P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor
The objective of this study is to compare the performance of sequencing batch biofilm reactor (SBBR) and sequencing batch reactor (SBR) in treating p-chlorophenol (PCP) and nitrogen. The SBR and SBBR systems were operated in five sequential periods, namely FILL, REACT (aerobic and anoxic), SETTLE, D...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2011
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/43420/ http://eprints.usm.my/43420/1/MUNA%20MASTURA%20%20MOHAMAD.pdf |
| _version_ | 1848879808679772160 |
|---|---|
| author | Mohamad, Muna Mastura |
| author_facet | Mohamad, Muna Mastura |
| author_sort | Mohamad, Muna Mastura |
| building | USM Institutional Repository |
| collection | Online Access |
| description | The objective of this study is to compare the performance of sequencing batch biofilm reactor (SBBR) and sequencing batch reactor (SBR) in treating p-chlorophenol (PCP) and nitrogen. The SBR and SBBR systems were operated in five sequential periods, namely FILL, REACT (aerobic and anoxic), SETTLE, DRAW and IDLE in the time ratio of 2:12:1:1:8 for a cycle time of 24 h. The SBR was used as the control reactor (RC) while the other two SBBRs, RB1 and RB2, were operated with 3 and 5% (v/v) of polyurethane foam cubes as the carrier materials, respectively. |
| first_indexed | 2025-11-15T17:53:07Z |
| format | Thesis |
| id | usm-43420 |
| institution | Universiti Sains Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T17:53:07Z |
| publishDate | 2011 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | usm-434202019-04-12T05:26:26Z http://eprints.usm.my/43420/ P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor Mohamad, Muna Mastura QD1-999 Chemistry The objective of this study is to compare the performance of sequencing batch biofilm reactor (SBBR) and sequencing batch reactor (SBR) in treating p-chlorophenol (PCP) and nitrogen. The SBR and SBBR systems were operated in five sequential periods, namely FILL, REACT (aerobic and anoxic), SETTLE, DRAW and IDLE in the time ratio of 2:12:1:1:8 for a cycle time of 24 h. The SBR was used as the control reactor (RC) while the other two SBBRs, RB1 and RB2, were operated with 3 and 5% (v/v) of polyurethane foam cubes as the carrier materials, respectively. 2011-12 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/43420/1/MUNA%20MASTURA%20%20MOHAMAD.pdf Mohamad, Muna Mastura (2011) P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor. Masters thesis, Universiti Sains Malaysia. |
| spellingShingle | QD1-999 Chemistry Mohamad, Muna Mastura P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
| title | P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
| title_full | P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
| title_fullStr | P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
| title_full_unstemmed | P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
| title_short | P-Chlorophenol Removal In Sequencing Batch Biofilm Reactor |
| title_sort | p-chlorophenol removal in sequencing batch biofilm reactor |
| topic | QD1-999 Chemistry |
| url | http://eprints.usm.my/43420/ http://eprints.usm.my/43420/1/MUNA%20MASTURA%20%20MOHAMAD.pdf |