Second Semester Examination 2018/2019 Academic Session June 2019 EAL235 – Highway and Traffic Engineering (Kejuruteraan Lebuh Raya dan Lalu Lintas) Duration: 2 hours (Masa: 2 jam)
| Main Author: | Awam, Pusat pengajian Kejuruteraan |
|---|---|
| Format: | Teaching Resource |
| Language: | English |
| Published: |
Universiti Sains Malaysia
2019
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/45147/ http://eprints.usm.my/45147/1/EAL235.pdf |
Similar Items
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL235 – Highway and Traffic Engineering [Kejuruteraan Lebuh Raya dan Lalu Lintas] Duration: 2 hours [Masa: 2 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAL431 – Highway Design
(Reka Bentuk Lebuh Raya) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017)
by: Sohu, S, et al.
Published: (2017)
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007)
by: Sanik, Mohd Erwan
Published: (2007)
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003)
by: Othman, Asri
Published: (2003)
Ciri laju-aliran jalan arteri : kajian kes di Butterworth, Pulau Pinang, Malaysia [TE175. S961 2005 f rb].
by: Haron, Suria
Published: (2005)
by: Haron, Suria
Published: (2005)
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)
by: Hartatik, Nurani, et al.
Published: (2021)
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
EAL235 – HIGHWAY AND TRAFFIC ENGINEERING
[KEJURUTERAAN LEBUH RAYA DAN LALU LINTAS] (AUGUST 2017)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2017)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2017)
REG 463 - REKABENTUK JALAN DAN LABUH RAYA APRIL 1993.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018)
by: Ammar, Adnan, et al.
Published: (2018)
Effect of hatched marking length on entering position among motorcyclists during merging in expressway
by: Adnan, Ammar, et al.
Published: (2018)
by: Adnan, Ammar, et al.
Published: (2018)
Carbon nanomaterials derived from Malaysia’s highway road asphalt waste as electrode for supercapacitor
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL432 –Advanced Transportation and Highway Engineering [Kejuruteraan Lebuhraya dan Pengangkutan Lanjutan] Duration: 3 hours
[Masa: 3 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
EAL 235 HIGHWAY AND TRAFFIC ENGINEERING (JUN 2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
EAL 231-3 - KEJURUTERAAN PENGANGKUTAN & LALU LINTAS SEPT 1997.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
EAL 334-4 - KEJURUTERAAN LEBUH RAYA OKTOBER 04.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2004)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2004)
RPK 334 - PERANCANGAN LALU LINTAS OKT 04.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (2004)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (2004)
RPK 334 - PERANCANGAN LALU LINTAS NOV 05.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (2005)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (2005)
RPK 334 - PERANCANGAN LALU LINTAS OKT 04.
by: HBP, School of Housing Building & Planing
Published: (2004)
by: HBP, School of Housing Building & Planing
Published: (2004)
EAL 573(4) - KEJURUTERAAN LALU LINTAS APRIL 03
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2003)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2003)
Estimation of the design elements of horizontal alignment by the method of least squares/Jalina Rabi
by: Rabi, Jalina
Published: (2006)
by: Rabi, Jalina
Published: (2006)
Modeling of traffic movements in Seberang Perai Utara, Penang, Malaysia using OmniTRANS / Muhamad Fairul Samsudin
by: Samsudin, Muhamad Fairul
Published: (2006)
by: Samsudin, Muhamad Fairul
Published: (2006)
EAL 335(4) - KEJURUTERAAN PENGANGKUTAN DAN LALU LINTAS MAC 05
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2005)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2005)
EAJ 434-4 - KEJURUTERAAN LALU LINTAS DAN PENGANGKUTAN LANJUTAN SEPT 1997.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
JAJ 232/3 - Kejuruteraan Pengangkutan Dan Lalu Lintas - Mei - Jun 1995
by: PPPJJ, Pusat Pengajian Pendidikan Jarak Jauh
Published: (1995)
by: PPPJJ, Pusat Pengajian Pendidikan Jarak Jauh
Published: (1995)
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
by: Maslan, Masfarizan
Published: (2003)
by: Maslan, Masfarizan
Published: (2003)
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996)
by: Ya'cub, Mohamad
Published: (1996)
EAJ 432-3 - KEJURUTERAAN LEBUH RAYA LANJUTAN APRIL 1997.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
by: Asmalia, Che Ahmad, et al.
Published: (2015)
by: Asmalia, Che Ahmad, et al.
Published: (2015)
REG 463-4 - REKABENTUK JALAN DAN LEBUH RAYA APRIL 1996
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1996)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1996)
JAJ 232/3 - Kejuruteraan Pengangkutan Dan Lalu Lintas - Mei - Jun 1995
by: PPPJJ, Pusat Pengajian Pendidikan Jarak Jauh
Published: (1995)
by: PPPJJ, Pusat Pengajian Pendidikan Jarak Jauh
Published: (1995)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAL337 – Pavement Engineering
(Kejuruteraan Turapan) Duration: 3 hours (Masa: 3 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
The effect of reclaimed asphalt pavement (RAP) proportion on strength properties of a full depth recycling pavement / Roziawati Razali
by: Razali, Roziawati
Published: (2010)
by: Razali, Roziawati
Published: (2010)
UMP, MBK bakal berkolaborasi dalam pengurusan sistem lalu lintas dan pengangkutan awam yang efektif
by: Mimi Rabita, Abdul Wahit
Published: (2022)
by: Mimi Rabita, Abdul Wahit
Published: (2022)
Subsidence prediction along the karak highway by 2-d electrical imaging geophysical method
by: Saad, Rosli, et al.
Published: (2008)
by: Saad, Rosli, et al.
Published: (2008)
EAL 571(4) - REKABENTUK TURAPAN APRIL 03
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2003)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2003)
REG 366 - JALAN DAN LEBUHRAYA FEB 04.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (2004)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (2004)
Development Of Entrance Ramp Merging Density Model
Based On An Urban Expressway Traffic Condition.
by: Adnan, Muhammad Akram
Published: (2007)
by: Adnan, Muhammad Akram
Published: (2007)
Contractor Performance And Operational Capabilities In Long
Segment Maintenance Of National
Road Delivery Projects
by: Bulba, Alfa Taras
Published: (2019)
by: Bulba, Alfa Taras
Published: (2019)
Similar Items
-
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL235 – Highway and Traffic Engineering [Kejuruteraan Lebuh Raya dan Lalu Lintas] Duration: 2 hours [Masa: 2 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017) -
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAL431 – Highway Design
(Reka Bentuk Lebuh Raya) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019) -
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017) -
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007) -
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003)