Study of management of construction waste material in residential project in Malaysia: a review
The construction industry can be classified as one of the major contributors to the development of Malaysia. Over the years, rapid development in terms of building and infrastructure in Malaysia shows that Malaysia is moving towards a developed country. However, with the increase of construction pro...
| Main Authors: | Sutaji, Hadri Safwan, Haron, Nuzul Azam, Ales@Alias, Aidi Hizami, Hassim, Salihudin, Raja Ahmad Effendi, Raja Ahmad Azmeer |
|---|---|
| Format: | Article |
| Published: |
Inderscience Publishers
2022
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/103340/ |
Similar Items
Critical success factors for building information modelling BIM implementation for power plant projects in Malaysia
by: Aziz, Mohd Azrul, et al.
Published: (2022)
by: Aziz, Mohd Azrul, et al.
Published: (2022)
Construction tender price estimation standardization (TPES) in Malaysia: modeling using fuzzy neural network
by: Hassim, Salihudin, et al.
Published: (2018)
by: Hassim, Salihudin, et al.
Published: (2018)
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
The implementation of Integrated Management Systems (IMS) in construction organizations in Malaysia
by: Ramli, Nor Fazira, et al.
Published: (2023)
by: Ramli, Nor Fazira, et al.
Published: (2023)
Water demand management: a review on the mechanisms to reduce water demand and consumption
by: Ales @ Alias, Aidi Hizami, et al.
Published: (2017)
by: Ales @ Alias, Aidi Hizami, et al.
Published: (2017)
Leadership in construction: a scientometric review
by: Peng, Wang, et al.
Published: (2022)
by: Peng, Wang, et al.
Published: (2022)
A critical review by using SWOT analysis to identifying risk in the Malaysian construction industry: case study evaluation
by: Abdulrahman, Al Tekreeti Ahmed Muneer, et al.
Published: (2024)
by: Abdulrahman, Al Tekreeti Ahmed Muneer, et al.
Published: (2024)
Developing a new model to control risk and improve quality in the construction industry by integrating risk management and quality function deployment
by: Abdulrahman, Al Tekreeti Ahmed Muneer, et al.
Published: (2024)
by: Abdulrahman, Al Tekreeti Ahmed Muneer, et al.
Published: (2024)
The role of the interface and interface management in the optimization of BIM multi-model applications: a review
by: Hmidah, Nawal Abdunasseer, et al.
Published: (2022)
by: Hmidah, Nawal Abdunasseer, et al.
Published: (2022)
A survey on construction cost comparison between conventional and industrialised building system for housing project
by: Md. Rahim, Mohd Syazwan, et al.
Published: (2006)
by: Md. Rahim, Mohd Syazwan, et al.
Published: (2006)
Strategies to improve cost and time control using building information model (BIM)
by: Muhammad, Muhammad Tahir, et al.
Published: (2016)
by: Muhammad, Muhammad Tahir, et al.
Published: (2016)
A bibliometric review on safety risk assessment of construction based on CiteSpace software and WoS database
by: Junjia, Yin, et al.
Published: (2023)
by: Junjia, Yin, et al.
Published: (2023)
Identification and analysis of hoisting safety risk factors for IBS construction based on the AcciMap and cases study
by: Junjia, Yin, et al.
Published: (2024)
by: Junjia, Yin, et al.
Published: (2024)
Exploring quality dimensions from a construction perspective: a literature review
by: Abubakar, Abdurrahman Salihu, et al.
Published: (2023)
by: Abubakar, Abdurrahman Salihu, et al.
Published: (2023)
Construction waste estimation analysis in residential projects of Malaysia
by: Kupusamy, Kumanan, et al.
Published: (2019)
by: Kupusamy, Kumanan, et al.
Published: (2019)
Improving cost and time control in construction using Building Information Model (BIM): a review
by: Muhammad, Muhammad Tahir, et al.
Published: (2018)
by: Muhammad, Muhammad Tahir, et al.
Published: (2018)
Investigating approaches of integrating BIM, IoT, and facility management for renovating existing buildings: a review
by: Altohami, Abubaker Basheer Abdalwhab, et al.
Published: (2021)
by: Altohami, Abubaker Basheer Abdalwhab, et al.
Published: (2021)
Unveiling the mechanisms between project manager leadership competencies and team performance: an empirical study
by: Wang, Peng, et al.
Published: (2024)
by: Wang, Peng, et al.
Published: (2024)
Exploring three pillars of construction robotics via dual-track quantitative analysis
by: Liu, Yuming, et al.
Published: (2024)
by: Liu, Yuming, et al.
Published: (2024)
Composition and Characteristics of Construction Waste Generated by Residential Housing Project
by: Lau, Hieng Ho, et al.
Published: (2008)
by: Lau, Hieng Ho, et al.
Published: (2008)
Composition and Characteristics of Construction Waste
Generated by Residential Housing Project
by: Lau, H.H, et al.
Published: (2008)
by: Lau, H.H, et al.
Published: (2008)
Developing a risk framework for assembly construction based on stakeholder theory and structural equation modelling
by: Junjia, Yin, et al.
Published: (2024)
by: Junjia, Yin, et al.
Published: (2024)
Technology status tracing and trends in construction robotics: a patent analysis
by: Liu, Yuming, et al.
Published: (2024)
by: Liu, Yuming, et al.
Published: (2024)
The implementation of timber construction material for modern residential project
by: Muhammad Hanif Ali,, et al.
by: Muhammad Hanif Ali,, et al.
Construction cost comparison between conventional and formwork system for condominium project
by: Md. Rahim, Mohd Syazwan, et al.
Published: (2013)
by: Md. Rahim, Mohd Syazwan, et al.
Published: (2013)
Developing a method for evaluating the value of hoisting risk response strategies: a multi-stakeholder perspective
by: Junjia, Yin, et al.
Published: (2024)
by: Junjia, Yin, et al.
Published: (2024)
Knowledge map of climate change and transportation: a bibliometric analysis based on citespace
by: Peng, Wang, et al.
Published: (2023)
by: Peng, Wang, et al.
Published: (2023)
Development of a hoisting safety risk framework based on the STAMP theory and PLS-SEM method
by: Junjia, Yin, et al.
Published: (2024)
by: Junjia, Yin, et al.
Published: (2024)
Strategies to improve communication management within virtual project teams
by: Haron, Nuzul Azam, et al.
Published: (2019)
by: Haron, Nuzul Azam, et al.
Published: (2019)
Building cost comparison between conventional and fully prefabricated systems in Malaysia: a case study of single and double storey house
by: Haron, Nuzul Azam, et al.
Published: (2007)
by: Haron, Nuzul Azam, et al.
Published: (2007)
Abandoned project restoration model (APRM) for residential construction projects
by: Doraisamy, Sanitha V.
Published: (2017)
by: Doraisamy, Sanitha V.
Published: (2017)
System and method for testing and grading construction materials
by: Muniandy, Ratnasamy, et al.
Published: (2012)
by: Muniandy, Ratnasamy, et al.
Published: (2012)
Circular economy strategies for small domestic appliance design in China
by: Yi, Xianqin, et al.
Published: (2024)
by: Yi, Xianqin, et al.
Published: (2024)
A joint Bayesian optimization for the classification of fine spatial resolution remotely sensed imagery using object-based convolutional neural networks
by: Azeez, Omer Saud, et al.
Published: (2022)
by: Azeez, Omer Saud, et al.
Published: (2022)
Construction waste estimating model for residential housing projects in Selangor and Kuala Lumpur / Asmawati Che Hasan
by: Che Hasan, Asmawati
Published: (2013)
by: Che Hasan, Asmawati
Published: (2013)
Product development : from invention to innovation
by: Raja Ahmad Effendi, Raja Ahmad Azmeer, et al.
Published: (2013)
by: Raja Ahmad Effendi, Raja Ahmad Azmeer, et al.
Published: (2013)
The effect of communication in identity in virtual project managements
by: Eftekhari, Fathollah, et al.
Published: (2014)
by: Eftekhari, Fathollah, et al.
Published: (2014)
Managing of solid waste on construction site
by: Raja Muhamad Anuar, Raja Mustafa
Published: (2008)
by: Raja Muhamad Anuar, Raja Mustafa
Published: (2008)
Analysis of Government Residential Projects Overruns in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2018)
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2018)
Efficiency in real estate development: Is management or robotics the key?
by: Liu, Yuming, et al.
Published: (2024)
by: Liu, Yuming, et al.
Published: (2024)
Similar Items
-
Critical success factors for building information modelling BIM implementation for power plant projects in Malaysia
by: Aziz, Mohd Azrul, et al.
Published: (2022) -
Construction tender price estimation standardization (TPES) in Malaysia: modeling using fuzzy neural network
by: Hassim, Salihudin, et al.
Published: (2018) -
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017) -
The implementation of Integrated Management Systems (IMS) in construction organizations in Malaysia
by: Ramli, Nor Fazira, et al.
Published: (2023) -
Water demand management: a review on the mechanisms to reduce water demand and consumption
by: Ales @ Alias, Aidi Hizami, et al.
Published: (2017)