Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan

Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical) to work together as a single unit. These projects require highly specialised...

Full description

Bibliographic Details
Main Authors: Hadikusumo, Bonaventura H.W., Tobgay, Sonam
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2015
Subjects:
Online Access:http://eprints.usm.my/41460/
http://eprints.usm.my/41460/1/JCDC_20%281%29_2015-Art._3_%2849-63%29.pdf
_version_ 1848879294840832000
author Hadikusumo, Bonaventura H.W.
Tobgay, Sonam
author_facet Hadikusumo, Bonaventura H.W.
Tobgay, Sonam
author_sort Hadikusumo, Bonaventura H.W.
building USM Institutional Repository
collection Online Access
description Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical) to work together as a single unit. These projects require highly specialised designs, detailed plans and specifications, high-risk construction methods, effective management, skilful supervision and close coordination. Thus, claims are common in such projects. These claims are undesirable because they require significant time and resources to resolve and cause adversarial relationships among the parties involved. Therefore, it is in the common interest of all involved parties to prevent, minimise, or resolve claims as amicably as possible. Identifying common claim types and their causes is essential in devising techniques to minimise and avoid them in future projects. This report details a case study performed on a large-scale hydropower project in Bhutan. The findings of this case study indicate that differing site conditions are the major contributor of impact and change claims and 95% of total claims can be settled by negotiation, whereas 5% of claims can be settled by arbitration.
first_indexed 2025-11-15T17:44:57Z
format Article
id usm-41460
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T17:44:57Z
publishDate 2015
publisher Penerbit Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-414602018-08-21T01:57:13Z http://eprints.usm.my/41460/ Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan Hadikusumo, Bonaventura H.W. Tobgay, Sonam TH1-9745 Building construction Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical) to work together as a single unit. These projects require highly specialised designs, detailed plans and specifications, high-risk construction methods, effective management, skilful supervision and close coordination. Thus, claims are common in such projects. These claims are undesirable because they require significant time and resources to resolve and cause adversarial relationships among the parties involved. Therefore, it is in the common interest of all involved parties to prevent, minimise, or resolve claims as amicably as possible. Identifying common claim types and their causes is essential in devising techniques to minimise and avoid them in future projects. This report details a case study performed on a large-scale hydropower project in Bhutan. The findings of this case study indicate that differing site conditions are the major contributor of impact and change claims and 95% of total claims can be settled by negotiation, whereas 5% of claims can be settled by arbitration. Penerbit Universiti Sains Malaysia 2015 Article PeerReviewed application/pdf en http://eprints.usm.my/41460/1/JCDC_20%281%29_2015-Art._3_%2849-63%29.pdf Hadikusumo, Bonaventura H.W. and Tobgay, Sonam (2015) Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan. Journal of Construction in Developing Countries , 20 (1). pp. 49-63. ISSN 1823-6499 http://web.usm.my/jcdc/vol20_1_2015/JCDC%2020(1)%202015-Art.%203%20(49-63).pdf
spellingShingle TH1-9745 Building construction
Hadikusumo, Bonaventura H.W.
Tobgay, Sonam
Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
title Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
title_full Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
title_fullStr Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
title_full_unstemmed Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
title_short Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
title_sort construction claim types and causes for a large-scale hydropower project in bhutan
topic TH1-9745 Building construction
url http://eprints.usm.my/41460/
http://eprints.usm.my/41460/
http://eprints.usm.my/41460/1/JCDC_20%281%29_2015-Art._3_%2849-63%29.pdf