A Comparative Study Between Public And Private Procurement System In Building Projects In Malaysia
This thesis was undertaken to survey the perception and selection of client in Malaysia including the public and private sector on the types of procurement system „used‟ and „preferred‟, the problems arising based on the procurement „used‟ and also the satisfaction level between both sectors of clie...
| Main Author: | Radzi, Nurhidayah Mohd |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/46315/ http://eprints.usm.my/46315/1/Nurhidayah%20Bt%20Mohd%20Radzi_HJ.pdf |
Similar Items
Impact Of Building Envelope Modifications On The Thermal Performance Of Glazed High-Rise Residential Buildings In The Tropics
by: Al-Tamimi, Nedhal Ahmed Mahmoud
Published: (2011)
by: Al-Tamimi, Nedhal Ahmed Mahmoud
Published: (2011)
Comparative study on the Malaysian sustainable building rating systems
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
E-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
Leisure Preference For People Place At Shopping Malls In Kuala Lumpur And Petaling Jaya, Malaysia
by: Hamat, Sufian
Published: (2012)
by: Hamat, Sufian
Published: (2012)
Kajian Terhadap Amalan Terbaik
Pengurusan Projek Di Bawah
Pengawasan Jabatan Kerja Raya
by: Aziz, Mohamad
Published: (2015)
by: Aziz, Mohamad
Published: (2015)
Durability Properties Of Stabilized Earth Blocks
by: Al-Sakkaf, Yaser Khaled Abdulrahman
Published: (2009)
by: Al-Sakkaf, Yaser Khaled Abdulrahman
Published: (2009)
EAS 353-3 - REKABENTUK STRUKTUR KONKRIT BERTETULANG OKTOBER 04.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2004)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2004)
RMK 437- Penilaian (September 1997)
by: PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
Published: (1997)
by: PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
Published: (1997)
Stakeholder Collaboration On
Conservation Of Natural Resources In Lower Kinabatangan Sabah
by: Pimid, Marcela
Published: (2018)
by: Pimid, Marcela
Published: (2018)
Development Of Supersulfated Self-Consolidating Concrete Incorporating High-Volume Of Industrial By-Products
by: Jasme, Nurshafarina
Published: (2020)
by: Jasme, Nurshafarina
Published: (2020)
A Study Of The Traditional Characteristics Of Yemeni
Houses In The Port City Of Aden And Mukalla: Perception Of
Architects And Students
by: Binthabet, Aqeil Ahmed
Published: (2007)
by: Binthabet, Aqeil Ahmed
Published: (2007)
Benefits for public healthcare buildings towards Net Zero
Energy Buildings (NZEBs): initial reviews
by: Sulzakimin, M. Sulzakimin, et al.
Published: (2020)
by: Sulzakimin, M. Sulzakimin, et al.
Published: (2020)
Comparative study on the perspective towards the benefits and hindrances of implementing building information modelling (BIM)
by: Ang, Peniel Soon Ern, et al.
Published: (2020)
by: Ang, Peniel Soon Ern, et al.
Published: (2020)
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)
by: Mohd Amin, Mohamad Ariff
Published: (2021)
RET 523 – ENERGY AND BUILDING MAINTENANCE APR MAY 2010.
by: PPPBP, Pusat Pengajian Perumahan Bangunan Dan Perancangan
Published: (2010)
by: PPPBP, Pusat Pengajian Perumahan Bangunan Dan Perancangan
Published: (2010)
Improving communication between client and contractor during construction project in Nigerian construction industry
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
Simulation On The Effect Of Water Absorption On The Strength Of Masonry Wall
by: Chow , Shiao Teng
Published: (2006)
by: Chow , Shiao Teng
Published: (2006)
Natural ventilation for energy efficient office buildings: a comparative analysis on three buildings in Kuala Lumpur
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Critical success factor model framework for lean management application in industrialised building system (IBS) production
by: Mohd Noor, Siti Rahimah
Published: (2020)
by: Mohd Noor, Siti Rahimah
Published: (2020)
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020)
by: Karunakaran, Priyadatchini
Published: (2020)
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
Developing building information modelling (BIM) implementation model for project design team
by: Mohd, Suzila, et al.
Published: (2017)
by: Mohd, Suzila, et al.
Published: (2017)
The impact of material management on construction project delivery in Somalia
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
The awareness of ICT implementation for materials management in construction projects
by: Kasim, Narimah, et al.
Published: (2010)
by: Kasim, Narimah, et al.
Published: (2010)
Perceptions of developers in green home project in Kuala Lumpur
by: Alsaeedi, Yaser Abdulwahab Ali
Published: (2019)
by: Alsaeedi, Yaser Abdulwahab Ali
Published: (2019)
Interior design and construction project management: performance and productivity in Malaysian building industry
by: Jasmani, Ismail
Published: (2016)
by: Jasmani, Ismail
Published: (2016)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Factors affecting quality in Construction Project Life Cycle (CPLC)
by: Yaman, Siti Khalijah, et al.
Published: (2022)
by: Yaman, Siti Khalijah, et al.
Published: (2022)
Study on promote occupational safety and health practices in construction projects
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018)
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018)
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
Decision-making process framework at the planning phase of housing development project
by: Mohd Sofberi, Nurul Atiqah
Published: (2021)
by: Mohd Sofberi, Nurul Atiqah
Published: (2021)
Exploration to find green building materials from recycled solid wastes
by: Din, Abdul Talib, et al.
Published: (2018)
by: Din, Abdul Talib, et al.
Published: (2018)
Examining risk as guideline in design stage for green
retrofits projects: a review
by: M. S. N., Lee, et al.
Published: (2020)
by: M. S. N., Lee, et al.
Published: (2020)
Critical information infrastructure protection requirement for the Malaysia public sector
by: Mohd Sabtu, Saiful Bahari, et al.
by: Mohd Sabtu, Saiful Bahari, et al.
Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
Critical success factors model (CSF’sM) affecting the competencies of civil engineer in construction project
by: Ismail, Hassan
Published: (2020)
by: Ismail, Hassan
Published: (2020)
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019)
by: AL-Fadhali, Najib, et al.
Published: (2019)
Similar Items
-
Impact Of Building Envelope Modifications On The Thermal Performance Of Glazed High-Rise Residential Buildings In The Tropics
by: Al-Tamimi, Nedhal Ahmed Mahmoud
Published: (2011) -
Comparative study on the Malaysian sustainable building rating systems
by: Mohammed Usman, Abdullahi, et al.
Published: (2018) -
E-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017) -
Leisure Preference For People Place At Shopping Malls In Kuala Lumpur And Petaling Jaya, Malaysia
by: Hamat, Sufian
Published: (2012) -
Kajian Terhadap Amalan Terbaik
Pengurusan Projek Di Bawah
Pengawasan Jabatan Kerja Raya
by: Aziz, Mohamad
Published: (2015)