May take 6 weeks for Selangor to see drop
| Main Author: | |
|---|---|
| Format: | Newspaper |
| Language: | English |
| Published: |
2020
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/83935/ http://psasir.upm.edu.my/id/eprint/83935/1/MAY_TAKE_6_WEEKS_FOR_SELANGOR_TO_SEE_DROP_NST_LOCAL_NEWS_FRONT_PAGE_part1.pdf |
| _version_ | 1848859671383769088 |
|---|---|
| author | Babulal, Veena |
| author_facet | Babulal, Veena |
| author_sort | Babulal, Veena |
| building | UPM Institutional Repository |
| collection | Online Access |
| first_indexed | 2025-11-15T12:33:03Z |
| format | Newspaper |
| id | upm-83935 |
| institution | Universiti Putra Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T12:33:03Z |
| publishDate | 2020 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | upm-839352020-11-16T23:48:46Z http://psasir.upm.edu.my/id/eprint/83935/ May take 6 weeks for Selangor to see drop Babulal, Veena 2020-10-15 Newspaper NonPeerReviewed text en http://psasir.upm.edu.my/id/eprint/83935/1/MAY_TAKE_6_WEEKS_FOR_SELANGOR_TO_SEE_DROP_NST_LOCAL_NEWS_FRONT_PAGE_part1.pdf Babulal, Veena May take 6 weeks for Selangor to see drop. in New Straits Times, (15 October 2020), p. 1. (Call Number: 2020/10-037) |
| spellingShingle | Babulal, Veena May take 6 weeks for Selangor to see drop |
| title | May take 6 weeks for Selangor to see drop |
| title_full | May take 6 weeks for Selangor to see drop |
| title_fullStr | May take 6 weeks for Selangor to see drop |
| title_full_unstemmed | May take 6 weeks for Selangor to see drop |
| title_short | May take 6 weeks for Selangor to see drop |
| title_sort | may take 6 weeks for selangor to see drop |
| url | http://psasir.upm.edu.my/id/eprint/83935/ http://psasir.upm.edu.my/id/eprint/83935/1/MAY_TAKE_6_WEEKS_FOR_SELANGOR_TO_SEE_DROP_NST_LOCAL_NEWS_FRONT_PAGE_part1.pdf |