Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical) to work together as a single unit. These projects require highly specialised...
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Sains Malaysia
2015
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/41460/ http://eprints.usm.my/41460/1/JCDC_20%281%29_2015-Art._3_%2849-63%29.pdf |
| _version_ | 1848879294840832000 |
|---|---|
| author | Hadikusumo, Bonaventura H.W. Tobgay, Sonam |
| author_facet | Hadikusumo, Bonaventura H.W. Tobgay, Sonam |
| author_sort | Hadikusumo, Bonaventura H.W. |
| building | USM Institutional Repository |
| collection | Online Access |
| description | Hydropower construction projects are complex and uncertain, have long
gestational periods and involve several parties. Furthermore, they require the integration of
different components (Civil, Mechanical and Electrical) to work together as a single unit.
These projects require highly specialised designs, detailed plans and specifications, high-risk
construction methods, effective management, skilful supervision and close coordination.
Thus, claims are common in such projects. These claims are undesirable because they
require significant time and resources to resolve and cause adversarial relationships among
the parties involved. Therefore, it is in the common interest of all involved parties to prevent,
minimise, or resolve claims as amicably as possible. Identifying common claim types and their
causes is essential in devising techniques to minimise and avoid them in future projects. This
report details a case study performed on a large-scale hydropower project in Bhutan. The
findings of this case study indicate that differing site conditions are the major contributor of
impact and change claims and 95% of total claims can be settled by negotiation, whereas
5% of claims can be settled by arbitration. |
| first_indexed | 2025-11-15T17:44:57Z |
| format | Article |
| id | usm-41460 |
| institution | Universiti Sains Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T17:44:57Z |
| publishDate | 2015 |
| publisher | Penerbit Universiti Sains Malaysia |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | usm-414602018-08-21T01:57:13Z http://eprints.usm.my/41460/ Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan Hadikusumo, Bonaventura H.W. Tobgay, Sonam TH1-9745 Building construction Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical) to work together as a single unit. These projects require highly specialised designs, detailed plans and specifications, high-risk construction methods, effective management, skilful supervision and close coordination. Thus, claims are common in such projects. These claims are undesirable because they require significant time and resources to resolve and cause adversarial relationships among the parties involved. Therefore, it is in the common interest of all involved parties to prevent, minimise, or resolve claims as amicably as possible. Identifying common claim types and their causes is essential in devising techniques to minimise and avoid them in future projects. This report details a case study performed on a large-scale hydropower project in Bhutan. The findings of this case study indicate that differing site conditions are the major contributor of impact and change claims and 95% of total claims can be settled by negotiation, whereas 5% of claims can be settled by arbitration. Penerbit Universiti Sains Malaysia 2015 Article PeerReviewed application/pdf en http://eprints.usm.my/41460/1/JCDC_20%281%29_2015-Art._3_%2849-63%29.pdf Hadikusumo, Bonaventura H.W. and Tobgay, Sonam (2015) Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan. Journal of Construction in Developing Countries , 20 (1). pp. 49-63. ISSN 1823-6499 http://web.usm.my/jcdc/vol20_1_2015/JCDC%2020(1)%202015-Art.%203%20(49-63).pdf |
| spellingShingle | TH1-9745 Building construction Hadikusumo, Bonaventura H.W. Tobgay, Sonam Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan |
| title | Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan |
| title_full | Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan |
| title_fullStr | Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan |
| title_full_unstemmed | Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan |
| title_short | Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan |
| title_sort | construction claim types and causes for a large-scale
hydropower project in bhutan |
| topic | TH1-9745 Building construction |
| url | http://eprints.usm.my/41460/ http://eprints.usm.my/41460/ http://eprints.usm.my/41460/1/JCDC_20%281%29_2015-Art._3_%2849-63%29.pdf |