Factors Influencing Construction Labour Productivity: An Indian Case Study

Construction productivity is of interest to researchers and practitioners because of its impact on the performance of construction projects. Despite various studies to identify factors influencing productivity in other countries, no study has addressed productivity issues in India. This paper rep...

Full description

Bibliographic Details
Main Authors: Thomas, Anu V., Sudhakumar , J.
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2014
Subjects:
Online Access:http://eprints.usm.my/41754/
http://eprints.usm.my/41754/1/JCDC_19%281%29_2014-Art._4_%2853-68%29.pdf
_version_ 1848879373727301632
author Thomas, Anu V.
Sudhakumar , J.
author_facet Thomas, Anu V.
Sudhakumar , J.
author_sort Thomas, Anu V.
building USM Institutional Repository
collection Online Access
description Construction productivity is of interest to researchers and practitioners because of its impact on the performance of construction projects. Despite various studies to identify factors influencing productivity in other countries, no study has addressed productivity issues in India. This paper reports the results of a questionnaire survey of project managers, site engineers, supervisors and craftsmen, in the state of Kerala in India, to identify the factors influencing construction labour productivity. The top five factors identified as having a significant impact on productivity: (1) timely availability of materials at the worksite, (2) delayed material delivery by the supplier, (3) strikes called by political parties or hartals, (4) frequent revisions of drawings/design, resulting in additional work/rework and (5) timely availability of drawings at the worksite. The findings provide a better understanding of the factors influencing productivity in the Indian context and will aid construction practitioners in making effective plans for productivity improvement.
first_indexed 2025-11-15T17:46:12Z
format Article
id usm-41754
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T17:46:12Z
publishDate 2014
publisher Penerbit Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-417542018-09-06T06:45:42Z http://eprints.usm.my/41754/ Factors Influencing Construction Labour Productivity: An Indian Case Study Thomas, Anu V. Sudhakumar , J. TH1-9745 Building construction Construction productivity is of interest to researchers and practitioners because of its impact on the performance of construction projects. Despite various studies to identify factors influencing productivity in other countries, no study has addressed productivity issues in India. This paper reports the results of a questionnaire survey of project managers, site engineers, supervisors and craftsmen, in the state of Kerala in India, to identify the factors influencing construction labour productivity. The top five factors identified as having a significant impact on productivity: (1) timely availability of materials at the worksite, (2) delayed material delivery by the supplier, (3) strikes called by political parties or hartals, (4) frequent revisions of drawings/design, resulting in additional work/rework and (5) timely availability of drawings at the worksite. The findings provide a better understanding of the factors influencing productivity in the Indian context and will aid construction practitioners in making effective plans for productivity improvement. Penerbit Universiti Sains Malaysia 2014 Article PeerReviewed application/pdf en http://eprints.usm.my/41754/1/JCDC_19%281%29_2014-Art._4_%2853-68%29.pdf Thomas, Anu V. and Sudhakumar , J. (2014) Factors Influencing Construction Labour Productivity: An Indian Case Study. Journal of Construction in Developing Countries , 19 (1). pp. 53-68. ISSN 1823-6499 http://web.usm.my/jcdc/vol19_1_2014/JCDC%2019(1)%202014-Art.%204%20(53-68).pdf
spellingShingle TH1-9745 Building construction
Thomas, Anu V.
Sudhakumar , J.
Factors Influencing Construction Labour Productivity: An Indian Case Study
title Factors Influencing Construction Labour Productivity: An Indian Case Study
title_full Factors Influencing Construction Labour Productivity: An Indian Case Study
title_fullStr Factors Influencing Construction Labour Productivity: An Indian Case Study
title_full_unstemmed Factors Influencing Construction Labour Productivity: An Indian Case Study
title_short Factors Influencing Construction Labour Productivity: An Indian Case Study
title_sort factors influencing construction labour productivity: an indian case study
topic TH1-9745 Building construction
url http://eprints.usm.my/41754/
http://eprints.usm.my/41754/
http://eprints.usm.my/41754/1/JCDC_19%281%29_2014-Art._4_%2853-68%29.pdf