Mixed integer formulation for integration of lot sizing and lot streaming problem with scheduled preventive maintenance
In this study, a mathematical model for the integration of lot sizing and flow shop scheduling with lot streaming was proposed. A mixed-integer linear model for multi-product lot sizing and lot streaming problem was developed. Mixed-integer programming formulation is proposed which will enable user...
| Main Authors: | Mortezaei, Navid, Zulkifli, Norzima |
|---|---|
| Format: | Article |
| Published: |
Maxwell Science Publications
2014
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/34534/ |
Similar Items
Integration of lot sizing and flow shop scheduling with lot streaming
by: Mortezaei, Navid, et al.
Published: (2013)
by: Mortezaei, Navid, et al.
Published: (2013)
Development of mathematical models for integration of lot sizing and flow shop scheduling with lot streaming
by: Mortezaei, Navid
Published: (2015)
by: Mortezaei, Navid
Published: (2015)
N-job, m-macine lot streaming problem with learning effects
by: Mortezaei, Navid, et al.
Published: (2014)
by: Mortezaei, Navid, et al.
Published: (2014)
Metaheuristic algorithms for solving lot-sizing and scheduling problems in single and multi-plant environments / Maryam Mohammadi
by: Mohammadi, Maryam
Published: (2015)
by: Mohammadi, Maryam
Published: (2015)
Mixed integer programming with decomposition to solve a workforce scheduling and routing problem
by: Laesanklang, Wasakorn, et al.
Published: (2015)
by: Laesanklang, Wasakorn, et al.
Published: (2015)
An asymmetrical jaw can cause a lot of problems
by: Abu Bakar, Noraini
Published: (2018)
by: Abu Bakar, Noraini
Published: (2018)
Extended decomposition for mixed integer programming to solve a workforce scheduling and routing problem
by: Laesanklang, Wasakorn, et al.
Published: (2015)
by: Laesanklang, Wasakorn, et al.
Published: (2015)
A heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot-sizing problems
by: Sambasivan, Murali, et al.
Published: (2002)
by: Sambasivan, Murali, et al.
Published: (2002)
Parking lot management system
by: Nor Syafiqah, Mat Yusoff
Published: (2019)
by: Nor Syafiqah, Mat Yusoff
Published: (2019)
Trade-off analysis for multi-objective aggregate production planning
by: Mortezaei, Navid, et al.
Published: (2015)
by: Mortezaei, Navid, et al.
Published: (2015)
'Science has a lot to offer'
by: The Star, Shaun Ho
Published: (2012)
by: The Star, Shaun Ho
Published: (2012)
Formulation of integer programming model for balancing and
scheduling of production line having shared resources
by: Emrul Kays, H. M., et al.
Published: (2014)
by: Emrul Kays, H. M., et al.
Published: (2014)
Application of fixed order period lot sizing rule in capacitated make-to-order production systems
by: Tang, Sai Hong, et al.
Published: (2013)
by: Tang, Sai Hong, et al.
Published: (2013)
A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
by: Sambasivan, Murali
Published: (2008)
by: Sambasivan, Murali
Published: (2008)
A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
by: Sambasivan, Murali, et al.
Published: (2005)
by: Sambasivan, Murali, et al.
Published: (2005)
Efficient lot batching system for furnace operation
by: Ibrahim, Kader, et al.
Published: (2003)
by: Ibrahim, Kader, et al.
Published: (2003)
Flow characteristics of individual lot stormwater detention
by: Mah, Darrien Yau Seng, et al.
Published: (2016)
by: Mah, Darrien Yau Seng, et al.
Published: (2016)
Seminar Highway di Lot 77 2005.
by: University Malaysia Sarawak, Faculty of Medicine and Health Science
Published: (2005)
by: University Malaysia Sarawak, Faculty of Medicine and Health Science
Published: (2005)
Lot Pameran UPM Jadi Tumpuan Kenamaan
by: Universiti Putra Malaysia, Bahagian Komunikasi Korporat
Published: (2008)
by: Universiti Putra Malaysia, Bahagian Komunikasi Korporat
Published: (2008)
There's a lot to learn about road safety
by: Sani, Rozana
Published: (2019)
by: Sani, Rozana
Published: (2019)
Planning and scheduling operating rooms with mix integer programming and meta-heuristic method
by: Askarizadeh, Mehdi, et al.
Published: (2018)
by: Askarizadeh, Mehdi, et al.
Published: (2018)
Operating rooms planning and scheduling with mix integer programming and meta-heuristic method
by: Askarizadeh, Mehdi, et al.
Published: (2017)
by: Askarizadeh, Mehdi, et al.
Published: (2017)
Evaluation of urban trees selection for sustainable parking lots
by: Dayang Zahidah, binti Abg Mohamad Othman
Published: (2014)
by: Dayang Zahidah, binti Abg Mohamad Othman
Published: (2014)
Mixed integer goal programming model for flexible job shop scheduling problem (FJSSP) with load balancing / Shirley Sinatra Gran
by: Gran, Shirley Sinatra
Published: (2014)
by: Gran, Shirley Sinatra
Published: (2014)
Heat exchanger fouling model and preventive maintenance scheduling tool
by: V.R., Radhakrishnan, et al.
Published: (2007)
by: V.R., Radhakrishnan, et al.
Published: (2007)
Simulation Of Preventive Maintenance Schedule In Reducing Machine Stoppage And Downtime
by: Mak, Kam Sheng
Published: (2018)
by: Mak, Kam Sheng
Published: (2018)
Mixed integer programming with decomposition for workforce scheduling and routing with time-dependent activities constraints
by: Laesanklang, Wasakorn, et al.
Published: (2016)
by: Laesanklang, Wasakorn, et al.
Published: (2016)
Mixed integer programming model for scheduling in unrelated parallel processor system with priority consideration
by: Caccetta, Louis, et al.
Published: (2014)
by: Caccetta, Louis, et al.
Published: (2014)
Varying Lot Size Model With Equal And Unequal Sized Batch And Varying Numbers Of Batches For Multi-Stage Production In Palm Oil Mill
by: Elaine, Lau Ying Man
Published: (2013)
by: Elaine, Lau Ying Man
Published: (2013)
Development of dynamic programming algorithm for maintenance scheduling problem
by: Zafira Adlia, Mohd Fauzi
Published: (2020)
by: Zafira Adlia, Mohd Fauzi
Published: (2020)
Automatic car parking management system for large parking lot
by: Rashid, Muhammad Mahbubur
Published: (2011)
by: Rashid, Muhammad Mahbubur
Published: (2011)
The Coordination and Optimization of Closed-Loop Supply Chain with Lots of Factors
by: Shi, C., et al.
Published: (2016)
by: Shi, C., et al.
Published: (2016)
Analyzing the efficiency of parking lots around mosque in urban area
by: Zhengan, Tan, et al.
Published: (2015)
by: Zhengan, Tan, et al.
Published: (2015)
The development of mobile application for parking lot management at university campus
by: Ng, Kah Weng
Published: (2020)
by: Ng, Kah Weng
Published: (2020)
Simulation Of Preventive And Corrective Maintenance Schedule In Reducing Machine Stoppage And Downtime
by: Tan, Sze Ming
Published: (2017)
by: Tan, Sze Ming
Published: (2017)
A mixed-integer linear programming model for optimal vessel scheduling in offshore oil and gas operations
by: Mardaneh, Elham, et al.
Published: (2016)
by: Mardaneh, Elham, et al.
Published: (2016)
Parking lot detection using tunable two- mode region of interest
by: Najmi Hafizi, Zabawi
Published: (2016)
by: Najmi Hafizi, Zabawi
Published: (2016)
Natural replacement seashells in porous asphalt mixture for parking lot pavement
by: Safriza, Baharuddin, et al.
Published: (2022)
by: Safriza, Baharuddin, et al.
Published: (2022)
SAISMS : Transforming ammunition management through loT-enabled inventory and safety monitoring system
by: Mohammad Faris, Mahdhir, et al.
Published: (2023)
by: Mohammad Faris, Mahdhir, et al.
Published: (2023)
Multi-objective aggregate production planning model with fuzzy parameters and its solving methods
by: Mortezaei, Navid, et al.
Published: (2013)
by: Mortezaei, Navid, et al.
Published: (2013)
Similar Items
-
Integration of lot sizing and flow shop scheduling with lot streaming
by: Mortezaei, Navid, et al.
Published: (2013) -
Development of mathematical models for integration of lot sizing and flow shop scheduling with lot streaming
by: Mortezaei, Navid
Published: (2015) -
N-job, m-macine lot streaming problem with learning effects
by: Mortezaei, Navid, et al.
Published: (2014) -
Metaheuristic algorithms for solving lot-sizing and scheduling problems in single and multi-plant environments / Maryam Mohammadi
by: Mohammadi, Maryam
Published: (2015) -
Mixed integer programming with decomposition to solve a workforce scheduling and routing problem
by: Laesanklang, Wasakorn, et al.
Published: (2015)