Causes of construction delay: a case study in Libya

Delays on construction projects are a universal phenomenon. And it is probable that most construction projects will incur some sort of a delay before they are completed. Even though various studies have been considered into the causes affecting delays, these studies seldom discuss common and gene...

Full description

Bibliographic Details
Main Authors: Fackroon, Ellafi H., Kadir Pakir, Abdul Hamid, Omran, Abdelnaser
Format: Conference or Workshop Item
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.usm.my/34633/
http://eprints.usm.my/34633/1/HBP15.pdf
_version_ 1848877396195803136
author Fackroon, Ellafi H.
Kadir Pakir, Abdul Hamid
Omran, Abdelnaser
author_facet Fackroon, Ellafi H.
Kadir Pakir, Abdul Hamid
Omran, Abdelnaser
author_sort Fackroon, Ellafi H.
building USM Institutional Repository
collection Online Access
description Delays on construction projects are a universal phenomenon. And it is probable that most construction projects will incur some sort of a delay before they are completed. Even though various studies have been considered into the causes affecting delays, these studies seldom discuss common and general causes of delays in construction projects. Thus, comprehensive study on these delays is essential. Since the problems are rather contextual, the study needs to focus on specific causes of delaying like insufficient coordination and ineffective communication between involved parties in construction projects located at Benghazi City in Libya. Literature review and a questionnaire survey targeted at construction projects in the Libya’s country and have been used as the tools to carry out this study. This paper presents the findings of a survey aimed for identifying some of the most important causes of delays in construction projects in the above mentioned city. It is hoped that these findings will guide efforts to enhance the performance of the construction Industry. This paper also explores and provides some guidelines and actionable information which can be led to enhance the construction process.
first_indexed 2025-11-15T17:14:46Z
format Conference or Workshop Item
id usm-34633
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T17:14:46Z
publishDate 2008
recordtype eprints
repository_type Digital Repository
spelling usm-346332017-05-26T07:04:47Z http://eprints.usm.my/34633/ Causes of construction delay: a case study in Libya Fackroon, Ellafi H. Kadir Pakir, Abdul Hamid Omran, Abdelnaser TH1-9745 Building construction Delays on construction projects are a universal phenomenon. And it is probable that most construction projects will incur some sort of a delay before they are completed. Even though various studies have been considered into the causes affecting delays, these studies seldom discuss common and general causes of delays in construction projects. Thus, comprehensive study on these delays is essential. Since the problems are rather contextual, the study needs to focus on specific causes of delaying like insufficient coordination and ineffective communication between involved parties in construction projects located at Benghazi City in Libya. Literature review and a questionnaire survey targeted at construction projects in the Libya’s country and have been used as the tools to carry out this study. This paper presents the findings of a survey aimed for identifying some of the most important causes of delays in construction projects in the above mentioned city. It is hoped that these findings will guide efforts to enhance the performance of the construction Industry. This paper also explores and provides some guidelines and actionable information which can be led to enhance the construction process. 2008-12 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.usm.my/34633/1/HBP15.pdf Fackroon, Ellafi H. and Kadir Pakir, Abdul Hamid and Omran, Abdelnaser (2008) Causes of construction delay: a case study in Libya. In: 2nd International Conference on Built Environment in Developing Countries., 3rd- 4th December 2008, Universiti Sains Malaysia, Pulau Pinang.
spellingShingle TH1-9745 Building construction
Fackroon, Ellafi H.
Kadir Pakir, Abdul Hamid
Omran, Abdelnaser
Causes of construction delay: a case study in Libya
title Causes of construction delay: a case study in Libya
title_full Causes of construction delay: a case study in Libya
title_fullStr Causes of construction delay: a case study in Libya
title_full_unstemmed Causes of construction delay: a case study in Libya
title_short Causes of construction delay: a case study in Libya
title_sort causes of construction delay: a case study in libya
topic TH1-9745 Building construction
url http://eprints.usm.my/34633/
http://eprints.usm.my/34633/1/HBP15.pdf