Overhead and activity based costing.
| Main Author: | Osman, Mohammad Noor Hisham |
|---|---|
| Other Authors: | Ong, Tze San |
| Format: | Book Section |
| Language: | English |
| Published: |
McGraw-Hill (Malaysia)
2012
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/26176/ |
Similar Items
Overhead and activity-based costing (ABC).
by: Osman, Mohammad Noor Hisham
Published: (2013)
by: Osman, Mohammad Noor Hisham
Published: (2013)
Intricacies of overhead cost allocations and distortion in costing: a synthesis of the literature / Bülend Terzioglu
by: Terzioglu, Bülend
Published: (2012)
by: Terzioglu, Bülend
Published: (2012)
The influences of overhead cost towards the revenue performance: a study of MASkargo / Nuur Hidayah Abdullah
by: Abdullah, Nuur Hidayah
Published: (2010)
by: Abdullah, Nuur Hidayah
Published: (2010)
Overhead view based person counting using deep learning
by: Kaw, Chee Zhao
Published: (2022)
by: Kaw, Chee Zhao
Published: (2022)
Overhead motorbike crossing opens in kota samarahan
by: The Borneo Post
Published: (2016)
by: The Borneo Post
Published: (2016)
Revealing the Hidden Technology by Means of an Overhead Crane
by: Padula, Fabrizio, et al.
Published: (2017)
by: Padula, Fabrizio, et al.
Published: (2017)
Willingness to use overhead bridge facilities based on theory of planned behavior
by: Sundararajan, Komala Devi, et al.
Published: (2020)
by: Sundararajan, Komala Devi, et al.
Published: (2020)
Absorption costing and variable costing.
by: Osman, Mohammad Noor Hisham, et al.
Published: (2012)
by: Osman, Mohammad Noor Hisham, et al.
Published: (2012)
Analyzing communication overhead in linearizing peer to peer system
by: Muhyiddeen, Abdulfattah, et al.
Published: (2016)
by: Muhyiddeen, Abdulfattah, et al.
Published: (2016)
Modelling railway overhead line equipment asset management
by: Kilsby, Paul
Published: (2017)
by: Kilsby, Paul
Published: (2017)
Robustness evaluation of feedback control scheme for overhead crane
by: Muhammad Salihin, Saealal, et al.
Published: (2011)
by: Muhammad Salihin, Saealal, et al.
Published: (2011)
On the placement of line arrester on underbuilt overhead distribution line
by: Mohd Nawi, Zawati, et al.
Published: (2011)
by: Mohd Nawi, Zawati, et al.
Published: (2011)
Modelling asset management of railway overhead line equipment
by: Kilsby, P., et al.
Published: (2016)
by: Kilsby, P., et al.
Published: (2016)
Job costing system.
by: Osman, Mohammad Noor Hisham
Published: (2013)
by: Osman, Mohammad Noor Hisham
Published: (2013)
A study on the effect of sales revenue and overhead cost towards Malayan Banking Berhad (Maybank) profitability / Nor Aziela Kamaruddin
by: Kamaruddin, Nor Aziela
Published: (2011)
by: Kamaruddin, Nor Aziela
Published: (2011)
Job order costing system.
by: Osman, Mohammad Noor Hisham
Published: (2012)
by: Osman, Mohammad Noor Hisham
Published: (2012)
A Critical Review on the Contamination Effect on Distribution Overhead Lines
by: Ab Kadir, Mohd Zainal Abidin, et al.
Published: (2010)
by: Ab Kadir, Mohd Zainal Abidin, et al.
Published: (2010)
Power transfer capacity improvements of existing
overhead line systems
by: Kopsidas, K., et al.
Published: (2010)
by: Kopsidas, K., et al.
Published: (2010)
On the lightning induced voltage along overhead power distribution line
by: Izadi, Mahdi, et al.
Published: (2014)
by: Izadi, Mahdi, et al.
Published: (2014)
Relevant costing and business decision making.
by: Osman, Mohammad Noor Hisham
Published: (2012)
by: Osman, Mohammad Noor Hisham
Published: (2012)
Relevant costing and business decision making
by: Osman, Mohammad Noor Hisham
Published: (2013)
by: Osman, Mohammad Noor Hisham
Published: (2013)
Edge dissimilarity reduced-reference quality metric with low overhead bitrate
by: Abdul Rahman, Farah Diyana, et al.
Published: (2018)
by: Abdul Rahman, Farah Diyana, et al.
Published: (2018)
Techniques for Sway Control of a Double-Pendulum-Type Overhead Crane
by: Mohd Ashraf, Ahmad, et al.
Published: (2010)
by: Mohd Ashraf, Ahmad, et al.
Published: (2010)
Fuse blow scheme and its impact on overhead distribution system reliability
by: Bajerai, Qaddafi Abdullah
Published: (2014)
by: Bajerai, Qaddafi Abdullah
Published: (2014)
Lightning induced surges on an unenergized test overhead telecommunication subscriber line
by: Sorwar, M.G., et al.
Published: (1998)
by: Sorwar, M.G., et al.
Published: (1998)
A modelling approach for railway overhead line equipment asset management
by: Kilsby, Paul, et al.
Published: (2017)
by: Kilsby, Paul, et al.
Published: (2017)
A dynamic inversion approach for oscillation-free control of overhead cranes
by: Padula, Fabrizio, et al.
Published: (2015)
by: Padula, Fabrizio, et al.
Published: (2015)
Overhead line and underground cable transmission infrastructure project: Questionnaire instruments
by: Ashworth, Peta, et al.
Published: (2023)
by: Ashworth, Peta, et al.
Published: (2023)
Development of an operator interface for a multi-sensor overhead surveillance system
by: Mayo, A., et al.
Published: (2011)
by: Mayo, A., et al.
Published: (2011)
Summary Report Comparing High Voltage Overhead and Underground Transmission Infrastructure
by: Madigan, Gary, et al.
Published: (2023)
by: Madigan, Gary, et al.
Published: (2023)
Practical Sway Motion Control for Double Pendulum-type Overhead Crane System
by: Muhammad Salihin, Saealal, et al.
Published: (2012)
by: Muhammad Salihin, Saealal, et al.
Published: (2012)
Using piecewise affine PID control scheme for double pendulum overhead crane
by: M. I. F., Mohd Haniff, et al.
Published: (2019)
by: M. I. F., Mohd Haniff, et al.
Published: (2019)
Investigation on the 132kV overhead lines lightning-related flashovers in Malaysia
by: Mohamed Rawi, Iryani, et al.
Published: (2015)
by: Mohamed Rawi, Iryani, et al.
Published: (2015)
Planning and conducting magnetic field level measurement from overhead transmission line
by: Luqman, H.M., et al.
Published: (2017)
by: Luqman, H.M., et al.
Published: (2017)
Data-driven PID tuning based on safe experimentation dynamics for control of double-pendulum-type overhead crane
by: Nor Sakinah, Abdul Shukor, et al.
Published: (2018)
by: Nor Sakinah, Abdul Shukor, et al.
Published: (2018)
Cost and management accounting
by: Ong, Tze San, et al.
Published: (2012)
by: Ong, Tze San, et al.
Published: (2012)
Application of activity-based costing and time-driven activity-based costing for kitchen cabinet
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
A Novel Reversible Data Hiding Technique with
High Capacity and Less Overhead Information
by: M. Almangush, Hamida, et al.
Published: (2012)
by: M. Almangush, Hamida, et al.
Published: (2012)
Optimization of the PID-PD parameters of the overhead crane control system by using PSO algorithm
by: Nur Iffah, Mohamed Azmi, et al.
Published: (2019)
by: Nur Iffah, Mohamed Azmi, et al.
Published: (2019)
Tahap Penggunaan Projektor Overhead di Sekolah-Sekolah Luar Bandar: Satu Tinjauan
by: Ab Shukor, Mohd Jan
Published: (1998)
by: Ab Shukor, Mohd Jan
Published: (1998)
Similar Items
-
Overhead and activity-based costing (ABC).
by: Osman, Mohammad Noor Hisham
Published: (2013) -
Intricacies of overhead cost allocations and distortion in costing: a synthesis of the literature / Bülend Terzioglu
by: Terzioglu, Bülend
Published: (2012) -
The influences of overhead cost towards the revenue performance: a study of MASkargo / Nuur Hidayah Abdullah
by: Abdullah, Nuur Hidayah
Published: (2010) -
Overhead view based person counting using deep learning
by: Kaw, Chee Zhao
Published: (2022) -
Overhead motorbike crossing opens in kota samarahan
by: The Borneo Post
Published: (2016)