A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area

In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of st...

Full description

Bibliographic Details
Main Author: Ridha, Ahmed Dhya’a M.
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.usm.my/43217/
http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf
_version_ 1848879764112146432
author Ridha, Ahmed Dhya’a M.
author_facet Ridha, Ahmed Dhya’a M.
author_sort Ridha, Ahmed Dhya’a M.
building USM Institutional Repository
collection Online Access
description In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of study, situated at Kodiang, Kedah, as a part of the electrified double track project between Ipoh to Padang Besar, consisted of Zone 1 and Zone 2. The embankment over Zone 1 was 4 m thick, while that of Zone 2 was 2 m thick. The underlying soil material was marine clay of northern region of Peninsular Malaysia. The consolidation time allowed for embankments in the project was 45 days after achieving top surcharge levels. The rapid gain in bearing capacity of the treated soil and embankment stability achieved due to the improved soil were also assessed. Other behaviors noted were change in pore pressures and lateral displacements of soil under loads. Extensive soil investigation and instrumentation have been carried out in the study particularly to compare between actual and predicted behavior of the embankments. It was found that actual field settlements were generally lesser than predicted.
first_indexed 2025-11-15T17:52:25Z
format Thesis
id usm-43217
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T17:52:25Z
publishDate 2013
recordtype eprints
repository_type Digital Repository
spelling usm-432172019-04-12T05:26:18Z http://eprints.usm.my/43217/ A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area Ridha, Ahmed Dhya’a M. TA1-2040 Engineering (General). Civil engineering (General) In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of study, situated at Kodiang, Kedah, as a part of the electrified double track project between Ipoh to Padang Besar, consisted of Zone 1 and Zone 2. The embankment over Zone 1 was 4 m thick, while that of Zone 2 was 2 m thick. The underlying soil material was marine clay of northern region of Peninsular Malaysia. The consolidation time allowed for embankments in the project was 45 days after achieving top surcharge levels. The rapid gain in bearing capacity of the treated soil and embankment stability achieved due to the improved soil were also assessed. Other behaviors noted were change in pore pressures and lateral displacements of soil under loads. Extensive soil investigation and instrumentation have been carried out in the study particularly to compare between actual and predicted behavior of the embankments. It was found that actual field settlements were generally lesser than predicted. 2013-02 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf Ridha, Ahmed Dhya’a M. (2013) A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area. Masters thesis, Universiti Sains Malaysia.
spellingShingle TA1-2040 Engineering (General). Civil engineering (General)
Ridha, Ahmed Dhya’a M.
A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_full A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_fullStr A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_full_unstemmed A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_short A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_sort comparison between predicted and actual performances of an embankment built over a stone column area
topic TA1-2040 Engineering (General). Civil engineering (General)
url http://eprints.usm.my/43217/
http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf