Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood

This paper presents the results of an investigation to determine the potential of Leucaena leucocephala as a commercial energy crop for dendro-power generation plants. Dendro-power generation is the generation of electricity from wood fuels. Modern technology enables the efficient, clean and long-te...

Full description

Bibliographic Details
Main Authors: Muhamad, Mohd Izhwan, Mohd Radzi, Mohd Amran, Othman, Mohammad Lutfi, Hizam, Hashim, Gomes, Chandima, Alias, Mohamad Azani
Format: Conference or Workshop Item
Published: IEEE 2023
Online Access:http://psasir.upm.edu.my/id/eprint/37679/
_version_ 1848848672750567424
author Muhamad, Mohd Izhwan
Mohd Radzi, Mohd Amran
Othman, Mohammad Lutfi
Hizam, Hashim
Gomes, Chandima
Alias, Mohamad Azani
author_facet Muhamad, Mohd Izhwan
Mohd Radzi, Mohd Amran
Othman, Mohammad Lutfi
Hizam, Hashim
Gomes, Chandima
Alias, Mohamad Azani
author_sort Muhamad, Mohd Izhwan
building UPM Institutional Repository
collection Online Access
description This paper presents the results of an investigation to determine the potential of Leucaena leucocephala as a commercial energy crop for dendro-power generation plants. Dendro-power generation is the generation of electricity from wood fuels. Modern technology enables the efficient, clean and long-term use of wood in dendro power plants. Various tests and calculations have been carried out, such as moisture content, physical analysis and calorific value of tree species. The Leucaena leucocephala yield per unit area of the special plantation for the development of 10 MW dendro power plants was estimated. The development of a 10 MW dendro power plant provides for an annual electricity generation of 50 GWh, which can be used for self-consumption or sold to a power company. This study provides a quantitative approach to estimating the wood requirements for Dendro power generation which has not been done before. From the calculation, the annual fuel consumption of the Dendro power plant requires 48,880 tons/year. Therefore, the total area required for planting the energy plant Leucaena leucocephala is 815 hectares. The number of Leucaena leucocephala trees required to meet the annual fuel consumption of the Dendro power plant is 4,075,000 trees. The implementation of this project will also help the economic development of local communities, especially in rural areas.
first_indexed 2025-11-15T09:38:14Z
format Conference or Workshop Item
id upm-37679
institution Universiti Putra Malaysia
institution_category Local University
last_indexed 2025-11-15T09:38:14Z
publishDate 2023
publisher IEEE
recordtype eprints
repository_type Digital Repository
spelling upm-376792023-09-28T05:21:23Z http://psasir.upm.edu.my/id/eprint/37679/ Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood Muhamad, Mohd Izhwan Mohd Radzi, Mohd Amran Othman, Mohammad Lutfi Hizam, Hashim Gomes, Chandima Alias, Mohamad Azani This paper presents the results of an investigation to determine the potential of Leucaena leucocephala as a commercial energy crop for dendro-power generation plants. Dendro-power generation is the generation of electricity from wood fuels. Modern technology enables the efficient, clean and long-term use of wood in dendro power plants. Various tests and calculations have been carried out, such as moisture content, physical analysis and calorific value of tree species. The Leucaena leucocephala yield per unit area of the special plantation for the development of 10 MW dendro power plants was estimated. The development of a 10 MW dendro power plant provides for an annual electricity generation of 50 GWh, which can be used for self-consumption or sold to a power company. This study provides a quantitative approach to estimating the wood requirements for Dendro power generation which has not been done before. From the calculation, the annual fuel consumption of the Dendro power plant requires 48,880 tons/year. Therefore, the total area required for planting the energy plant Leucaena leucocephala is 815 hectares. The number of Leucaena leucocephala trees required to meet the annual fuel consumption of the Dendro power plant is 4,075,000 trees. The implementation of this project will also help the economic development of local communities, especially in rural areas. IEEE 2023 Conference or Workshop Item PeerReviewed Muhamad, Mohd Izhwan and Mohd Radzi, Mohd Amran and Othman, Mohammad Lutfi and Hizam, Hashim and Gomes, Chandima and Alias, Mohamad Azani (2023) Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood. In: 2023 IEEE 3rd International Conference in Power Engineering Applications (ICPEA 2023), 6-7 Mar. 2023, Putrajaya, Malaysia. (pp. 385-390). https://ieeexplore.ieee.org/document/10093187 10.1109/ICPEA56918.2023.10093187
spellingShingle Muhamad, Mohd Izhwan
Mohd Radzi, Mohd Amran
Othman, Mohammad Lutfi
Hizam, Hashim
Gomes, Chandima
Alias, Mohamad Azani
Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood
title Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood
title_full Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood
title_fullStr Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood
title_full_unstemmed Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood
title_short Estimating biomass sources for a 10 MW dendro power plant using Leucaena leucocephala fuel wood
title_sort estimating biomass sources for a 10 mw dendro power plant using leucaena leucocephala fuel wood
url http://psasir.upm.edu.my/id/eprint/37679/
http://psasir.upm.edu.my/id/eprint/37679/
http://psasir.upm.edu.my/id/eprint/37679/