Challenges for Developers Implementing IBS in Malaysian Housing Projects
Housing projects has become one of the contributors to Malaysian construction industry and there is always significant demand for housing as Malaysian economic has spurs positively. However, reports from National Housing Policy (2012) has revealed that current housing projects must transform from is...
| Main Authors: | Abd Jalil, Ahmad, Nuruddin, Azlan Raofuddin, Jaafar, Mastura, Othuman Mydin, Md Azree |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/30177/ http://eprints.usm.my/30177/1/CHALLENGES_FOR_DEVELOPERS_IMPLEMENTING_IBS_IN_MALAYSIAN_HOUSING_PROJECTS.pdf |
Similar Items
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020)
by: Abas, Nor Haslinda, et al.
Published: (2020)
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015)
by: Gambo, M.M., et al.
Published: (2015)
Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate
by: Alnadish, Adham, et al.
Published: (2018)
by: Alnadish, Adham, et al.
Published: (2018)
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021)
by: Chin Foo, Lee
Published: (2021)
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)
by: Ang, P S E, et al.
Published: (2020)
Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
by: Shaikh, Haseeb Halim
Published: (2021)
by: Shaikh, Haseeb Halim
Published: (2021)
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
by: Abd. Rahman, Norashidah
Published: (2005)
The challenges Of quantity surveying practice in
sustainable construction project
by: Che Haron, Roziha, et al.
Published: (2017)
by: Che Haron, Roziha, et al.
Published: (2017)
Significant factors of construction delays among contractors in Klang Valley and its mitigation
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
Malaysian Housing Developers: An Analysis Of The Factors Behind Corporate Successes
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
Unveiling the Challenges Faced By Malaysian Housing Developers
through Government Policy Changes
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
Pembangunan model sistem sanitasi, perparitan dan pembentungan sebagai alat bahan bantu dalam subjek sistem sanitasi, perparitan dan pembentungan
by: Kong, H. P., et al.
Published: (2018)
by: Kong, H. P., et al.
Published: (2018)
Business Success and Psychological Traits of Housing Developers
by: Jaafar, Mastura, et al.
Published: (2014)
by: Jaafar, Mastura, et al.
Published: (2014)
Managerial capabilities of housing developers:
building the competitive advantage of a firm
by: Jaafar, Mastura, et al.
Published: (2016)
by: Jaafar, Mastura, et al.
Published: (2016)
Contributing cost variation factors in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Unleashing the Competitive Advantage of Malaysian Private Housing Developers
through Product Analysis
by: Jaafar, Mastura, et al.
Published: (2015)
by: Jaafar, Mastura, et al.
Published: (2015)
Women’s Consultant Participation In The Malaysian Construction Industry
by: Jaafar, Mastura, et al.
Published: (2015)
by: Jaafar, Mastura, et al.
Published: (2015)
Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
Elastic Modulus of Foamcrete in Compression and Bending at Elevated Temperatures
by: Othuman Mydin, Md Azree
Published: (2012)
by: Othuman Mydin, Md Azree
Published: (2012)
Engineering Performance Of High Strength Concrete
Containing Steel Fibre Reinforcement
by: Othuman Mydin, Md Azree
Published: (2013)
by: Othuman Mydin, Md Azree
Published: (2013)
Assessment of Influential Causes of Construction Project
Delay in Malaysian Private Housing from Developer’s
Viewpoint
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008)
by: Alaghbari, Wa’el, et al.
Published: (2008)
Classification of Inheritance Shop Houses in George
Town, Penang - UNESCO World Heritage Site
by: Mansor, Rozliani, et al.
Published: (2012)
by: Mansor, Rozliani, et al.
Published: (2012)
Distinctive Structural and Non-Structural Building Defects and Failures in Educational Buildings
by: Tan, Sin Wen, et al.
Published: (2013)
by: Tan, Sin Wen, et al.
Published: (2013)
Condition and Defect Surveys on Penang Heritage Centre: A Case Study on Georgetown World Heritage Building
by: Othman, Masyatul Husna, et al.
Published: (2012)
by: Othman, Masyatul Husna, et al.
Published: (2012)
Construction Waste Material Management and Logistic System
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
Essential Approach of Maintenance Management System of Office Building
by: Othman, Masyatul Husna, et al.
Published: (2013)
by: Othman, Masyatul Husna, et al.
Published: (2013)
Appraisal of Salt Crystallisation and Rising Damp Problems in Building
by: Aw, Nien Wei, et al.
Published: (2017)
by: Aw, Nien Wei, et al.
Published: (2017)
Best Practice of Construction Waste Management and Minimization
by: Khor, Jie Cheng, et al.
Published: (2014)
by: Khor, Jie Cheng, et al.
Published: (2014)
A Path toward Safer Heritage Buildings through Excellent Fire Prevention and Control System in Malaysia
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
Factors of Deterioration in Building and the Principles
of Repair
by: Mydin, Md Azree Othuman, et al.
Published: (2012)
by: Mydin, Md Azree Othuman, et al.
Published: (2012)
Challenges in the implementation of project management in developing countries: the case of Sultanate of Oman
by: al Muqeemi, Hilal Mohammed Khalifa, et al.
Published: (2008)
by: al Muqeemi, Hilal Mohammed Khalifa, et al.
Published: (2008)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Building Maintenance Management System for Heritage
Museum
by: Othuman Mydin, Md Azree, et al.
Published: (2012)
by: Othuman Mydin, Md Azree, et al.
Published: (2012)
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
Similar Items
-
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016) -
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019) -
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015) -
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020) -
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein