Examining the Performance Level of Project Management Competencies of Architects in Ghana Using Gap Analysis Approach
Evaluation of the performance level of key project management (PM) competencies of the various project teams is perceived as a recourse necessary for identifying potentially crucial and practical training needs of project team participants in PM practice. However, notable studies in this domain h...
| Main Authors: | Kwofe, Titus Ebenezer, Botchway, Edward Ayebeng, Abanyie, Samuel Amos |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Sains Malaysia
2018
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/42657/ http://eprints.usm.my/42657/1/jcdc2018.23.1.8.pdf |
Similar Items
Evaluation of sound attenuation effect in recording studios:
case of angel FM station in Kumasi, Ghana
by: E.A. Botchway,, et al.
Published: (2014)
by: E.A. Botchway,, et al.
Published: (2014)
Modelling the Effect of Housing Design Unit Contract Packaging on
Mass Housing Project Team Communication Performance
by: Kwofie, Titus Ebenezer, et al.
Published: (2016)
by: Kwofie, Titus Ebenezer, et al.
Published: (2016)
Perceptions Of Threat Risk Frequency And Impact On Construction Projects In Ghana: Opinion Survey
Findings
by: Chileshe, Nicholas, et al.
Published: (2011)
by: Chileshe, Nicholas, et al.
Published: (2011)
The Case for a Construction Industry Council in Ghana
by: Kuragu, Joseph Kwame Ofori, et al.
Published: (2016)
by: Kuragu, Joseph Kwame Ofori, et al.
Published: (2016)
The Extent Of Architect's Integration Into The
Design & Build Construction Process
In Peninsular Malaysia.
by: Tan , Seong Yeow
Published: (2002)
by: Tan , Seong Yeow
Published: (2002)
What Competencies Do project Managers Need?
by: Mahmood, Assoc.Prof.Dr.Abdullah, et al.
Published: (2006)
by: Mahmood, Assoc.Prof.Dr.Abdullah, et al.
Published: (2006)
Integrated Delivery of Quality, Safety and Environment through
Road Sector Procurement: The Case of Public Sector Agencies in
Ghana
by: Mahamadu, Abdul Majeed, et al.
Published: (2015)
by: Mahamadu, Abdul Majeed, et al.
Published: (2015)
The Mediation Role Of Training On The Relationship Between The Competencies Of The Building Information Modelling Manager And The Project Performance
by: Ibrahim, Farah Salwati
Published: (2023)
by: Ibrahim, Farah Salwati
Published: (2023)
Examining the Satisfaction Level of Construction Workers Regarding
Safety Management in the Kingdom of Saudi Arabia
by: Suresh, Subashini, et al.
Published: (2017)
by: Suresh, Subashini, et al.
Published: (2017)
Gap Analysis Approach for Construction Safety Program Improvement
by: Aksorn , Thanet, et al.
Published: (2007)
by: Aksorn , Thanet, et al.
Published: (2007)
Gap analysis of future studies on wildlife tourism
in Lower Kinabatangan, Sabah
by: King , Natalie, et al.
Published: (2013)
by: King , Natalie, et al.
Published: (2013)
Investigating Knowledge Competence Of Civil Engineers In Malaysia
by: Ishak, Md Sayuti
Published: (2013)
by: Ishak, Md Sayuti
Published: (2013)
MATRA HELPS PRODUCE TALENTED, SKILLED AND
COMPETENT FUTURE ARCHITECTS
by: MPRC, Pusat Media & Perhubungan Awam
Published: (2016)
by: MPRC, Pusat Media & Perhubungan Awam
Published: (2016)
Competency Of Trade Specialist Subcontractors In South-Western Nigeria
by: Oluleye Akanni, Prince
Published: (2016)
by: Oluleye Akanni, Prince
Published: (2016)
The Architect
by: Smith, Dianne
Published: (2011)
by: Smith, Dianne
Published: (2011)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Project Communication And Project Performance: Case Of Software Development In Manufacturing Environment
by: Gan, Tan Chen Rong
Published: (2018)
by: Gan, Tan Chen Rong
Published: (2018)
Improving construction project performance through the project manager: an Indonesian experience
by: Yusof, Mohamad Nizam, et al.
Published: (2008)
by: Yusof, Mohamad Nizam, et al.
Published: (2008)
The Appointment Of Project Consultant In Green Construction Projects: A Proper Framework
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
The Influence Of Project Documents On The Outcome Of
Construction Projects Procured By Traditional Contracts In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Linking Personal Competencies With Transformational Leadership Style
Evidence From The Construction Industry In Thailand
by: Limsila, Kedsuda, et al.
Published: (2008)
by: Limsila, Kedsuda, et al.
Published: (2008)
Competence Anti Impact Of Critical Factors Of BPR : A Case Study Of The Libyan Sector
by: Mohamed Maki, Ahmed
Published: (2003)
by: Mohamed Maki, Ahmed
Published: (2003)
Analysis Of Project Failure Factors For Infrastructure Projects In Saudi
Arabia: A Multivariate Approach
by: Ikediashi, Dubem I., et al.
Published: (2014)
by: Ikediashi, Dubem I., et al.
Published: (2014)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Moderating Role Of Psychological Resilience On Project Manager Abusive Supervision In Construction Projects In Pakistan
by: Rafique, Muhammad
Published: (2023)
by: Rafique, Muhammad
Published: (2023)
Constructing timber architecture : merging the skills of architect, carpenter and masonry workers
by: Said, Ismail, et al.
Published: (2008)
by: Said, Ismail, et al.
Published: (2008)
Malaysian architects' experiences on performance-based identity and competence in BIM design management
by: Shahruddin, Syafizal
Published: (2022)
by: Shahruddin, Syafizal
Published: (2022)
Nature's architect
by: Bong, Joseph Choon Fah, et al.
Published: (2013)
by: Bong, Joseph Choon Fah, et al.
Published: (2013)
Examining Crisis Management In The Eastern Libyan Construction Industry (Abstract)
by: Ali Omar Ibrahim, Targ
Published: (2013)
by: Ali Omar Ibrahim, Targ
Published: (2013)
Bureaucratisation Of Codified
Project Management Practices And
Its Impact On Project Performance
Within Malaysian Construction And
Property Development Industries.
by: Ng, Sin Hong
Published: (2021)
by: Ng, Sin Hong
Published: (2021)
Bureaucratisation Of Codified Project Management Practices And Its Impact On Project Performance Within Malaysian Construction And Property Development Industries
by: Ng Sin, Hong
Published: (2021)
by: Ng Sin, Hong
Published: (2021)
Identification Of Factors Influencing Costs In Green Projects
by: Zainul Abidin, Nazirah, et al.
Published: (2016)
by: Zainul Abidin, Nazirah, et al.
Published: (2016)
Supply Chain Management in Flyover Projects in India
by: Yadav, Sudhir, et al.
Published: (2015)
by: Yadav, Sudhir, et al.
Published: (2015)
Quantitative method for optimizing decision in project selection
by: Utomo, Christiono, et al.
Published: (2008)
by: Utomo, Christiono, et al.
Published: (2008)
Financial and contractual problems of construction projects in Iran
by: Khoshgoftar, Mohammad, et al.
Published: (2008)
by: Khoshgoftar, Mohammad, et al.
Published: (2008)
Decision making tools for infrastructure project planning
by: Omar, Mohd. Faizal, et al.
Published: (2008)
by: Omar, Mohd. Faizal, et al.
Published: (2008)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Export Of Malaysia Business-To-Business Services:
An Examination Of Civil Engineering Consultancy
by: Law , Yuk Hui
Published: (2010)
by: Law , Yuk Hui
Published: (2010)
An Examination Of Residents’ Attitudes Toward Tourism Development:
The Case Of Aqaba In Jordan
by: Al-Badarneh, Mohammad Bader Helal
Published: (2014)
by: Al-Badarneh, Mohammad Bader Helal
Published: (2014)
RMT 554 - PROJECT MANAGEMENT III SEPT 1999
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1999)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1999)
Similar Items
-
Evaluation of sound attenuation effect in recording studios:
case of angel FM station in Kumasi, Ghana
by: E.A. Botchway,, et al.
Published: (2014) -
Modelling the Effect of Housing Design Unit Contract Packaging on
Mass Housing Project Team Communication Performance
by: Kwofie, Titus Ebenezer, et al.
Published: (2016) -
Perceptions Of Threat Risk Frequency And Impact On Construction Projects In Ghana: Opinion Survey
Findings
by: Chileshe, Nicholas, et al.
Published: (2011) -
The Case for a Construction Industry Council in Ghana
by: Kuragu, Joseph Kwame Ofori, et al.
Published: (2016) -
The Extent Of Architect's Integration Into The
Design & Build Construction Process
In Peninsular Malaysia.
by: Tan , Seong Yeow
Published: (2002)