Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms

Resource-Constrained Project Scheduling Problem (RCPSP) is considered as an important project scheduling problem. However, increasing dimensions of a project, whether in number of activities or resource availability, cause unused resources through the planning horizon. Such phenomena may increase ma...

Full description

Bibliographic Details
Main Authors: Mohd Ariffin, Mohd Khairol Anuar, Baharudin, B. T. Hang Tuah, Leman, Zulkiflle, Delgoshaei, Aidin
Format: Article
Language:English
Published: Growing Science 2015
Online Access:http://psasir.upm.edu.my/id/eprint/45488/
http://psasir.upm.edu.my/id/eprint/45488/1/GENETIC.pdf
_version_ 1848850509328285696
author Mohd Ariffin, Mohd Khairol Anuar
Baharudin, B. T. Hang Tuah
Leman, Zulkiflle
Delgoshaei, Aidin
author_facet Mohd Ariffin, Mohd Khairol Anuar
Baharudin, B. T. Hang Tuah
Leman, Zulkiflle
Delgoshaei, Aidin
author_sort Mohd Ariffin, Mohd Khairol Anuar
building UPM Institutional Repository
collection Online Access
description Resource-Constrained Project Scheduling Problem (RCPSP) is considered as an important project scheduling problem. However, increasing dimensions of a project, whether in number of activities or resource availability, cause unused resources through the planning horizon. Such phenomena may increase makespan of a project and also decline resource-usage efficiency. To solve this problem, many methods have been proposed before. In this article, an effective backward-forward search method (BFSM) is proposed using Greedy algorithm that is employed as a part of a hybrid with a two-stage genetic algorithm (BFSM-GA). The proposed method is explained using some related examples from literature and the results are then compared with a forward serial programming method. In addition, the performance of the proposed method is measured using a mathematical metric. Our findings show that the proposed approach can provide schedules with good quality for both small and large scale problems.
first_indexed 2025-11-15T10:07:25Z
format Article
id upm-45488
institution Universiti Putra Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T10:07:25Z
publishDate 2015
publisher Growing Science
recordtype eprints
repository_type Digital Repository
spelling upm-454882021-01-23T22:26:41Z http://psasir.upm.edu.my/id/eprint/45488/ Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms Mohd Ariffin, Mohd Khairol Anuar Baharudin, B. T. Hang Tuah Leman, Zulkiflle Delgoshaei, Aidin Resource-Constrained Project Scheduling Problem (RCPSP) is considered as an important project scheduling problem. However, increasing dimensions of a project, whether in number of activities or resource availability, cause unused resources through the planning horizon. Such phenomena may increase makespan of a project and also decline resource-usage efficiency. To solve this problem, many methods have been proposed before. In this article, an effective backward-forward search method (BFSM) is proposed using Greedy algorithm that is employed as a part of a hybrid with a two-stage genetic algorithm (BFSM-GA). The proposed method is explained using some related examples from literature and the results are then compared with a forward serial programming method. In addition, the performance of the proposed method is measured using a mathematical metric. Our findings show that the proposed approach can provide schedules with good quality for both small and large scale problems. Growing Science 2015 Article PeerReviewed text en http://psasir.upm.edu.my/id/eprint/45488/1/GENETIC.pdf Mohd Ariffin, Mohd Khairol Anuar and Baharudin, B. T. Hang Tuah and Leman, Zulkiflle and Delgoshaei, Aidin (2015) Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms. International Journal of Industrial Engineering Computations, 6 (4). pp. 503-520. ISSN 1923-2934; ESSN: 1923-2926 http://growingscience.com/beta/ijiec/2016-minimizing-makespan-of-a-resource-constrained-scheduling-problem-a-hybrid-greedy-and-genetic-algorithms.html 10.5267/j.ijiec.2015.5.002
spellingShingle Mohd Ariffin, Mohd Khairol Anuar
Baharudin, B. T. Hang Tuah
Leman, Zulkiflle
Delgoshaei, Aidin
Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
title Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
title_full Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
title_fullStr Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
title_full_unstemmed Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
title_short Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
title_sort minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
url http://psasir.upm.edu.my/id/eprint/45488/
http://psasir.upm.edu.my/id/eprint/45488/
http://psasir.upm.edu.my/id/eprint/45488/
http://psasir.upm.edu.my/id/eprint/45488/1/GENETIC.pdf