New Procurement Method for Housing Projects Implementing IBS Modular System

One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development...

Full description

Bibliographic Details
Main Authors: Abd Jalil, Ahmad, Nuruddin, Azlan Raofuddin, Jaafar, Mastura, Othuman Mydin, Md Azree
Format: Conference or Workshop Item
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.usm.my/30068/
http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf
_version_ 1848876271870672896
author Abd Jalil, Ahmad
Nuruddin, Azlan Raofuddin
Jaafar, Mastura
Othuman Mydin, Md Azree
author_facet Abd Jalil, Ahmad
Nuruddin, Azlan Raofuddin
Jaafar, Mastura
Othuman Mydin, Md Azree
author_sort Abd Jalil, Ahmad
building USM Institutional Repository
collection Online Access
description One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development. The adoption of industrialised building system (IBS) has been recognized as one of the steps under this policy but progress has been very slow. Despite government efforts in introducing the IBS Roadmap as long ago as 2003, no detailed IBS building guidelines or standard regulations for procurement systems or contract documents in terms of tendering, design, construction and operations have been produced. A specific procurement system is required as IBS involves special procedures and processes which are different to traditional methods. Previous researches had concluded that the current traditional and modern procurement methods were not suitable for IBS projects especially in terms of project coordination and payment.
first_indexed 2025-11-15T16:56:54Z
format Conference or Workshop Item
id usm-30068
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T16:56:54Z
publishDate 2015
recordtype eprints
repository_type Digital Repository
spelling usm-300682018-01-03T11:11:43Z http://eprints.usm.my/30068/ New Procurement Method for Housing Projects Implementing IBS Modular System Abd Jalil, Ahmad Nuruddin, Azlan Raofuddin Jaafar, Mastura Othuman Mydin, Md Azree TH Building construction One of the significant contributors to Malaysian gross domestic product is housing projects. To increase the effectiveness of housing project performance, the Malaysian National Housing Policy identified several strategies including Strategic Thrusts 3 and 5 which is through research and development. The adoption of industrialised building system (IBS) has been recognized as one of the steps under this policy but progress has been very slow. Despite government efforts in introducing the IBS Roadmap as long ago as 2003, no detailed IBS building guidelines or standard regulations for procurement systems or contract documents in terms of tendering, design, construction and operations have been produced. A specific procurement system is required as IBS involves special procedures and processes which are different to traditional methods. Previous researches had concluded that the current traditional and modern procurement methods were not suitable for IBS projects especially in terms of project coordination and payment. 2015 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf Abd Jalil, Ahmad and Nuruddin, Azlan Raofuddin and Jaafar, Mastura and Othuman Mydin, Md Azree (2015) New Procurement Method for Housing Projects Implementing IBS Modular System. In: International Conference on Advances in Civil and Environmental Engineering, 2015, G Hotel Penang. (Submitted)
spellingShingle TH Building construction
Abd Jalil, Ahmad
Nuruddin, Azlan Raofuddin
Jaafar, Mastura
Othuman Mydin, Md Azree
New Procurement Method for Housing Projects Implementing IBS Modular System
title New Procurement Method for Housing Projects Implementing IBS Modular System
title_full New Procurement Method for Housing Projects Implementing IBS Modular System
title_fullStr New Procurement Method for Housing Projects Implementing IBS Modular System
title_full_unstemmed New Procurement Method for Housing Projects Implementing IBS Modular System
title_short New Procurement Method for Housing Projects Implementing IBS Modular System
title_sort new procurement method for housing projects implementing ibs modular system
topic TH Building construction
url http://eprints.usm.my/30068/
http://eprints.usm.my/30068/1/A_NEW_PROCUREMENT_METHOD_FOR_HOUSING_PROJECTS_IMPLEMENTING_IBS_MODULAR_SYSTEM.pdf