Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd

This case was about the implementation of a new software system in Cowboy Semiconductor (M) Sdn Bhd (eSSB). During the course of implementation, the company encountered several foreseeable and unforeseeable problems. The objective of this case study was to identify the lessons learned and how to...

Full description

Bibliographic Details
Main Author: Tan, It Hong
Format: Project Paper Report
Language:English
English
Published: 1998
Subjects:
Online Access:http://psasir.upm.edu.my/id/eprint/8113/
http://psasir.upm.edu.my/id/eprint/8113/1/GSM_1998_26_.pdf
_version_ 1848840781445464064
author Tan, It Hong
author_facet Tan, It Hong
author_sort Tan, It Hong
building UPM Institutional Repository
collection Online Access
description This case was about the implementation of a new software system in Cowboy Semiconductor (M) Sdn Bhd (eSSB). During the course of implementation, the company encountered several foreseeable and unforeseeable problems. The objective of this case study was to identify the lessons learned and how to overcome these problems. Quality Tracking System (QTS) program was introduced to CSSB in October 1997 with the intention to improve productivity. However after 6 months of implementation, management found that there was continuous resistance from employees to accept this new system. From the analysis of this case, it was found that the resistance was mainly due to lack in proper planning during the initial implementation. The QTS software itself was not ready during initial release. This has created a lot of problems for the users and users refused to use the system. Employees were also resistance to change because ars changed the way they used to work. Support given by information group and management toward this project was very bad due to a shift in management's priority. CSSB management needs to make some changes on QTS in order for it to be successful implemented. It is recommended that the period of implementation be extended . A new well-thought plan must be developed and implemented and motivation programmes for employees should be part of the plan. Finally an evaluation and control programme need to be incorporated into the plan to ensure the project was always on the right track
first_indexed 2025-11-15T07:32:48Z
format Project Paper Report
id upm-8113
institution Universiti Putra Malaysia
institution_category Local University
language English
English
last_indexed 2025-11-15T07:32:48Z
publishDate 1998
recordtype eprints
repository_type Digital Repository
spelling upm-81132023-12-08T01:56:27Z http://psasir.upm.edu.my/id/eprint/8113/ Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd Tan, It Hong This case was about the implementation of a new software system in Cowboy Semiconductor (M) Sdn Bhd (eSSB). During the course of implementation, the company encountered several foreseeable and unforeseeable problems. The objective of this case study was to identify the lessons learned and how to overcome these problems. Quality Tracking System (QTS) program was introduced to CSSB in October 1997 with the intention to improve productivity. However after 6 months of implementation, management found that there was continuous resistance from employees to accept this new system. From the analysis of this case, it was found that the resistance was mainly due to lack in proper planning during the initial implementation. The QTS software itself was not ready during initial release. This has created a lot of problems for the users and users refused to use the system. Employees were also resistance to change because ars changed the way they used to work. Support given by information group and management toward this project was very bad due to a shift in management's priority. CSSB management needs to make some changes on QTS in order for it to be successful implemented. It is recommended that the period of implementation be extended . A new well-thought plan must be developed and implemented and motivation programmes for employees should be part of the plan. Finally an evaluation and control programme need to be incorporated into the plan to ensure the project was always on the right track 1998 Project Paper Report NonPeerReviewed text en http://psasir.upm.edu.my/id/eprint/8113/1/GSM_1998_26_.pdf Tan, It Hong (1998) Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd. [Project Paper Report] Cowboy Semiconductors (M) Sdn. Bhd Computer software - Development - Malaysia English
spellingShingle Cowboy Semiconductors (M) Sdn. Bhd
Computer software - Development - Malaysia
Tan, It Hong
Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd
title Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd
title_full Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd
title_fullStr Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd
title_full_unstemmed Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd
title_short Quality Tracking System and Cowboy Semiconductors (M) Sdn Bhd
title_sort quality tracking system and cowboy semiconductors (m) sdn bhd
topic Cowboy Semiconductors (M) Sdn. Bhd
Computer software - Development - Malaysia
url http://psasir.upm.edu.my/id/eprint/8113/
http://psasir.upm.edu.my/id/eprint/8113/1/GSM_1998_26_.pdf