Root Cause Analysis of Encumbrances Faced by Indigenous Building Contractors during Bidding in Nigeria
This paper intends to address one problem that is yet to be systematically examined. The focus is on the causal factors underlying the encumbrances faced by indigenous building contractors during bidding in Nigeria with a view to mitigating the hindrances and resultant effect of enhancing their busi...
| Main Authors: | Ebekoziena, Andrew, Chibuike Nwaole, Angeline Ngozika, Lawrence Ibeabuchi, Aginah |
|---|---|
| Other Authors: | A Kadir, Nadhrah |
| Format: | Book Section |
| Language: | English |
| Published: |
School of Social Sciences, USM
2017
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/40659/ http://eprints.usm.my/40659/1/ART_48.pdf |
Similar Items
Factors Influencing Success Rate of Contractors in Competitive
Bidding for Construction Works in South-East, Nigeria
by: Aje, Isaac Olaniyi, et al.
Published: (2016)
by: Aje, Isaac Olaniyi, et al.
Published: (2016)
Bid or no-bid decision factors of indigenous contractors in Nigeria
by: Olatunji, Oluwole, et al.
Published: (2017)
by: Olatunji, Oluwole, et al.
Published: (2017)
Factors Affecting Contractors' Bidding Decisions for Construction
Projects in Nigeria
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
Contractor tendering research: Going beyond bid/no-bid and markup models
by: Urquhart, Stephen, et al.
Published: (2018)
by: Urquhart, Stephen, et al.
Published: (2018)
Contractor business strategy decision in competitive bidding: case studies
by: Ngan , Kwong Yoong, et al.
Published: (2008)
by: Ngan , Kwong Yoong, et al.
Published: (2008)
The encumbrance of institutional investor and board of directors in reducing risk of default for conventional bonds and Sukuk in Malaysia
by: Noriza Mohd Saad,, et al.
Published: (2019)
by: Noriza Mohd Saad,, et al.
Published: (2019)
Impact of organisational culture on Malaysian international contractors’ bidding decisions / Low Wai Wah
by: Low, Wai Wah
Published: (2015)
by: Low, Wai Wah
Published: (2015)
Review on bid or no bid decision factors
by: Olatunji, Oluwole
Published: (2016)
by: Olatunji, Oluwole
Published: (2016)
Challenges face by Malaysian contractors in international ventures
by: Abu Bakar, Zaradiah
Published: (2008)
by: Abu Bakar, Zaradiah
Published: (2008)
597 bid cases in 3 months, diabetes and high blood pressure are the main causes
by: China Press
Published: (2022)
by: China Press
Published: (2022)
Bureaucracy: Major Barrier for Payment to Contractors in Nigeria
by: Umar, Garba Maiunguwa
Published: (2015)
by: Umar, Garba Maiunguwa
Published: (2015)
Bidding in Construction Projects
by: Ayrancioglu, Oguz
Published: (2012)
by: Ayrancioglu, Oguz
Published: (2012)
Bidding in Construction Projects
by: Ayrancioglu, Oguz
Published: (2012)
by: Ayrancioglu, Oguz
Published: (2012)
The problem with root cause analysis
by: Peerally, Mohammas Farhad, et al.
Published: (2016)
by: Peerally, Mohammas Farhad, et al.
Published: (2016)
Evaluating the Levels of Performance of the Small Scale Contractors in Nigeria
by: Gambo, Nuru, et al.
Published: (2015)
by: Gambo, Nuru, et al.
Published: (2015)
Causes of Contractor's Business Failure in Developing Countries: The Case of Palestine
by: Enshassi, Adnan, et al.
Published: (2006)
by: Enshassi, Adnan, et al.
Published: (2006)
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
by: Ammar, Ahmed Abbasi
Published: (2018)
by: Ammar, Ahmed Abbasi
Published: (2018)
Bid to stem the brain drain
Published: (2008)
Published: (2008)
Watches bidding system application
by: Ng, Wei Bin
Published: (2022)
by: Ng, Wei Bin
Published: (2022)
Identification of common problems faced by the Bumiputera contractors / Ad. Johan Abdullah
by: Abdullah, Ad.Johan
Published: (2006)
by: Abdullah, Ad.Johan
Published: (2006)
A survey on problem faced by contractors using design and build contract
by: Nurhajar, Abd Rahman
Published: (2009)
by: Nurhajar, Abd Rahman
Published: (2009)
Problem and dilemma faced by Malaysia contractor when handling international project
by: Marhazlin, Mohamad
Published: (2017)
by: Marhazlin, Mohamad
Published: (2017)
Research on the Root Cause of Cross-Listing
by: Fan, Yun-Xin
Published: (2020)
by: Fan, Yun-Xin
Published: (2020)
Influence Of The Monitoring And Control Strategies Of Indigenous
And Expatriate Nigerian Contractors On Project Outcome
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
The Determinants of the Bid-Ask Spread Components
by: Liang, Xiuying
Published: (2006)
by: Liang, Xiuying
Published: (2006)
Collusive Bidding in Brazilian Infrastructure Projects
by: Signor, R., et al.
Published: (2017)
by: Signor, R., et al.
Published: (2017)
Bid to bring Borneo's informaton to the world
by: The Borneo Post
Published: (2002)
by: The Borneo Post
Published: (2002)
BID: BioWorld Interactive Dictionary
by: Okpoluaefe Godspower Udezi, Suruthimitra Okpoluaefe, et al.
Published: (2017)
by: Okpoluaefe Godspower Udezi, Suruthimitra Okpoluaefe, et al.
Published: (2017)
Analysis on the problems faced by contractors implementing traditional and design & build contract in Malaysia
by: Norziatul Husna, Mohd Ridzuan
Published: (2012)
by: Norziatul Husna, Mohd Ridzuan
Published: (2012)
A study on the problems facing by G1 and G2 contractors in Malaysia
by: Afiqah Farhana, Zamani
Published: (2017)
by: Afiqah Farhana, Zamani
Published: (2017)
Evaluation of the financial performance of American bidding companies!
by: Rebecca, Korang
Published: (2012)
by: Rebecca, Korang
Published: (2012)
Evaluation of the financial performance of American bidding companies
by: Korang, Rebecca
Published: (2012)
by: Korang, Rebecca
Published: (2012)
Takeover bids - should the board or shareholders decide?
by: Ambaras Khan, Mushera Bibi
Published: (2010)
by: Ambaras Khan, Mushera Bibi
Published: (2010)
Takeover bids - should the board or shareholders decide?
by: Ambaras Khan, Mushera Bibi
Published: (2010)
by: Ambaras Khan, Mushera Bibi
Published: (2010)
Takeover bids - Should the board or shareholders decide?
by: Ambaras Khan, Mushera Bibi
Published: (2010)
by: Ambaras Khan, Mushera Bibi
Published: (2010)
Smart bidding modern antique eShop
by: Soon, Yu Siang
Published: (2023)
by: Soon, Yu Siang
Published: (2023)
Adventitious rooting in microcuttings of selected indigenous landscape trees of Malaysia
by: Awang, Yahya, et al.
Published: (2009)
by: Awang, Yahya, et al.
Published: (2009)
Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
Relationship Between Cost Factors And Performance Of Small Scale Local Government Contractors In Nigeria
by: Gambo, Nuru
Published: (2016)
by: Gambo, Nuru
Published: (2016)
Analysis Of Non-excusable Delay Factors Influencing Contractors'
Performance In Lagos State, Nigeria
by: Ibironke, Olajide Timothy, et al.
Published: (2013)
by: Ibironke, Olajide Timothy, et al.
Published: (2013)
Similar Items
-
Factors Influencing Success Rate of Contractors in Competitive
Bidding for Construction Works in South-East, Nigeria
by: Aje, Isaac Olaniyi, et al.
Published: (2016) -
Bid or no-bid decision factors of indigenous contractors in Nigeria
by: Olatunji, Oluwole, et al.
Published: (2017) -
Factors Affecting Contractors' Bidding Decisions for Construction
Projects in Nigeria
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016) -
Contractor tendering research: Going beyond bid/no-bid and markup models
by: Urquhart, Stephen, et al.
Published: (2018) -
Contractor business strategy decision in competitive bidding: case studies
by: Ngan , Kwong Yoong, et al.
Published: (2008)