A Dynamic Model Of Contractor-induced Delays In India

To understand delays in the Indian construction context, an exploratory survey was conducted as a precursor to the development of simulation models. System Dynamics (SD) was used to visualise the pivotal feedback relations that cause delays to evolve mechanisms that reduce it. A community develo...

Full description

Bibliographic Details
Main Authors: Das, Dillip Kumar, Emuze, Fidelis
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/41416/
http://eprints.usm.my/41416/1/jcdc2017.22.1.2.pdf
_version_ 1848879283895795712
author Das, Dillip Kumar
Emuze, Fidelis
author_facet Das, Dillip Kumar
Emuze, Fidelis
author_sort Das, Dillip Kumar
building USM Institutional Repository
collection Online Access
description To understand delays in the Indian construction context, an exploratory survey was conducted as a precursor to the development of simulation models. System Dynamics (SD) was used to visualise the pivotal feedback relations that cause delays to evolve mechanisms that reduce it. A community development construction project in India serves as the case for modelling. Findings of the study suggest that definite causal feedback relations exist among difficulties in financing the project, ineffective planning and scheduling, poor communication and coordination by the contractor, conflict between the contractor and other stakeholders and use of inappropriate construction methods and construction delays. However, the modelling efforts reveal that the use of these best practices can reduce delay significantly: provision of adequate project finances and cash flow, effective planning and scheduling, adoption of appropriate construction methods and contingencies for rework in the schedule.
first_indexed 2025-11-15T17:44:47Z
format Article
id usm-41416
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T17:44:47Z
publishDate 2017
publisher Penerbit Universiti Sains Malaysia
recordtype eprints
repository_type Digital Repository
spelling usm-414162018-08-20T02:53:26Z http://eprints.usm.my/41416/ A Dynamic Model Of Contractor-induced Delays In India Das, Dillip Kumar Emuze, Fidelis TH1-9745 Building construction To understand delays in the Indian construction context, an exploratory survey was conducted as a precursor to the development of simulation models. System Dynamics (SD) was used to visualise the pivotal feedback relations that cause delays to evolve mechanisms that reduce it. A community development construction project in India serves as the case for modelling. Findings of the study suggest that definite causal feedback relations exist among difficulties in financing the project, ineffective planning and scheduling, poor communication and coordination by the contractor, conflict between the contractor and other stakeholders and use of inappropriate construction methods and construction delays. However, the modelling efforts reveal that the use of these best practices can reduce delay significantly: provision of adequate project finances and cash flow, effective planning and scheduling, adoption of appropriate construction methods and contingencies for rework in the schedule. Penerbit Universiti Sains Malaysia 2017 Article PeerReviewed application/pdf en http://eprints.usm.my/41416/1/jcdc2017.22.1.2.pdf Das, Dillip Kumar and Emuze, Fidelis (2017) A Dynamic Model Of Contractor-induced Delays In India. Journal of Construction in Developing Countries , 22 (1). pp. 21-39. ISSN 1823-6499 http://web.usm.my/jcdc/vol22_1_2017/jcdc2017.22.1.2.pdf
spellingShingle TH1-9745 Building construction
Das, Dillip Kumar
Emuze, Fidelis
A Dynamic Model Of Contractor-induced Delays In India
title A Dynamic Model Of Contractor-induced Delays In India
title_full A Dynamic Model Of Contractor-induced Delays In India
title_fullStr A Dynamic Model Of Contractor-induced Delays In India
title_full_unstemmed A Dynamic Model Of Contractor-induced Delays In India
title_short A Dynamic Model Of Contractor-induced Delays In India
title_sort dynamic model of contractor-induced delays in india
topic TH1-9745 Building construction
url http://eprints.usm.my/41416/
http://eprints.usm.my/41416/
http://eprints.usm.my/41416/1/jcdc2017.22.1.2.pdf