Improve On Time Delivery: A Case Study At Jm Flour Mill

On time delivery is view as a key performance indicator for warehouse and logistic departments. The delivery performance indicated how effective the supply chain is at supplying products to the customer and the customer satisfaction level. Present research is focused on a case study conducted in a f...

Full description

Bibliographic Details
Main Author: Ong, Wen Ing
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.usm.my/44381/
http://eprints.usm.my/44381/1/ONG%20WEN%20ING.pdf
_version_ 1848880044182601728
author Ong, Wen Ing
author_facet Ong, Wen Ing
author_sort Ong, Wen Ing
building USM Institutional Repository
collection Online Access
description On time delivery is view as a key performance indicator for warehouse and logistic departments. The delivery performance indicated how effective the supply chain is at supplying products to the customer and the customer satisfaction level. Present research is focused on a case study conducted in a flour mill in Malaysia. In this study, the importance is highlighted and the causes of the delivery issues are investigated. For this study, in-depth interview was carried out and data was analysed from the flour mill to investigate the issues.
first_indexed 2025-11-15T17:56:52Z
format Thesis
id usm-44381
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T17:56:52Z
publishDate 2014
recordtype eprints
repository_type Digital Repository
spelling usm-443812019-05-23T01:01:44Z http://eprints.usm.my/44381/ Improve On Time Delivery: A Case Study At Jm Flour Mill Ong, Wen Ing HF5001-6182 Business On time delivery is view as a key performance indicator for warehouse and logistic departments. The delivery performance indicated how effective the supply chain is at supplying products to the customer and the customer satisfaction level. Present research is focused on a case study conducted in a flour mill in Malaysia. In this study, the importance is highlighted and the causes of the delivery issues are investigated. For this study, in-depth interview was carried out and data was analysed from the flour mill to investigate the issues. 2014 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/44381/1/ONG%20WEN%20ING.pdf Ong, Wen Ing (2014) Improve On Time Delivery: A Case Study At Jm Flour Mill. Masters thesis, Universiti Sains Malaysia.
spellingShingle HF5001-6182 Business
Ong, Wen Ing
Improve On Time Delivery: A Case Study At Jm Flour Mill
title Improve On Time Delivery: A Case Study At Jm Flour Mill
title_full Improve On Time Delivery: A Case Study At Jm Flour Mill
title_fullStr Improve On Time Delivery: A Case Study At Jm Flour Mill
title_full_unstemmed Improve On Time Delivery: A Case Study At Jm Flour Mill
title_short Improve On Time Delivery: A Case Study At Jm Flour Mill
title_sort improve on time delivery: a case study at jm flour mill
topic HF5001-6182 Business
url http://eprints.usm.my/44381/
http://eprints.usm.my/44381/1/ONG%20WEN%20ING.pdf