Assessment of Influential Causes of Construction Project Delay in Malaysian Private Housing from Developer’s Viewpoint
Project delay in the construction industry is a universal or large-scale observable fact affecting not only the construction industry but the overall economy of countries too. The objective of this study is to evaluate and identify the causes and consequences of project delays in the private hous...
| Main Authors: | Othuman Mydin, M.A., Md Sani, N., Agus Salim, N.A, Mohamed Alias, N. |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
EDP Sciences
2014
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/38367/ http://eprints.usm.my/38367/1/Assessment_of_Influential_Causes_of_Construction_Project_Delay_in_Malaysian_Private_Housing_from_Developer%E2%80%99s_Viewpoint.pdf |
Similar Items
Assessment of Significant Causes to School Building Defects
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
A Prospective Study on Building Quality: Relationship
between Workmanship Quality and Common Building
Defects of Low-cost Construction Projects
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Assessment of Adaptive Reuse of Heritage Shop Houses for
Sleep Lodging in Malaysia: Fulfilment of Conservation
Guidelines
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Evaluation of Imminent Fire Hazards of Inheritance Ancestral
Temple and Mansion in Georgetown, Penang
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
Analysis of Micro-Morphology, Thermal Conductivity, Thermal Diffusivity and Specific Heat Capacity of Coconut Fibre Reinforced Foamed Concrete
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Criteria for Affordable Housing Performance Measurement: A
Review
by: Esruq Labin, A.M.J., et al.
Published: (2014)
by: Esruq Labin, A.M.J., et al.
Published: (2014)
Axial Compressive Strength of Foamcrete with Different
Profiles and Dimensions
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Approaches to Construction Waste Management in Malaysia
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Biomimetic Architecture in Building Envelope Maintenance
(A Literature)
by: Agus Salim, N.A., et al.
Published: (2014)
by: Agus Salim, N.A., et al.
Published: (2014)
Biomimicry of Palm Tree Leaves Form and Pattern on Building Form
by: Agus Salim, N.A., et al.
Published: (2014)
by: Agus Salim, N.A., et al.
Published: (2014)
Causes of delay in Malaysian IT projects
by: Fanurul Kemp, Abd Hakim
Published: (2013)
by: Fanurul Kemp, Abd Hakim
Published: (2013)
Connection in Joints for Thin-Walled Steel Sections and Sheeting
by: Othuman Mydin, M.A.
Published: (2014)
by: Othuman Mydin, M.A.
Published: (2014)
Evaluation of Active Cooling Systems for Non-Residential Buildings
by: Mydin, M.A. Othuman
Published: (2014)
by: Mydin, M.A. Othuman
Published: (2014)
Causes of construction delay: a case study in Libya
by: Fackroon, Ellafi H., et al.
Published: (2008)
by: Fackroon, Ellafi H., et al.
Published: (2008)
Experimental Investigation into Pull-Out Strength of Foamed
Concrete Using Different Types of Screw
by: Mydin, M.A. Othuman, et al.
Published: (2014)
by: Mydin, M.A. Othuman, et al.
Published: (2014)
Evaluation of Fire Hazard and Safety Management of Heritage
Buildings in Georgetown, Penang
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Fire Risk Assessment of Adaptive Re-Use of Historic Shop
Houses for Sleeping Accommodations in Malaysia
by: Mydin, M.A.O., et al.
Published: (2014)
by: Mydin, M.A.O., et al.
Published: (2014)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
The significant factors causing delay of building construction projects in Malaysia.
by: Alaghbari, Wa'el, et al.
Published: (2007)
by: Alaghbari, Wa'el, et al.
Published: (2007)
Concrete Waste as a Cement Replacement Material in
Concrete Blocks for Optimization of Thermal and Mechanical
Properties
by: Rosman, M.S., et al.
Published: (2014)
by: Rosman, M.S., et al.
Published: (2014)
Construction Site Workers’ Awareness on Using Safety
Equipment : Case Study
by: Md Ulang, N., et al.
Published: (2014)
by: Md Ulang, N., et al.
Published: (2014)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Classification of Inheritance Shop Houses in George
Town, Penang - UNESCO World Heritage Site
by: Mansor, Rozliani, et al.
Published: (2012)
by: Mansor, Rozliani, et al.
Published: (2012)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
Causes of delays in the construction phase of Chinese building projects
by: Wang, T., et al.
Published: (2018)
by: Wang, T., et al.
Published: (2018)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
Contractors’ Attitude towards Enhancing Safety Performance:
Case Study on Construction Firms in Penang
by: Md Ulang, N., et al.
Published: (2014)
by: Md Ulang, N., et al.
Published: (2014)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019)
by: AL-Fadhali, Najib, et al.
Published: (2019)
Delay Mitigation in the Malaysian Housing Industry: A Structural
Equation Modelling Approach
by: Chang , Saar Chai, et al.
Published: (2015)
by: Chang , Saar Chai, et al.
Published: (2015)
The study on cause and effect of abandoned housing project in selangor
by: Nur Farhayu, Ariffin, et al.
Published: (2018)
by: Nur Farhayu, Ariffin, et al.
Published: (2018)
Appraisal of Passive and Active Fire Protection Systems in
Student’s Accommodation
by: Ismail, I., et al.
Published: (2014)
by: Ismail, I., et al.
Published: (2014)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
Similar Items
-
Assessment of Significant Causes to School Building Defects
by: Othuman Mydin, M.A., et al.
Published: (2014) -
A Prospective Study on Building Quality: Relationship
between Workmanship Quality and Common Building
Defects of Low-cost Construction Projects
by: Othuman Mydin, M.A., et al.
Published: (2014) -
Assessment of Adaptive Reuse of Heritage Shop Houses for
Sleep Lodging in Malaysia: Fulfilment of Conservation
Guidelines
by: Othuman Mydin, M.A., et al.
Published: (2014) -
Evaluation of Imminent Fire Hazards of Inheritance Ancestral
Temple and Mansion in Georgetown, Penang
by: Othuman Mydin, M.A., et al.
Published: (2014) -
Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)