Determinants of procurement strategy for construction works: quantity surveyors’ perspectives
The selection of the ‘appropriate’ procurement strategy is a prerequisite to the success or failure of a construction project. This paper investigates the factors determining the selection of appropriate procurement strategy for construction works in Nigeria. Data for the study was collected throu...
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
EDP Sciences
2016
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/38641/ http://eprints.usm.my/38641/1/Determinants_of_procurement_strategy_for_construction_works_quantity_surveyors%E2%80%99_perspectives.pdf |
| _version_ | 1848878526117183488 |
|---|---|
| author | Olanrewaju, AbdulLateef Anavhe, Paul Junior Abdul Aziz, Abdul Rashid Chu, Hui Chen Wai, Soon Han |
| author_facet | Olanrewaju, AbdulLateef Anavhe, Paul Junior Abdul Aziz, Abdul Rashid Chu, Hui Chen Wai, Soon Han |
| author_sort | Olanrewaju, AbdulLateef |
| building | USM Institutional Repository |
| collection | Online Access |
| description | The selection of the ‘appropriate’ procurement strategy is a prerequisite to the success or failure of a
construction project. This paper investigates the factors determining the selection of appropriate procurement strategy
for construction works in Nigeria. Data for the study was collected through an online survey questionnaire. The
survey administration involves only quantity surveyors. Quantity surveyors were targeted because they advise clients
and other stakeholders on procurement and contractual issues on construction works. A total of 33 usable responses
were received and analysed for this study. On the basis of the results, it is concluded that the selection of procurement
strategies for construction depend on complex interrelated factors. The study could not detect a particular factor or
few factors responsible for a procurement strategy selection. The findings of this study is useful because it argues that
the construction sector needs to broaden its considerations on the procurement strategy’s determinants rather than
focusing solely on the client’s type and nature of projects as is often cited. Future research could segment these
factors in terms of class of construction works or increase the sample size, which might lead to different findings. |
| first_indexed | 2025-11-15T17:32:44Z |
| format | Article |
| id | usm-38641 |
| institution | Universiti Sains Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T17:32:44Z |
| publishDate | 2016 |
| publisher | EDP Sciences |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | usm-386412018-02-01T07:51:51Z http://eprints.usm.my/38641/ Determinants of procurement strategy for construction works: quantity surveyors’ perspectives Olanrewaju, AbdulLateef Anavhe, Paul Junior Abdul Aziz, Abdul Rashid Chu, Hui Chen Wai, Soon Han TH1-9745 Building construction The selection of the ‘appropriate’ procurement strategy is a prerequisite to the success or failure of a construction project. This paper investigates the factors determining the selection of appropriate procurement strategy for construction works in Nigeria. Data for the study was collected through an online survey questionnaire. The survey administration involves only quantity surveyors. Quantity surveyors were targeted because they advise clients and other stakeholders on procurement and contractual issues on construction works. A total of 33 usable responses were received and analysed for this study. On the basis of the results, it is concluded that the selection of procurement strategies for construction depend on complex interrelated factors. The study could not detect a particular factor or few factors responsible for a procurement strategy selection. The findings of this study is useful because it argues that the construction sector needs to broaden its considerations on the procurement strategy’s determinants rather than focusing solely on the client’s type and nature of projects as is often cited. Future research could segment these factors in terms of class of construction works or increase the sample size, which might lead to different findings. EDP Sciences 2016 Article PeerReviewed application/pdf en http://eprints.usm.my/38641/1/Determinants_of_procurement_strategy_for_construction_works_quantity_surveyors%E2%80%99_perspectives.pdf Olanrewaju, AbdulLateef and Anavhe, Paul Junior and Abdul Aziz, Abdul Rashid and Chu, Hui Chen and Wai, Soon Han (2016) Determinants of procurement strategy for construction works: quantity surveyors’ perspectives. MATEC Web of Conferences, 66 (00093). pp. 1-9. ISSN 2261-236X https://doi.org/10.1051/matecconf/20166600093 |
| spellingShingle | TH1-9745 Building construction Olanrewaju, AbdulLateef Anavhe, Paul Junior Abdul Aziz, Abdul Rashid Chu, Hui Chen Wai, Soon Han Determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| title | Determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| title_full | Determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| title_fullStr | Determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| title_full_unstemmed | Determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| title_short | Determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| title_sort | determinants of procurement strategy for construction works: quantity surveyors’ perspectives |
| topic | TH1-9745 Building construction |
| url | http://eprints.usm.my/38641/ http://eprints.usm.my/38641/ http://eprints.usm.my/38641/1/Determinants_of_procurement_strategy_for_construction_works_quantity_surveyors%E2%80%99_perspectives.pdf |