Factors affecting speed of industrialized building system (IBS) projects in Malaysia
This study attempts to identify the factors affect the speed of IBS and the probability level to select either IBS or conventional method. A questionnaire was distributed in order to collect the data. It consists of 6 main factors namely: high productivity of structural elements, using of moulds,...
| Main Authors: | Alaghbari, Wa’el, A. , Salim, M. R. , Abdul Kadir, A. , Asonway |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2008
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/34425/ http://eprints.usm.my/34425/1/HBP4.pdf |
Similar Items
Factors influencing low cost housing in Sana’a – Yemen
by: Wa’el , Alaghbari, et al.
Published: (2008)
by: Wa’el , Alaghbari, et al.
Published: (2008)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Factors Affecting Construction Speed of Industrialized Building System in Malaysia
by: Mohammed Al-Aghbari, Wa'el Abdulmoghni
Published: (2005)
by: Mohammed Al-Aghbari, Wa'el Abdulmoghni
Published: (2005)
Industrialised Building System (Ibs)
Scoring System - Case Study
by: Ibrahim, Siti Rus‘Adneen
Published: (2006)
by: Ibrahim, Siti Rus‘Adneen
Published: (2006)
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)
by: Norsyazwani, Masri
Published: (2019)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Safety aspect in installation industrialized building system (IBS) component
by: Noor Yuhana, Maamor
Published: (2009)
by: Noor Yuhana, Maamor
Published: (2009)
A Critical Review of Factors Affecting Manpower and Equipment
Productivity in Tall Building Construction Projects
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Innovation Barriers and Enablers that Affect Productivity
in Uganda Building Industry
by: Alinaitwe, Henry Mwanaki, et al.
Published: (2007)
by: Alinaitwe, Henry Mwanaki, et al.
Published: (2007)
Factors influencing Industrialized Building System (IBS) project performance: a systematic review
by: Yusmin, Jaafar, et al.
Published: (2020)
by: Yusmin, Jaafar, et al.
Published: (2020)
An assessment applicability of risk management in design and
build projects in Malaysia
by: Adnan, Hamimah, et al.
Published: (2008)
by: Adnan, Hamimah, et al.
Published: (2008)
Framework for Managing the Traffic Impacts of Building
Construction Projects
by: Hyari, Khaled Hesham, et al.
Published: (2015)
by: Hyari, Khaled Hesham, et al.
Published: (2015)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Factors Affecting Malaysia–China Construction Joint Venture Projects
by: Mo , Xuan
Published: (2012)
by: Mo , Xuan
Published: (2012)
Factors Affecting Contractors' Bidding Decisions for Construction
Projects in Nigeria
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
Factors Affecting Building Security Cost In Nigerian Urban Environment
by: Anifowose , Opeyemi Maroof
Published: (2016)
by: Anifowose , Opeyemi Maroof
Published: (2016)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam
Industri Binaan Serta Impak Terhadap Kos
by: Nordin, Mohd Taufik
Published: (2007)
by: Nordin, Mohd Taufik
Published: (2007)
Cost issue: Key limiting factor that affects IBS application in Malaysian construction industry
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
A Prospective Study on Building Quality: Relationship
between Workmanship Quality and Common Building
Defects of Low-cost Construction Projects
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Factors affecting construction costs in affordable housing for low-income group in Sana'a, Yemen
by: Mohammed Alaghbari, Wa'el Abdulmoghni
Published: (2010)
by: Mohammed Alaghbari, Wa'el Abdulmoghni
Published: (2010)
Essential Skills And Training Provisions For Building Project Stakeholders In Palestine
by: Enshassi, Adnan, et al.
Published: (2009)
by: Enshassi, Adnan, et al.
Published: (2009)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
Factors Affecting Construction Organization Quality Management System In The Malaysian Construction Industry
by: Said, Ilias, et al.
Published: (2009)
by: Said, Ilias, et al.
Published: (2009)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018)
by: Lim, Chun Fee, et al.
Published: (2018)
Biomimetic Architecture in Building Envelope Maintenance
(A Literature)
by: Agus Salim, N.A., et al.
Published: (2014)
by: Agus Salim, N.A., et al.
Published: (2014)
The Mediation Role Of Training On The Relationship Between The Competencies Of The Building Information Modelling Manager And The Project Performance
by: Ibrahim, Farah Salwati
Published: (2023)
by: Ibrahim, Farah Salwati
Published: (2023)
Industrialised Building Systems (IBS) in Malaysian construction industry / Dr Hjh Hamimah Adnan and Nor Azmi Ahmad Bari
by: Adnan, Hamimah, et al.
Published: (2007)
by: Adnan, Hamimah, et al.
Published: (2007)
Biomimicry of Palm Tree Leaves Form and Pattern on Building Form
by: Agus Salim, N.A., et al.
Published: (2014)
by: Agus Salim, N.A., et al.
Published: (2014)
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)
by: Md. Ali, Massofia, et al.
Published: (2018)
Assessment of Significant Causes to School Building Defects
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
The significant factors causing delay of building construction projects in Malaysia.
by: Alaghbari, Wa'el, et al.
Published: (2007)
by: Alaghbari, Wa'el, et al.
Published: (2007)
Compatibility issues of Industrialized Building System (IBS) in interior construction: a case study in Kuala Lumpur
by: Yaman, Rostam, et al.
Published: (2019)
by: Yaman, Rostam, et al.
Published: (2019)
Multi-Attribute Utility Theory for Selecting an Appropriate
Procurement Method in the Construction Projects
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
Similar Items
-
Factors influencing low cost housing in Sana’a – Yemen
by: Wa’el , Alaghbari, et al.
Published: (2008) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Factors Affecting Construction Speed of Industrialized Building System in Malaysia
by: Mohammed Al-Aghbari, Wa'el Abdulmoghni
Published: (2005) -
Industrialised Building System (Ibs)
Scoring System - Case Study
by: Ibrahim, Siti Rus‘Adneen
Published: (2006) -
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)