New Procurement Method for Housing Projects Implementing IBS Modular System
One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development...
| Main Authors: | , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/30068/ http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf |
| _version_ | 1848876271870672896 |
|---|---|
| author | Abd Jalil, Ahmad Nuruddin, Azlan Raofuddin Jaafar, Mastura Othuman Mydin, Md Azree |
| author_facet | Abd Jalil, Ahmad Nuruddin, Azlan Raofuddin Jaafar, Mastura Othuman Mydin, Md Azree |
| author_sort | Abd Jalil, Ahmad |
| building | USM Institutional Repository |
| collection | Online Access |
| description | One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development. The adoption of industrialised building system (IBS) has been recognized as one of the steps under this policy but progress has been very slow. Despite government efforts in introducing the IBS Roadmap as long ago as 2003, no detailed IBS building guidelines or standard regulations for procurement systems or contract documents in terms of tendering, design, construction and operations have been produced. A specific procurement system is required as IBS involves special procedures and processes which are different to traditional methods. Previous researches had concluded that the current traditional and modern procurement methods were not suitable for IBS projects especially in terms of project coordination and payment. |
| first_indexed | 2025-11-15T16:56:54Z |
| format | Conference or Workshop Item |
| id | usm-30068 |
| institution | Universiti Sains Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T16:56:54Z |
| publishDate | 2015 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | usm-300682018-01-03T11:11:43Z http://eprints.usm.my/30068/ New Procurement Method for Housing Projects Implementing IBS Modular System Abd Jalil, Ahmad Nuruddin, Azlan Raofuddin Jaafar, Mastura Othuman Mydin, Md Azree TH Building construction One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development. The adoption of industrialised building system (IBS) has been recognized as one of the steps under this policy but progress has been very slow. Despite government efforts in introducing the IBS Roadmap as long ago as 2003, no detailed IBS building guidelines or standard regulations for procurement systems or contract documents in terms of tendering, design, construction and operations have been produced. A specific procurement system is required as IBS involves special procedures and processes which are different to traditional methods. Previous researches had concluded that the current traditional and modern procurement methods were not suitable for IBS projects especially in terms of project coordination and payment. 2015 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf Abd Jalil, Ahmad and Nuruddin, Azlan Raofuddin and Jaafar, Mastura and Othuman Mydin, Md Azree (2015) New Procurement Method for Housing Projects Implementing IBS Modular System. In: International Conference on Advances in Civil and Environmental Engineering, 2015, G Hotel Penang. (Submitted) |
| spellingShingle | TH Building construction Abd Jalil, Ahmad Nuruddin, Azlan Raofuddin Jaafar, Mastura Othuman Mydin, Md Azree New Procurement Method for Housing Projects Implementing IBS Modular System |
| title | New Procurement Method for Housing Projects Implementing IBS Modular System |
| title_full | New Procurement Method for Housing Projects Implementing IBS Modular System |
| title_fullStr | New Procurement Method for Housing Projects Implementing IBS Modular System |
| title_full_unstemmed | New Procurement Method for Housing Projects Implementing IBS Modular System |
| title_short | New Procurement Method for Housing Projects Implementing IBS Modular System |
| title_sort | new procurement method for housing projects implementing ibs modular system |
| topic | TH Building construction |
| url | http://eprints.usm.my/30068/ http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf |