Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting

Our purpose in Long Puah was to migrate one of the existing Solar System Unit from the long house to a newly built kindergarten building next to the long house. Mr Simon Tsai (the previous lighting project contractor) had kindly donated one unit of the solar system Due to the donation, the objective...

Full description

Bibliographic Details
Main Author: Jumat, Yusri
Format: Report
Language:English
Published: Isiti-coERI 2015
Subjects:
Online Access:http://ir.unimas.my/id/eprint/8643/
http://ir.unimas.my/id/eprint/8643/1/TPOA-FieldTripReport-Long%20Lamai%20Yusri%20Jumat.pdf
_version_ 1848836409399443456
author Jumat, Yusri
author_facet Jumat, Yusri
author_sort Jumat, Yusri
building UNIMAS Institutional Repository
collection Online Access
description Our purpose in Long Puah was to migrate one of the existing Solar System Unit from the long house to a newly built kindergarten building next to the long house. Mr Simon Tsai (the previous lighting project contractor) had kindly donated one unit of the solar system Due to the donation, the objective was changed instead of migrating one existing solar system at the long house to a kindergarten, to install a new solar system at the kindergarten.
first_indexed 2025-11-15T06:23:18Z
format Report
id unimas-8643
institution Universiti Malaysia Sarawak
institution_category Local University
language English
last_indexed 2025-11-15T06:23:18Z
publishDate 2015
publisher Isiti-coERI
recordtype eprints
repository_type Digital Repository
spelling unimas-86432020-08-12T03:18:30Z http://ir.unimas.my/id/eprint/8643/ Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting Jumat, Yusri Q Science (General) TK Electrical engineering. Electronics Nuclear engineering Our purpose in Long Puah was to migrate one of the existing Solar System Unit from the long house to a newly built kindergarten building next to the long house. Mr Simon Tsai (the previous lighting project contractor) had kindly donated one unit of the solar system Due to the donation, the objective was changed instead of migrating one existing solar system at the long house to a kindergarten, to install a new solar system at the kindergarten. Isiti-coERI 2015-07 Report NonPeerReviewed text en http://ir.unimas.my/id/eprint/8643/1/TPOA-FieldTripReport-Long%20Lamai%20Yusri%20Jumat.pdf Jumat, Yusri (2015) Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting. [Report] (Unpublished)
spellingShingle Q Science (General)
TK Electrical engineering. Electronics Nuclear engineering
Jumat, Yusri
Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting
title Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting
title_full Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting
title_fullStr Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting
title_full_unstemmed Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting
title_short Field Trip Report – Long Puah’s Kindergarten Solar System Installation & Long Lamai’s Telecentre Solar System Troubleshooting
title_sort field trip report – long puah’s kindergarten solar system installation & long lamai’s telecentre solar system troubleshooting
topic Q Science (General)
TK Electrical engineering. Electronics Nuclear engineering
url http://ir.unimas.my/id/eprint/8643/
http://ir.unimas.my/id/eprint/8643/1/TPOA-FieldTripReport-Long%20Lamai%20Yusri%20Jumat.pdf