New Procurement Method for Housing Projects Implementing IBS Modular System
One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development...
| Main Authors: | Abd Jalil, Ahmad, Nuruddin, Azlan Raofuddin, Jaafar, Mastura, Othuman Mydin, Md Azree |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/30068/ http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf |
Similar Items
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Malaysian Housing Developers: An Analysis Of The Factors Behind Corporate Successes
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
Business Success and Psychological Traits of Housing Developers
by: Jaafar, Mastura, et al.
Published: (2014)
by: Jaafar, Mastura, et al.
Published: (2014)
Managerial capabilities of housing developers:
building the competitive advantage of a firm
by: Jaafar, Mastura, et al.
Published: (2016)
by: Jaafar, Mastura, et al.
Published: (2016)
Unveiling the Challenges Faced By Malaysian Housing Developers
through Government Policy Changes
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)
Unleashing the Competitive Advantage of Malaysian Private Housing Developers
through Product Analysis
by: Jaafar, Mastura, et al.
Published: (2015)
by: Jaafar, Mastura, et al.
Published: (2015)
Women’s Consultant Participation In The Malaysian Construction Industry
by: Jaafar, Mastura, et al.
Published: (2015)
by: Jaafar, Mastura, et al.
Published: (2015)
Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Elastic Modulus of Foamcrete in Compression and Bending at Elevated Temperatures
by: Othuman Mydin, Md Azree
Published: (2012)
by: Othuman Mydin, Md Azree
Published: (2012)
Engineering Performance Of High Strength Concrete
Containing Steel Fibre Reinforcement
by: Othuman Mydin, Md Azree
Published: (2013)
by: Othuman Mydin, Md Azree
Published: (2013)
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019)
by: Yap, Zhi Shan, et al.
Published: (2019)
Payment issues in Malaysia industrialised building system (IBS): Literature visit
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
Technology acceptance: Malaysian industrialised building system (IBS) case
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
Earthquake analysis of IBS for single storey housing
by: Yunus, Siti Radiah
Published: (2007)
by: Yunus, Siti Radiah
Published: (2007)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Assessment of Influential Causes of Construction Project
Delay in Malaysian Private Housing from Developer’s
Viewpoint
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Scoping review on procurement and contractual risks affecting PPP housing construction project in Malaysia
by: Putri Zulaiha, Razi, et al.
Published: (2023)
by: Putri Zulaiha, Razi, et al.
Published: (2023)
Malaysian Industrialised Building System (IBS): A review of studies
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
The Influence Of Project Documents On The Outcome Of
Construction Projects Procured By Traditional Contracts In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008)
by: Alaghbari, Wa’el, et al.
Published: (2008)
Classification of Inheritance Shop Houses in George
Town, Penang - UNESCO World Heritage Site
by: Mansor, Rozliani, et al.
Published: (2012)
by: Mansor, Rozliani, et al.
Published: (2012)
Payment issues in Malaysia Industrialised Building System (IBS): A research framework
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)
by: Norsyazwani, Masri
Published: (2019)
The effects of procurement systems toward performance of the refurbishment projects in Malaysia / Susie Chieng Ling
by: Susie, Chieng Ling
Published: (2012)
by: Susie, Chieng Ling
Published: (2012)
Factors influencing Industrialized Building System (IBS) project performance: a systematic review
by: Yusmin, Jaafar, et al.
Published: (2020)
by: Yusmin, Jaafar, et al.
Published: (2020)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Distinctive Structural and Non-Structural Building Defects and Failures in Educational Buildings
by: Tan, Sin Wen, et al.
Published: (2013)
by: Tan, Sin Wen, et al.
Published: (2013)
Condition and Defect Surveys on Penang Heritage Centre: A Case Study on Georgetown World Heritage Building
by: Othman, Masyatul Husna, et al.
Published: (2012)
by: Othman, Masyatul Husna, et al.
Published: (2012)
Construction Waste Material Management and Logistic System
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
Essential Approach of Maintenance Management System of Office Building
by: Othman, Masyatul Husna, et al.
Published: (2013)
by: Othman, Masyatul Husna, et al.
Published: (2013)
Appraisal of Salt Crystallisation and Rising Damp Problems in Building
by: Aw, Nien Wei, et al.
Published: (2017)
by: Aw, Nien Wei, et al.
Published: (2017)
Best Practice of Construction Waste Management and Minimization
by: Khor, Jie Cheng, et al.
Published: (2014)
by: Khor, Jie Cheng, et al.
Published: (2014)
A Path toward Safer Heritage Buildings through Excellent Fire Prevention and Control System in Malaysia
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
by: Othuman Mydin, Md Azree, et al.
Published: (2014)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Training New Housing Entrepreneurs — A Malaysian Scenario
by: Jaafar, Mastura, et al.
Published: (2015)
by: Jaafar, Mastura, et al.
Published: (2015)
An investigation on benefits and future expectation of Industrialised Building System (IBS) implementation in construction practices
by: Ismail, Hassan, et al.
Published: (2018)
by: Ismail, Hassan, et al.
Published: (2018)
Multi-Attribute Utility Theory for Selecting an Appropriate
Procurement Method in the Construction Projects
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
Factors of Deterioration in Building and the Principles
of Repair
by: Mydin, Md Azree Othuman, et al.
Published: (2012)
by: Mydin, Md Azree Othuman, et al.
Published: (2012)
Similar Items
-
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015) -
Malaysian Housing Developers: An Analysis Of The Factors Behind Corporate Successes
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015) -
Business Success and Psychological Traits of Housing Developers
by: Jaafar, Mastura, et al.
Published: (2014) -
Managerial capabilities of housing developers:
building the competitive advantage of a firm
by: Jaafar, Mastura, et al.
Published: (2016) -
Unveiling the Challenges Faced By Malaysian Housing Developers
through Government Policy Changes
by: Nuruddin, Azlan Raofuddin, et al.
Published: (2015)