Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry
Ground vibration result from blasting activity at Penjom Gold Mine has been classified as safe and secure based on the standard vibration level according to Departmen of Minerals and Geoscience of Malaysia with 0.4 mm/s – 2.39 mm/s actual PPV. However, the resident who live around the area within 17...
| Main Author: | |
|---|---|
| Format: | Monograph |
| Language: | English |
| Published: |
Universiti Sains Malaysia
2018
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/52964/ http://eprints.usm.my/52964/1/Attempt%20To%20Reducing%20The%20Ground%20Vibration%20Level%20Due%20To%20Blasting%20Activity%20Based%20On%20The%20Evaluation%20Of%20Blasting%20Geometry_Timothy%20Lambat%20Anak%20Bunyam_B1_2018.pdf |
| _version_ | 1848882394085457920 |
|---|---|
| author | Bunyam, Timothy Lambat |
| author_facet | Bunyam, Timothy Lambat |
| author_sort | Bunyam, Timothy Lambat |
| building | USM Institutional Repository |
| collection | Online Access |
| description | Ground vibration result from blasting activity at Penjom Gold Mine has been classified as safe and secure based on the standard vibration level according to Departmen of Minerals and Geoscience of Malaysia with 0.4 mm/s – 2.39 mm/s actual PPV. However, the resident who live around the area within 1700 meters radius may still can feel the ground vibration that could damage their houses. Therefore, it required geometric design and blasting patterns which is
expected to be able to reduce the level of ground vibration. The ground vibration is measured using vibrometer and expressed in peak particle velocity (PPV). The actual PPV value is required to find the SD (scaled distance) value with |
| first_indexed | 2025-11-15T18:34:13Z |
| format | Monograph |
| id | usm-52964 |
| institution | Universiti Sains Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T18:34:13Z |
| publishDate | 2018 |
| publisher | Universiti Sains Malaysia |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | usm-529642022-06-20T08:12:04Z http://eprints.usm.my/52964/ Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry Bunyam, Timothy Lambat T Technology TN Mining Engineering. Metallurgy Ground vibration result from blasting activity at Penjom Gold Mine has been classified as safe and secure based on the standard vibration level according to Departmen of Minerals and Geoscience of Malaysia with 0.4 mm/s – 2.39 mm/s actual PPV. However, the resident who live around the area within 1700 meters radius may still can feel the ground vibration that could damage their houses. Therefore, it required geometric design and blasting patterns which is expected to be able to reduce the level of ground vibration. The ground vibration is measured using vibrometer and expressed in peak particle velocity (PPV). The actual PPV value is required to find the SD (scaled distance) value with Universiti Sains Malaysia 2018-06-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/52964/1/Attempt%20To%20Reducing%20The%20Ground%20Vibration%20Level%20Due%20To%20Blasting%20Activity%20Based%20On%20The%20Evaluation%20Of%20Blasting%20Geometry_Timothy%20Lambat%20Anak%20Bunyam_B1_2018.pdf Bunyam, Timothy Lambat (2018) Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Bahan dan Sumber Mineral. (Submitted) |
| spellingShingle | T Technology TN Mining Engineering. Metallurgy Bunyam, Timothy Lambat Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry |
| title | Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry |
| title_full | Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry |
| title_fullStr | Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry |
| title_full_unstemmed | Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry |
| title_short | Attempt To Reducing The Ground Vibration Level Due To Blasting Activity Based On The Evaluation Of Blasting Geometry |
| title_sort | attempt to reducing the ground vibration level due to blasting activity based on the evaluation of blasting geometry |
| topic | T Technology TN Mining Engineering. Metallurgy |
| url | http://eprints.usm.my/52964/ http://eprints.usm.my/52964/1/Attempt%20To%20Reducing%20The%20Ground%20Vibration%20Level%20Due%20To%20Blasting%20Activity%20Based%20On%20The%20Evaluation%20Of%20Blasting%20Geometry_Timothy%20Lambat%20Anak%20Bunyam_B1_2018.pdf |