Heavy metal leaching of solidified sludge from a glass components industry

Leaching tests conducted on raw sludge wastes from a glass components manufacturing factory using the US EPA TCLP procedure showed that Pb, Hg, As and Ba leached at pH<3.5 whilst Cd and Cr did not. To control the leaching, asphalt, a mixture of asphalt and powdered activated carbon (PAC) and Port...

Full description

Bibliographic Details
Main Authors: Yaziz, M.I., Chin, F.L., Tang, S.N., Bich, N.N.
Format: Article
Published: Marcel Dekker IncNew York 1999
Online Access:http://psasir.upm.edu.my/id/eprint/115324/
_version_ 1848866747296251904
author Yaziz, M.I.
Chin, F.L.
Tang, S.N.
Bich, N.N.
author_facet Yaziz, M.I.
Chin, F.L.
Tang, S.N.
Bich, N.N.
author_sort Yaziz, M.I.
building UPM Institutional Repository
collection Online Access
description Leaching tests conducted on raw sludge wastes from a glass components manufacturing factory using the US EPA TCLP procedure showed that Pb, Hg, As and Ba leached at pH<3.5 whilst Cd and Cr did not. To control the leaching, asphalt, a mixture of asphalt and powdered activated carbon (PAC) and Portland cement were used as fixing agents to stabilize the sludge. Leaching tests on the stabilized sludge using leachants of pH 2.5-7.0 showed that the lowest leachate metal concentration were obtained from the sludge which had been stabilized using a mixture of asphalt and PAC. Portland cement at a cement-to-sludge ratio of 0.5 also reduced the leaching of metals from the solidified sludge with metals concentrations in the leachate lower than the US EPA regulatory limits.; Leaching tests conducted on raw sludge wastes from a glass components manufacturing factory using the US EPA TCLP procedure showed that Pb, Hg, As and Ba leached at pH<3.5 whilst Cd and Cr did not. To control the leaching, asphalt, a mixture of asphalt and powdered activated carbon (PAC) and Portland cement were used as fixing agents to stabilize the sludge. Leaching tests on the stabilized sludge using leachants of pH 2.5-7.0 showed that the lowest leachate metal concentration were obtained from the sludge which had been stabilized using a mixture of asphalt and PAC. Portland cement at a cement-to-sludge ratio of 0.5 also reduced the leaching of metals from the solidified sludge with metals concentrations in the leachate lower than the US EPA regulatory limits.
first_indexed 2025-11-15T14:25:31Z
format Article
id upm-115324
institution Universiti Putra Malaysia
institution_category Local University
last_indexed 2025-11-15T14:25:31Z
publishDate 1999
publisher Marcel Dekker IncNew York
recordtype eprints
repository_type Digital Repository
spelling upm-1153242025-03-03T03:47:58Z http://psasir.upm.edu.my/id/eprint/115324/ Heavy metal leaching of solidified sludge from a glass components industry Yaziz, M.I. Chin, F.L. Tang, S.N. Bich, N.N. Leaching tests conducted on raw sludge wastes from a glass components manufacturing factory using the US EPA TCLP procedure showed that Pb, Hg, As and Ba leached at pH<3.5 whilst Cd and Cr did not. To control the leaching, asphalt, a mixture of asphalt and powdered activated carbon (PAC) and Portland cement were used as fixing agents to stabilize the sludge. Leaching tests on the stabilized sludge using leachants of pH 2.5-7.0 showed that the lowest leachate metal concentration were obtained from the sludge which had been stabilized using a mixture of asphalt and PAC. Portland cement at a cement-to-sludge ratio of 0.5 also reduced the leaching of metals from the solidified sludge with metals concentrations in the leachate lower than the US EPA regulatory limits.; Leaching tests conducted on raw sludge wastes from a glass components manufacturing factory using the US EPA TCLP procedure showed that Pb, Hg, As and Ba leached at pH<3.5 whilst Cd and Cr did not. To control the leaching, asphalt, a mixture of asphalt and powdered activated carbon (PAC) and Portland cement were used as fixing agents to stabilize the sludge. Leaching tests on the stabilized sludge using leachants of pH 2.5-7.0 showed that the lowest leachate metal concentration were obtained from the sludge which had been stabilized using a mixture of asphalt and PAC. Portland cement at a cement-to-sludge ratio of 0.5 also reduced the leaching of metals from the solidified sludge with metals concentrations in the leachate lower than the US EPA regulatory limits. Marcel Dekker IncNew York 1999 Article PeerReviewed Yaziz, M.I. and Chin, F.L. and Tang, S.N. and Bich, N.N. (1999) Heavy metal leaching of solidified sludge from a glass components industry. Journal of Environmental Science and Health - Part A Toxic/Hazardous Substances and Environmental Engineering, 34 (4). pp. 853-861. ISSN 1093-4529; eISSN: 1093-4529 https://www.tandfonline.com/doi/abs/10.1080/10934529909376869 10.1080/10934529909376869
spellingShingle Yaziz, M.I.
Chin, F.L.
Tang, S.N.
Bich, N.N.
Heavy metal leaching of solidified sludge from a glass components industry
title Heavy metal leaching of solidified sludge from a glass components industry
title_full Heavy metal leaching of solidified sludge from a glass components industry
title_fullStr Heavy metal leaching of solidified sludge from a glass components industry
title_full_unstemmed Heavy metal leaching of solidified sludge from a glass components industry
title_short Heavy metal leaching of solidified sludge from a glass components industry
title_sort heavy metal leaching of solidified sludge from a glass components industry
url http://psasir.upm.edu.my/id/eprint/115324/
http://psasir.upm.edu.my/id/eprint/115324/
http://psasir.upm.edu.my/id/eprint/115324/