EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.

Bibliographic Details
Main Author: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Format: Teaching Resource
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.usm.my/1218/
http://eprints.usm.my/1218/1/EPM_202%283%29_-_SISTEM_PEMBUATAN_APRIL-MEI_06.pdf
_version_ 1848868646167773184
author PPKM, Pusat Pengajian Kejuruteraan Mekanikal
author_facet PPKM, Pusat Pengajian Kejuruteraan Mekanikal
author_sort PPKM, Pusat Pengajian Kejuruteraan Mekanikal
building USM Institutional Repository
collection Online Access
first_indexed 2025-11-15T14:55:42Z
format Teaching Resource
id usm-1218
institution Universiti Sains Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T14:55:42Z
publishDate 2006
recordtype eprints
repository_type Digital Repository
spelling usm-12182017-04-17T09:51:29Z http://eprints.usm.my/1218/ EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06. PPKM, Pusat Pengajian Kejuruteraan Mekanikal T58.7-58.8 Production capacity. Manufacturing capacity 2006-04 Teaching Resource NonPeerReviewed application/pdf en http://eprints.usm.my/1218/1/EPM_202%283%29_-_SISTEM_PEMBUATAN_APRIL-MEI_06.pdf PPKM, Pusat Pengajian Kejuruteraan Mekanikal (2006) EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06. [Teaching Resource]
spellingShingle T58.7-58.8 Production capacity. Manufacturing capacity
PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.
title EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.
title_full EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.
title_fullStr EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.
title_full_unstemmed EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.
title_short EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06.
title_sort epm 202(3) - sistem pembuatan april-mei 06.
topic T58.7-58.8 Production capacity. Manufacturing capacity
url http://eprints.usm.my/1218/
http://eprints.usm.my/1218/1/EPM_202%283%29_-_SISTEM_PEMBUATAN_APRIL-MEI_06.pdf