Strategies to improve cost and time control using building information model (BIM)

The demand for the use of a more advanced technology to manage projects information all through their life cycle is very important. An increase in construction sector productivity also means employing modern construction technologies, such as improved and increased mechanisation and such technologie...

Full description

Bibliographic Details
Main Authors: Muhammad, Muhammad Tahir, Haron, Nuzul Azam, Ales @ Alias, Aidi Hizami, Harun, Aizul Nahar
Format: Conference or Workshop Item
Language:English
Published: 2016
Online Access:http://psasir.upm.edu.my/id/eprint/64258/
http://psasir.upm.edu.my/id/eprint/64258/1/icim-2016-malaysia-1.pdf
_version_ 1848854952272723968
author Muhammad, Muhammad Tahir
Haron, Nuzul Azam
Ales @ Alias, Aidi Hizami
Harun, Aizul Nahar
author_facet Muhammad, Muhammad Tahir
Haron, Nuzul Azam
Ales @ Alias, Aidi Hizami
Harun, Aizul Nahar
author_sort Muhammad, Muhammad Tahir
building UPM Institutional Repository
collection Online Access
description The demand for the use of a more advanced technology to manage projects information all through their life cycle is very important. An increase in construction sector productivity also means employing modern construction technologies, such as improved and increased mechanisation and such technologies as Building Information Model and Industrialised Building Systems. More also, it is important that skills are improved and intensify to raise productivity that can handle more sophisticated building methods. Presently it is believed to a large extent that the emergence of Building Information Model (BIM) can lead to better productivity in the industry. However, BIM as an alternative technology in Malaysia need to be studied to provide proof that it can satisfy the industry’s need to improve on cost and time control. The aim of this research is to develop strategies that will be used to improve cost and time control in the industry through the use of BIM. This will be achieved through the use of a mixed method of enquiry (semi-structured interview and questionnaire).
first_indexed 2025-11-15T11:18:02Z
format Conference or Workshop Item
id upm-64258
institution Universiti Putra Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T11:18:02Z
publishDate 2016
recordtype eprints
repository_type Digital Repository
spelling upm-642582019-12-02T07:10:57Z http://psasir.upm.edu.my/id/eprint/64258/ Strategies to improve cost and time control using building information model (BIM) Muhammad, Muhammad Tahir Haron, Nuzul Azam Ales @ Alias, Aidi Hizami Harun, Aizul Nahar The demand for the use of a more advanced technology to manage projects information all through their life cycle is very important. An increase in construction sector productivity also means employing modern construction technologies, such as improved and increased mechanisation and such technologies as Building Information Model and Industrialised Building Systems. More also, it is important that skills are improved and intensify to raise productivity that can handle more sophisticated building methods. Presently it is believed to a large extent that the emergence of Building Information Model (BIM) can lead to better productivity in the industry. However, BIM as an alternative technology in Malaysia need to be studied to provide proof that it can satisfy the industry’s need to improve on cost and time control. The aim of this research is to develop strategies that will be used to improve cost and time control in the industry through the use of BIM. This will be achieved through the use of a mixed method of enquiry (semi-structured interview and questionnaire). 2016 Conference or Workshop Item PeerReviewed text en http://psasir.upm.edu.my/id/eprint/64258/1/icim-2016-malaysia-1.pdf Muhammad, Muhammad Tahir and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Harun, Aizul Nahar (2016) Strategies to improve cost and time control using building information model (BIM). In: 13th International Conference on Innovation and Management (ICIM 2016), 28-30 Nov. 2016, Kuala Lumpur, Malaysia. (pp. 95-110).
spellingShingle Muhammad, Muhammad Tahir
Haron, Nuzul Azam
Ales @ Alias, Aidi Hizami
Harun, Aizul Nahar
Strategies to improve cost and time control using building information model (BIM)
title Strategies to improve cost and time control using building information model (BIM)
title_full Strategies to improve cost and time control using building information model (BIM)
title_fullStr Strategies to improve cost and time control using building information model (BIM)
title_full_unstemmed Strategies to improve cost and time control using building information model (BIM)
title_short Strategies to improve cost and time control using building information model (BIM)
title_sort strategies to improve cost and time control using building information model (bim)
url http://psasir.upm.edu.my/id/eprint/64258/
http://psasir.upm.edu.my/id/eprint/64258/1/icim-2016-malaysia-1.pdf