Techno-economics analysis of battery energy storage system (BESS) design for virtual power plant (VPP)-a case study in Malaysia
Renewable Energy (RE) penetration to power system has been a trend in recent years. Malaysia under the new RE target has a vision to achieve 20% of RE in energy mix by 2025. Flexibility and stability of power system can be a concern due to high penetration of RE in the system. Battery Energy Storage...
Full description
Bibliographic Details
| Main Authors: |
Wan Abdullah, Wan Syakirah,
Osman, Miszaina,
Ab Kadir, Mohd Zainal Abidin,
Verayiah, Renuga,
Ab Aziz, Nur Fadilah,
Abdul Rasheed, Mohamed |
| Format: | Article
|
| Published: |
Elsevier BV
2021
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/95307/
|