Post-evaluation System In Construction Projects In Gaza Strip-palestine
A construction project can be described as successful when it is completed on time, within budget and according to specifications. Post-evaluation plays a major role in the construction industry when determining whether the project is a success or a failure. The objectives of this paper are as f...
| Main Authors: | Enshassi, Adnan Ali, Arain, Faisal, Rayyes, Yasmine El- |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Sains Malaysia
2014
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/41764/ http://eprints.usm.my/41764/1/JCDC_19%282%29_2014-Art._4_%2851-73%29.pdf |
Similar Items
Key Stressors Leading to Construction Professionals' Stress in the Gaza Strip, Palestine
by: Enshassi, Adnan, et al.
Published: (2015)
by: Enshassi, Adnan, et al.
Published: (2015)
The Effect Of Participation On Residents' Satisfaction In Multi Storey Housing Project in The Gaza Strip, Palestine (Abstract)
by: Ms Aljirrbi, Suheir
Published: (2013)
by: Ms Aljirrbi, Suheir
Published: (2013)
Factors Affecting The Accuracy Of Pre-tender Cost Estimates In The
Gaza Strip
by: Enshassi, Adnan, et al.
Published: (2013)
by: Enshassi, Adnan, et al.
Published: (2013)
Housing Attributes Affecting House Purchase Decisions Among University Employees In Gaza Strip, Palestine
by: M.E Sbakhi, Bissan
Published: (2016)
by: M.E Sbakhi, Bissan
Published: (2016)
Essential Skills And Training Provisions For Building Project Stakeholders In Palestine
by: Enshassi, Adnan, et al.
Published: (2009)
by: Enshassi, Adnan, et al.
Published: (2009)
Applying Theory Of Planned Behaviour In Predicting House Purchase Intention In Gaza Strip
by: Sbakhi, Bissan M. E.
Published: (2019)
by: Sbakhi, Bissan M. E.
Published: (2019)
Causes of Contractor's Business Failure in Developing Countries: The Case of Palestine
by: Enshassi, Adnan, et al.
Published: (2006)
by: Enshassi, Adnan, et al.
Published: (2006)
Leveraging On Information Technology To Teach Construction
Law To Built Environment Students: A Knowledge-based System (KBS) Approach
by: Arain, Faisal Manzoor
Published: (2009)
by: Arain, Faisal Manzoor
Published: (2009)
Safety Performance Of Subcontractors In The Palestinian Construction Industry
by: Enshassi, Adnan, et al.
Published: (2008)
by: Enshassi, Adnan, et al.
Published: (2008)
Training Assessment of Palestinian Contractors
by: Enshassi , Adnan, et al.
Published: (2007)
by: Enshassi , Adnan, et al.
Published: (2007)
Multi-Attribute Utility Theory for Selecting an Appropriate
Procurement Method in the Construction Projects
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
Framework for Managing the Traffic Impacts of Building
Construction Projects
by: Hyari, Khaled Hesham, et al.
Published: (2015)
by: Hyari, Khaled Hesham, et al.
Published: (2015)
Effect of micronutrient supplements on nutritional status of infants in Gaza Strip, Palestine
by: Albelbeisi, Ali H.A
Published: (2018)
by: Albelbeisi, Ali H.A
Published: (2018)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Improving construction project performance through the project manager: an Indonesian experience
by: Yusof, Mohamad Nizam, et al.
Published: (2008)
by: Yusof, Mohamad Nizam, et al.
Published: (2008)
The Appointment Of Project Consultant In Green Construction Projects: A Proper Framework
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
Factors Influencing Foreign Visitors Perceptions And Intention To Revisit Palestine: The Case Of Bethlehem And
Ramallah
by: Suleiman, Ja'far Subhi Hardan
Published: (2011)
by: Suleiman, Ja'far Subhi Hardan
Published: (2011)
The Influence Of Project Documents On The Outcome Of
Construction Projects Procured By Traditional Contracts In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Financial and contractual problems of construction projects in Iran
by: Khoshgoftar, Mohammad, et al.
Published: (2008)
by: Khoshgoftar, Mohammad, et al.
Published: (2008)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Moderating Role Of Psychological Resilience On Project Manager Abusive Supervision In Construction Projects In Pakistan
by: Rafique, Muhammad
Published: (2023)
by: Rafique, Muhammad
Published: (2023)
An Assessment Of Risk Identification In Large Construction Projects
In Iran
by: Tadayon, Mehdi, et al.
Published: (2012)
by: Tadayon, Mehdi, et al.
Published: (2012)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
Nigerian Construction Professional's Education And Deficiencies In The Area Of Project Management
by: Ameh , Oko John, et al.
Published: (2014)
by: Ameh , Oko John, et al.
Published: (2014)
Design Phase Constructability Improvement Strategies For Highway
Projects In Uganda
by: Alinaitwe, Henry, et al.
Published: (2014)
by: Alinaitwe, Henry, et al.
Published: (2014)
Factors Affecting Malaysia–China Construction Joint Venture Projects
by: Mo , Xuan
Published: (2012)
by: Mo , Xuan
Published: (2012)
Factors Affecting Contractors' Bidding Decisions for Construction
Projects in Nigeria
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
Post occupancy evaluation in Malaysia: The need for awareness and knowledge
by: Mohammad, Izran Sarrazin, et al.
Published: (2008)
by: Mohammad, Izran Sarrazin, et al.
Published: (2008)
Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective
by: Abdul Razak, Arman, et al.
Published: (2009)
by: Abdul Razak, Arman, et al.
Published: (2009)
The Impact Of Variation Order On Performance Of Construction Project In The Sultanate Of Oman (Abstract)
by: Al-Muqeemi, Hilal Muhammed Khalifa
Published: (2012)
by: Al-Muqeemi, Hilal Muhammed Khalifa
Published: (2012)
Management of Construction Waste in Nuclear and Thermal Power
Plant Projects in India
by: Seethapathy, Sathiyamurthy, et al.
Published: (2017)
by: Seethapathy, Sathiyamurthy, et al.
Published: (2017)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
by: Tufail, Muhammad Asim
Published: (2013)
by: Tufail, Muhammad Asim
Published: (2013)
Bureaucratisation Of Codified
Project Management Practices And
Its Impact On Project Performance
Within Malaysian Construction And
Property Development Industries.
by: Ng, Sin Hong
Published: (2021)
by: Ng, Sin Hong
Published: (2021)
Bureaucratisation Of Codified Project Management Practices And Its Impact On Project Performance Within Malaysian Construction And Property Development Industries
by: Ng Sin, Hong
Published: (2021)
by: Ng Sin, Hong
Published: (2021)
Procurement Selection Practices in Post Disaster Project Management - A Case Study in Banda Aceh, Indonesia
by: Bakar, Abu Hassan Abu, et al.
Published: (2009)
by: Bakar, Abu Hassan Abu, et al.
Published: (2009)
Knowledge management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies (Abstract)
by: Asim Tufail, Muhammad
Published: (2013)
by: Asim Tufail, Muhammad
Published: (2013)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan
by: Hadikusumo, Bonaventura H.W., et al.
Published: (2015)
by: Hadikusumo, Bonaventura H.W., et al.
Published: (2015)
Similar Items
-
Key Stressors Leading to Construction Professionals' Stress in the Gaza Strip, Palestine
by: Enshassi, Adnan, et al.
Published: (2015) -
The Effect Of Participation On Residents' Satisfaction In Multi Storey Housing Project in The Gaza Strip, Palestine (Abstract)
by: Ms Aljirrbi, Suheir
Published: (2013) -
Factors Affecting The Accuracy Of Pre-tender Cost Estimates In The
Gaza Strip
by: Enshassi, Adnan, et al.
Published: (2013) -
Housing Attributes Affecting House Purchase Decisions Among University Employees In Gaza Strip, Palestine
by: M.E Sbakhi, Bissan
Published: (2016) -
Essential Skills And Training Provisions For Building Project Stakeholders In Palestine
by: Enshassi, Adnan, et al.
Published: (2009)