNC Punching operation. The objective of this project is to minimize trip to get material by operator and to minimize need of re-calibrate of die during set up.
first_indexed 2025-11-15T18:38:12Z
format Monograph
id usm-53860
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T18:38:12Z
publishDate 2017
publisher Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-538602022-08-07T06:41:25Z http://eprints.usm.my/53860/ Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section Loh, Hong Yi T Technology TJ Mechanical engineering and machinery To stand up in today’s globalization world, manufacturers are searching for alternative to reduce production time and cost to improve operating performance. As set up time is non-value added process to customers, manufacturers want to reduce set up time in their operation as low as near to zero. Company C, a sheet metal manufacturer want to achieve the same thing. This project is aim to provide positive result or impact on reduction of set up time in Company C’s CNC Punching operation. The objective of this project is to minimize trip to get material by operator and to minimize need of re-calibrate of die during set up. Universiti Sains Malaysia 2017-05-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/53860/1/Set%20Up%20Reduction%20On%20Sheet%20Metal%20Fabrication%20Company%20C%27s%20CNC%20Punching%20Section_Loh%20Hong%20Yi_M4_2017.pdf Loh, Hong Yi (2017) Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Mekanik. (Submitted)
spellingShingle T Technology
TJ Mechanical engineering and machinery
Loh, Hong Yi
Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section
title Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section
title_full Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section
title_fullStr Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section
title_full_unstemmed Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section
title_short Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section
title_sort set up reduction on sheet metal fabrication company c's cnc punching section
topic T Technology
TJ Mechanical engineering and machinery
url http://eprints.usm.my/53860/
http://eprints.usm.my/53860/1/Set%20Up%20Reduction%20On%20Sheet%20Metal%20Fabrication%20Company%20C%27s%20CNC%20Punching%20Section_Loh%20Hong%20Yi_M4_2017.pdf