Overall processes capability index for assembly production lines
This study develops a new method called Overall Processes Capability Index (OPCI) to measure the capability of assembly lines. After defining relation between percentage yield and process capability, the new definition of overall defective rate is developed for assembly lines in different cases (ser...
| Main Authors: | Abdolshah, Mohammad, Mohd. Yusuff, Rosnah, Tang, Sai Hong, Ismail, Md. Yusof |
|---|---|
| Format: | Article |
| Language: | English English |
| Published: |
Asian Network for Scientific Information
2009
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/16014/ http://psasir.upm.edu.my/id/eprint/16014/1/Overall%20processes%20capability%20index%20for%20assembly%20production%20lines.pdf |
Similar Items
New process capability index using Taguchi loss functions
by: Abdolshah, Mohammad, et al.
Published: (2009)
by: Abdolshah, Mohammad, et al.
Published: (2009)
A new asymmetric bounded loss-based process capability index
by: Abdolshah, Mohammad, et al.
Published: (2010)
by: Abdolshah, Mohammad, et al.
Published: (2010)
Measuring process capability index Cpmk with fuzzy data and compare it with other fuzzy process capability indices
by: Abdolshah, Mohammad, et al.
Published: (2011)
by: Abdolshah, Mohammad, et al.
Published: (2011)
Loss-based process capability indices: a review
by: Abdolshah, Mohammad, et al.
Published: (2011)
by: Abdolshah, Mohammad, et al.
Published: (2011)
Development of a fuzzy loss-based process capability index
by: Abdolshah, Mohamad
Published: (2010)
by: Abdolshah, Mohamad
Published: (2010)
Overall equipment effectiveness improvement through total productive maintenance in assembly cell
by: Ismail, Napsiah, et al.
Published: (2013)
by: Ismail, Napsiah, et al.
Published: (2013)
Simulation of assembly line for production performance improvement
by: Mohd Saiful Akmal, Razali
Published: (2016)
by: Mohd Saiful Akmal, Razali
Published: (2016)
Descriptive framework for entrepreneur`s capabilities.
by: Zulkifli, Norzima, et al.
Published: (2011)
by: Zulkifli, Norzima, et al.
Published: (2011)
An assembly of means for processing a pineapple or the like.
by: Shamsuddin, Rosnah
Published: (2009)
by: Shamsuddin, Rosnah
Published: (2009)
Production Layout Efficiency Improvement for Armoured Vehicle Assembly Line
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
Assembly line productivity improvement as re-engineered by MOST
by: Karim, A.N. Mustafizul, et al.
Published: (2016)
by: Karim, A.N. Mustafizul, et al.
Published: (2016)
The business value of information system-enabled e-collaboration capabilities
by: Ghobakhloo, Morteza, et al.
Published: (2015)
by: Ghobakhloo, Morteza, et al.
Published: (2015)
Sexual Harassment and Workplace Bullying on Female Employees in Production Assembly Line
by: Amirah Izzati, Mohammad Faizzull, et al.
Published: (2021)
by: Amirah Izzati, Mohammad Faizzull, et al.
Published: (2021)
Overall equipment effectiveness analysis of power magnetic inductor production line at BI technologies sdn. bhd.
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
Modelling and simulation of flexible production line for coil winding assembly
by: Hazimah, Abdul Rahim
Published: (2015)
by: Hazimah, Abdul Rahim
Published: (2015)
Multi-objective aggregate production planning model with fuzzy parameters and its solving methods
by: Mortezaei, Navid, et al.
Published: (2013)
by: Mortezaei, Navid, et al.
Published: (2013)
Analysis and countermeasure to improve overall equipment effectiveness (OEE) on chassis line at Tan Chong Industry
by: Nur Syahirah, Ismail
Published: (2016)
by: Nur Syahirah, Ismail
Published: (2016)
A review of problem solving capabilities in lean process management
by: A. Perumal, Puvanasvaran, et al.
Published: (2008)
by: A. Perumal, Puvanasvaran, et al.
Published: (2008)
Supplier evaluation and selection using revised Tagichi loss function.
by: Sadigh, Aghdas Naimi, et al.
Published: (2009)
by: Sadigh, Aghdas Naimi, et al.
Published: (2009)
Accounting knowledge management capabilities, accounting functional effectiveness and overall university performance : evidence from Malaysia
by: Freida, Ayodele Ozavize
Published: (2018)
by: Freida, Ayodele Ozavize
Published: (2018)
Lean process management implementation through enhanced problem solving capabilities
by: A. Perumal, Puvanasvaran, et al.
Published: (2010)
by: A. Perumal, Puvanasvaran, et al.
Published: (2010)
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2011)
by: M. F. F., Ab Rashid, et al.
Published: (2011)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
Discrete event simulation as a decision making tool for improving overall line efficiency
by: Yong, Wen Yao
Published: (2022)
by: Yong, Wen Yao
Published: (2022)
Evaluation Improvement of Production Productivity Performance using Statistical Process Control, Overall Equipment Efficiency, and Autonomous Maintenance
by: Amir, Azizi
Published: (2015)
by: Amir, Azizi
Published: (2015)
Productivity and Efficiency Improvement Using Witness Simulation and Ergonomic Study in Automotive Assembly Line
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017)
Malaysia overall politics
by: Syed Abdullah Idid, Syed Arabi
Published: (2016)
by: Syed Abdullah Idid, Syed Arabi
Published: (2016)
An efficient assembly line balancing in automobile manufacturing
by: Razman, Mat Tahar, et al.
Published: (2011)
by: Razman, Mat Tahar, et al.
Published: (2011)
Modelling of assembly line balancing with energy consumption
by: Ariff Nijay, Ramli, et al.
Published: (2023)
by: Ariff Nijay, Ramli, et al.
Published: (2023)
ARENA simulation training guideline for
assembly line
by: Maslazim, Norsahira, et al.
Published: (2022)
by: Maslazim, Norsahira, et al.
Published: (2022)
Simulation and re-engineering of truck assembly line
by: Wirabhuana, Arya, et al.
Published: (2008)
by: Wirabhuana, Arya, et al.
Published: (2008)
Improving production system performance using overall equipment effectiveness
by: Lance, Clarence, et al.
Published: (2020)
by: Lance, Clarence, et al.
Published: (2020)
A special discount strategy for supplier selection and order allocation
by: Jadidi, Omid, et al.
Published: (2008)
by: Jadidi, Omid, et al.
Published: (2008)
Multimodal stress-management intervention improves physiological, psychological, and productivity of assembly-line workers
by: Sutarto, Auditya Purwandini, et al.
Published: (2020)
by: Sutarto, Auditya Purwandini, et al.
Published: (2020)
Effect of Tube Spacing, Fin Density and Reynolds Number on Overall Heat Transfer Rate for In-line Configuration
by: Tahseen, Tahseen Ahmad, et al.
Published: (2015)
by: Tahseen, Tahseen Ahmad, et al.
Published: (2015)
Case study 5: analysis of process capability and quality of monoclonal antibody production in biorector
by: Mel, Maizirwan, et al.
Published: (2011)
by: Mel, Maizirwan, et al.
Published: (2011)
Overall Performance of Malaysian Futures Market: Evidence Using Crude Palm Oil and Stock Index Futures Contract
by: Chowdury, Taufiq Hassan Shah
Published: (2001)
by: Chowdury, Taufiq Hassan Shah
Published: (2001)
Multiobjective Fuzzy Mixed Assembly Line Sequencing Optimization Model
by: Tahriri, Farzad, et al.
Published: (2014)
by: Tahriri, Farzad, et al.
Published: (2014)
Parameters of effects in decision making of automotive assembly line using the Analytical Hierarchy Process method
by: Nelfiyanti, Nelfiyanti, et al.
Published: (2022)
by: Nelfiyanti, Nelfiyanti, et al.
Published: (2022)
Assembly Line Efficiency Improvement by Using WITNESS Simulation Software
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2018)
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2018)
Similar Items
-
New process capability index using Taguchi loss functions
by: Abdolshah, Mohammad, et al.
Published: (2009) -
A new asymmetric bounded loss-based process capability index
by: Abdolshah, Mohammad, et al.
Published: (2010) -
Measuring process capability index Cpmk with fuzzy data and compare it with other fuzzy process capability indices
by: Abdolshah, Mohammad, et al.
Published: (2011) -
Loss-based process capability indices: a review
by: Abdolshah, Mohammad, et al.
Published: (2011) -
Development of a fuzzy loss-based process capability index
by: Abdolshah, Mohamad
Published: (2010)