Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
This paper aims at studying the factors that contribute to time delay and cost overrun of Road over Bridge (ROB) projects in India. Data for the research study were collected from 62 respondents, including owners, contractors, and consultants of ROB projects. The literature survey and the questio...
| Main Authors: | Venkateswaran, Chandrasekaran Balaji, Murugasan, Rajiah |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Sains Malaysia
2017
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/41426/ http://eprints.usm.my/41426/1/jcdc2017.22.s1.5.pdf |
Similar Items
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
Significant Factors Causing Cost Overruns In
Telecommunication Projects In Nigeria
by: Ameh, Oko John, et al.
Published: (2010)
by: Ameh, Oko John, et al.
Published: (2010)
Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
by: Love, Peter, et al.
Published: (2015)
by: Love, Peter, et al.
Published: (2015)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
A Critical Review of Factors Affecting Manpower and Equipment
Productivity in Tall Building Construction Projects
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
Predicament in construction – an overlook to delays, cost overruns and risks
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
An exploration of cost overrun in building construction projects
by: Tan, Chin Keng, et al.
Published: (2018)
by: Tan, Chin Keng, et al.
Published: (2018)
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019)
by: A. M., Faten Albtoush, et al.
Published: (2019)
Cost overrun of construction project in Pahang : causes and solution
by: Nurafiqah, Abu Hasan
Published: (2017)
by: Nurafiqah, Abu Hasan
Published: (2017)
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Determining the probability of project cost overruns
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014)
by: Ismail, Ismaaini
Published: (2014)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Mitigation measures for significant factors instigating cost overrun in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017)
by: Sohu, S, et al.
Published: (2017)
Overruns in Transportation Infrastructure Projects
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
Structural modelling of cost overrun factors in construction industry
by: Memon, Aftab Hameed
Published: (2013)
by: Memon, Aftab Hameed
Published: (2013)
Theoretical framework of the causes of construction time and cost overruns
by: Ullah, Kaleem, et al.
Published: (2017)
by: Ullah, Kaleem, et al.
Published: (2017)
Modeling the causes and mitigation measures for cost overruns in building construction : The case of higher education projects
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
A Dynamic Model Of Contractor-induced Delays In India
by: Das, Dillip Kumar, et al.
Published: (2017)
by: Das, Dillip Kumar, et al.
Published: (2017)
Probability distribution fitting of schedule overruns in construction projects
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
by: Faten, Ahmad Albtoush, et al.
Published: (2020)
by: Faten, Ahmad Albtoush, et al.
Published: (2020)
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
by: Lim, Cheong Seng
Published: (2001)
by: Lim, Cheong Seng
Published: (2001)
Spotlight on construction cost overrun research: Superficial, replicative and stagnated
by: Ahiaga-Dagbui, D., et al.
Published: (2015)
by: Ahiaga-Dagbui, D., et al.
Published: (2015)
Modeling the factors causing cost overrun in UAE construction industry
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022)
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022)
Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation
by: Love, Peter, et al.
Published: (2016)
by: Love, Peter, et al.
Published: (2016)
Probability Distribution Fitting of Cost Overrun Profiles
by: Love, Peter, et al.
Published: (2012)
by: Love, Peter, et al.
Published: (2012)
Effective strategies dealing with construction cost overruns: a study in Jordan
by: Faten, Ahmad Al-Btoush
Published: (2021)
by: Faten, Ahmad Al-Btoush
Published: (2021)
The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia
by: Harisaweni, Harisaweni
Published: (2007)
by: Harisaweni, Harisaweni
Published: (2007)
Similar Items
-
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016) -
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018) -
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019) -
Significant Factors Causing Cost Overruns In
Telecommunication Projects In Nigeria
by: Ameh, Oko John, et al.
Published: (2010)